|
| 1 | Excavation of RCC, REC, PSC poles above 8.00m length by using JCB/Manual with base plate. |
| 2 | Erection of RCC, REC, PSC poles above 8.00m length by using Crane/Manual with base plate. |
| 3 | Excavation of metal supports above 9m/RSJ/Rail pole/Tubular pole with Steel plate. |
| 4 | Erection of metal supports above 9m/RSJ/Rail pole/Tubular pole with Steel plate. |
| 5 | Excavation of stay set complete with fixing up stay wire Eye, Bow,Guy Shackle, Binding, Stay Plate etc. |
| 6 | Erection of stay set complete with fixing up stay wire Eye, Bow,Guy Shackle, Binding, Stay Plate etc. |
| 7 | Fixing of HT Tapping X arm / VCross arms3 1/2, 4 1/2 & 5 feet |
| 8 | Fixing of HT / LTTI Fitting |
| 9 | Fixing of HT Pin Insulators (11/33KV) |
| 10 | Fixing of HT 11KV stain disc |
| 11 | Paving and stringing of conductors of sizes 7/4.09 mm ACSR or other equivalent conductor/AB Cable. (route length) |
| 12 | Transporting of all types of polesby bullock cart or other vehicle (for all size of poles including loading and unloading) for a lead upto 5KM |
| 13 | Transporting of Distribution Transformer / Line materials from Sub stores to office/ site upto 10KM distance by engaging 1 ton capacity Minidor(lorry) |
| 14 | Loading/Unloading of variouse size of REC, RCC,PSC Poles above 8.0m length |
| 15 | Loading/Unloading of metal Poles of all sizes |
| 16 | Loading of conductor |
| 17 | Unloading of conductor |
| 18 | Loading/Unloading of line material |
| 19 | Dismandling of RCC, REC, PSC & Metal poles of all sizes including the closing of pit |
| 20 | For breaking of mass concrete of all supports |
| 21 | Dismandling of conductor of upto 7/3.35/AB Cable including Transporting the conductor to the nearest road side and stocking in coils |
| 22 | Dismandling of Cross arm clamps, TI fittings hardwares, insulators etc. |
| 23 | Earthing of poles with GI wires 4/ 6/8 SWG by coil earthing |
| 24 | Cement Concrete of ratio for individual poles shall be in the ratio of 1:2:4 (1 part Cement, 2 parts coarse sand and 4 parts 20mm aggregate stones chips)(material +labour) sleeve concreting of poles |
| 25 | clamp alteration |
| 26 | E.P.F. @13 % should be Entered by the Bidder |
| 27 | E.S.I. @3.25 % should be Entered by the Bidder |
| 28 | G.S.T. @18% should be Entered by the Bidder |