|
| 1 | Supply of Top Channel Clamp for SP 23 with N&B |
| 2 | Supply of Bracing Set clamp for SP 23 with N&B |
| 3 | Supply of Bracing Set clamp for SP 23 with N&B |
| 4 | Supply of Stay Clamp S/E SP 23 with N&B |
| 5 | Supply of HT Stay Insulator |
| 6 | Supply of Stay Clamp D/E SP 23 with N&B |
| 7 | Supply of Earth wire clamp SP 23 with N&B |
| 8 | Supply of LT Shackle insulator with N&B |
| 9 | Supply of LT Stay insulator |
| 10 | Supply of J hook Clamp for AB cable |
| 11 | Supply of Suspension Clamp for AB Cable |
| 12 | Supply of LT Clamp for SP 10 with N&B |
| 13 | Supply of LT Clamp for SP 21 with N&B |
| 14 | Supply of LT Stay Clamp for SP 10 with N&B |
| 15 | Supply of LT Stay Clamp for SP 21 with N&B |
| 16 | Supply of LT Earth Clamp for SP 10 with N&B |
| 17 | Supply of LT Earth Clamp for SP 21 with N&B |
| 18 | Supply of Holding Clamo for SP 23 with N&B |
| 19 | Supply of Nut & Bolts size 65*16mm |
| 20 | Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 75 Km ST Pole SP-23 |
| 21 | Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 75 KmSmall materials |
| 22 | Head load cartage of following materials from Dump store to pit site ava. Lead distance 3 Km ST Pole SP-23 |
| 23 | Head load cartage of following materials from Dump store to pit site ava. Lead distance 3 Km Small materials |
| 24 | Excavation of earth for pole pit for errection of pole in all type of soil in size 0.9X0.6X1/6X8.5 Mtr Sp 23 pole |
| 25 | Excavation of earth for Stay pit for errection of Stay in all type of soil in size 0.6X0.6X1.2 CuMtr |
| 26 | Erection of Double Poles support in proper level and alignment alongwith Fixing all Accessories in the pole as per RESPO of SP-23. |
| 27 | Erection of Single Poles support in proper level and alignment alongwith Fixing all Accessories in the pole as per RESPO of SP-23. |
| 28 | Grouting of pole in CC ratio 1:4:8 including cost of Cement, sand, Stone ballast as per RESPO norms in size 0.45X0.45X1/9 of SP 23 Pole |
| 29 | Muffing of Pole With CC 1:3:6 Block 45cm Height from Ground level Including cost of Ballast,cement & sand Etc. |
| 30 | Fixing, tightening and nozzaling of stay with pole as per RESPO |
| 31 | Grouting of stay in CC ratio 1:4:8 including cost of Cement, sand, Stone ballast as per RESPO norms in size 0.6X0.6X0.3 |
| 32 | Laying,Spreading, Stringing and Sagging of 11 KV line in Weasel Conductor Complete including Fixing of all accessories including Binding and Jumpering as per RESPO |
| 33 | Electrode Earthing of SP/DP of GI no 6 SWG with Pole & Earth Rod and nuts & Bolts.etc Complete as per specification. |
| 34 | Guarding of line with 2 No of Continious earth wire and cross wire of GI no 8 SWG upto 2 mtr distance in each including fixing of Guarding angle as per RESPO |
| 35 | T-off connection complete 11 KV line |
| 36 | Route clearance by cutting of tree brances/proning, loping and chopping of tree for 11 KV line |
| 37 | Fabrication of Cross Arm with cutting of MS Channel/MS Angle making proper hole as per norms complete |
| 38 | Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 75 Km ST Pole SP-21 |
| 39 | Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 75 Km ST Pole SP-10 |
| 40 | Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 75 Km Small Material |
| 41 | Head load cartage of pole & material from road site to work site distance aprox 6 Km SP-21 |
| 42 | Head load cartage of pole & material from road site to work site distance aprox 6 Km SP-10 |
| 43 | Head load cartage of pole & material from road site to work site distance aprox 6 Km Small Material |
| 44 | Excavation of earth for pole pit for errection of pole in all type of soil in size 0.9X0.6X1/6X8.5 Mtr Sp 21 pole |
| 45 | Excavation of earth for pole pit for errection of pole in all type of soil in size 0.9X0.6X1/6X8 Mtr Sp 10 pole |
| 46 | Excavation of earth for Stay pit for errection of Stay in all type of soil in size 0.6X0.6X1.2 CuMtr |
| 47 | Erection of Single Poles support in proper level and alignment alongwith Fixing all Accessories in the pole as per RESPO of SP-21. |
| 48 | Erection of Single Poles support in proper level and alignment alongwith Fixing all Accessories in the pole as per RESPO of SP-10. |
| 49 | Grouting of pole in CC ratio 1:4:8 including cost of Cement, sand, Stone ballast as per RESPO norms in size 0.45X0.45X1/9 of SP 21 Pole |
| 50 | Grouting of pole in CC ratio 1:4:8 including cost of Cement, sand, Stone ballast as per RESPO norms in size 0.45X0.45X1/9 of SP 10 Pole |
| 51 | Muffing of Pole With CC 1:3:6 Block 45cm Height from Ground level Including cost of Ballast,cement & sand Etc. |
| 52 | Fixing, tightening and nozzaling of stay with pole as per RESPO |
| 53 | Grouting of stay in CC ratio 1:4:8 including cost of Cement, sand, Stone ballast as per RESPO norms in size 0.6X0.6X0.3 |
| 54 | Errection of Earthing of pole of GI no 6 SWG with Pole & Earth Rod and nuts & Bolts.etc Complete as per specification. |
| 55 | Laying, Sagging & Stringing of LTLine with ACSR Weasel conductor as Main and Neutralincludinglaying,sagging & stringing of continuous earth wire with Jumphering etc complete work up to energizing 3 Phase 4 Wire |
| 56 | Laying, Sagging & Stringing of LTLine with ACSR Weasel conductor as Main and Neutralincludinglaying,sagging & stringing of continuous earth wire with Jumphering etc complete work up to energizing 1 Phase 2 wire |
| 57 | Laying, Sagging & Stringing of LTLine with ACSR Weasel conductor as Main and Neutralincludinglaying,sagging & stringing of continuous earth wire with Jumphering etc complete work up to energizing AB Cable 1 Phase LT line Complete |
| 58 | Laying, Sagging & Stringing of LTLine with ACSR Weasel conductor as Main and Neutralincludinglaying,sagging & stringing of continuous earth wire with Jumphering etc complete work up to energizing AB Cable 3 Phase LT line Complete |
| 59 | Route clearance by cutting of tree brances/proning, loping and chopping of tree for LT line |
| 60 | Cartage of material by road transport from store Almora to dump store Upto distance 75 Km.including loading & un-loading both end. 25 KVA T/F |
| 61 | Cartage of material by road transport from store Almora to dump store Upto distance 75 Km.including loading & un-loading both end. 25 KVA T/F 63 KVA T/F |
| 62 | Cartage of material by road transport from store Almora to dump store Upto distance 75 Km.including loading & un-loading both end. 25 KVA T/F 100 KVA T/F |
| 63 | Cartage of material by road transport from store Almora to dump store Upto distance 75 Km.including loading & un-loading both end. 25 KVA T/F Small material |
| 64 | Head load cartage from Dump Store to pit site ava. Lead dist. 2Km 25 KVA T/F |
| 65 | Head load cartage from Dump Store to pit site ava. Lead dist. 2Km 63 KVA T/F |
| 66 | Head load cartage from Dump Store to pit site ava. Lead dist. 2Km 100 KVA T/F |
| 67 | Head load cartage from Dump Store to pit site ava. Lead dist. 2Km Small material |
| 68 | Mounting and fixing of TPMO in D/P with amking all connection |
| 69 | Mounting and fixing of LA (Set of 3) in D/p with all respect |
| 70 | Installation/mounting of new T/F in DP structure with fixing of angle/channel and making all HT& LT connections and its complete comissioning 25 KVA T/F |
| 71 | Installation/mounting of new T/F in DP structure with fixing of angle/channel and making all HT& LT connections and its complete comissioning 63 KVA T/F |
| 72 | Installation/mounting of new T/F in DP structure with fixing of angle/channel and making all HT& LT connections and its complete comissioning 100 KVA T/F |
| 73 | Installation/mounting of new T/F in DP structure with fixing of angle/channel and making all HT& LT connections and its complete comissioning Laying of LT cable of all Size |
| 74 | Fabrication of Cross Arm with cutting of MS Channel/MS Angle making proper hole as per norms complete |