| 1 | Supply, installation, testing and commissioning of hot water piping and fittings complete with supports, hangers and specified insulation thickness. All piping shall be black mild steel Class C, ISI marked withfitting. The unit rate of piping shall include this support arrangementand hangersThe piping shall be insulated with 80Kg/ M.Cub. section density fiberglass insulationfinally coveredwithAl. Cladding complete as required. |
| 2 | 19 mm pipe with 50mm insulation. |
| 3 | 25 mm pipe with 50 mm insulation. |
| 4 | 32 mm pipe with 50 mm insulation. |
| 5 | 65 mm pipe with 50 mm insulation. |
| 6 | 80 mm pipe with 50 mm insulation. |
| 7 | Supply, installation, testing and commissioning of Sluice/Glovevalves/Gate valvewith flanges or screwed ends as required. Valves 65 mm and aboveshall of C.I. IBR86 BodyGrade A , with flanged ends and gunmetal trim, yoke type -rising stem ,P N. 1.6 andi/c flanges and valves upto 50mm shall be gunmetal non rising stem, integral seat, body test pressure 40kgf/cm Hyd (MAKE: KRILOSKAR/SANT/LEADER) |
| 8 | 200 mm |
| 9 | 125 mm |
| 10 | 80 mm |
| 11 | 50 mm |
| 12 | 40 mm |
| 13 | 19 mm |
| 14 | Supply, installation, testing and commissioning of Swing Check valve straight type( BS 5153) class 125 body materialcast iron IBR86to 93Grade A bolted cover renewable seat , renewable disc SS trim working pressure 10.54 kg/cmwith flanged endsi/c flanges complete as required .(MAKE: KRLOSKAR/SANT/LEADER) |
| 15 | 125mm |
| 16 | Supply, installation, testing and commissioning of Y type Stainer, body material cast iron IBR 86 to 93 Grade A bolted cover SS304 trim working pressure 150 psiwith flanged ends and tested to 150PSIi/c flanges (MAKE: KRLOSKAR/SANT/LEADER) |
| 17 | 125mm |
| 18 | Supplyand fixing of following size PVC insulated multicore roundcopper conductor control cableincluding making connections complete as required |
| 19 | Dismantling ofhot water supply line size200 mm diaheavy c class pipe , bend flanges and other accessories with the helpgas cutter, welding machine, chain pully and removing the glasswool, aluminium cladding, valvesand stacking the dismantle the to the suitable place |
| 20 | Dismantling ofhot water Returnline size200 mm dia heavy c class pipe , bend flanges and other accessories with the helpgas cutter, welding machine, chain pully and removing the glasswool, aluminium cladding, valvesand stacking the dismantle the to the suitable place |
| 21 | Refixing ofhot water supplyline size200 mm diaheavy c class pipe and valves ,complete with bend flanges and other accessories with the helpgas cutter, welding machine, chain pulleyi/cmaking core cutting in RCC wallcompletetheprovidingglass wool insulation , aluminium claddingcomplete as required |
| 22 | Refixing ofhot water Returnline size200 mm dia heavy c class pipe and valves ,complete with bend flanges and other accessories with the helpgas cutter, welding machine, chain pulleyi/cmaking core cutting in RCC wallcompletetheprovidingglass wool insulation , aluminium claddingcomplete as required |