Supply Installation Testing Commissioning Of 4 Mgd Pump Set At Moolchand Online Bps ( Ac-42 ) . , Supply Of Horizontal Split Casing Pump Head-30 Mtr. Cap-756M3 / H Model Scp-200 / 370Ha Moc:— Casing Ci, Impeller ( Lg2 ) Bronze, Casing Neck Ring B B, Shaft Ss 410, Sleeve Ss410, Fasteners Std. Sealing Arrangement Gland Packedcoupled With 120 Hp 1480 Rpm Tefc ( Ie-2 ) Ac Motor Mounted On M S Base Frame. Pump Make :- Wilo Mather & Platt / Djb Approved Make Motormake :- Crompton / Djb Approved Make , P / Fixing Of Ms Blank Flange On Suction 500 Mm And Delivery Side 300 Mm Dia. , Supply Of 300 Mm Dia.Ci Double Flanged Swing Type Non Return Valve As Per Is: 5312 Pn1.0 Ci Body Door / Bronze To Rubber Ring / Ss410 Twin Pin. Make: Kirloskar / Ivc Or Any Djb Approved Make. , Supply Of M S Flange Of Size 500 Mm Dia X 30 Mm Thick. , Supply Of M S Flange Of Size 300 Mm Dia X 30 Mm Thick. , Demolishing Rcc Work Manually By Mechanical Means Including Staking Of Steel Bars And Disposal Of Unserviceable Material Within 50 Meters Lead As Per Direction Of Engineer In Charge. , Making Of Rcc Foundation Of Size 2.5 Mtr.X1.5 Mtr.X0.6Mtr. By 1:2:4 Concrete With Proper Reinforcement ( Approximate 120 Kg Ms ) Including Providing Fixing Of 8 Nos. Foundation Bolt Of Size 450 X 25 Mm. , Fixing The M.S. Base Frame On The Rcc Foundation The Job Includes Proper Leveling And Alignment. , Supply Of M.S Reducer With Both Side Flanges Of Size 300 Mm X 250 Mm X 8 Mm Thick With Length 400 Mm. 7 , S / O M.S Reducer With Both Side Flanges Of Size 500 Mm X 300 Mm Made By 8 Mm Thick. Ms Sheet With Length 300 Mm. , Supply Of Neoprene Rubber Insertion Sheet ( 75% Neoprene ) .Make: Jyoti / Deep Jyoti / Djb Approved Make , Supply Of Nut Bolts And Washer Etc. As Per Site Requirements , Shifting Of Existing Sluice Valve Of Size 300 Mm At Delivery Side To New Nearby Location With Help Of Labour Like Fitter, Cutter, Welder, Helper And Material Like Welding Machine, Cutter Set, Welding Rod, Nut Bolt, Packing Sheet, T&P Along Loading, Unloading Complete At Site Work. , Pumping Out Water Caused By Springs, Tidal Or River Seepage, Broken Water Main Or Drain The Like. , Safety Arrangement Air Face Mask, Air Line Breathing Apparatus, Hand Blowers, Helmet, Gum Boots, Protective Bodysuits, Hand Gloves, Gas Detector, Safety Belts, Resuscitation Apparatus, Oxygen Inhalator, Portable Ladder, First Aid Box, Torch, Fire Extinguisher Etc Arranged By The Firm At Site Of Work For Safe Working , Installation &Testing The Pump Set As Per Original Position With Proper Alignment And Also Making Of All Electrical Connections, Fitting All Valves, Bends Etc. In Original Position And Testing / Commissioning On Full Load I / C Cartage Etc.