| 1 | (A) Supply:- |
| 2 | Fabrication, galvanizing, inspection and supply of various types of towers including stubs, tower extension and stub-setting templates, gantry structures as per drawings & BOM and hangers, D Shackles, pack washers, etc. |
| 3 | Hot dip galvanized, Hexagon round hexagon head transmission tower Bolts Nuts and washers for above structures as per BOM including step bolts & spring washers |
| 4 | TOWER ACCESSORIES |
| 5 | Number Plate |
| 6 | Danger Plate |
| 7 | Phase plate in sets of red,blue and yellow for Tension towers |
| 8 | Bird Guard for towers |
| 9 | Pipe type earthing material for towers |
| 10 | Circuit Plate (set of two) |
| 11 | Insulator |
| 12 | 70 KN Polymer Insulator |
| 13 | 120 KN Polymer Insulator |
| 14 | HARDWARES SUITABLE FOR ACSR PANTHER |
| 15 | Single Suspension fittings |
| 16 | Single Tension fittings |
| 17 | Double Suspension Fittings |
| 18 | Double tension fittings |
| 19 | CONDUCTOR ACCESSORIES SUITABLE FOR ACSR PANTHER |
| 20 | Vibration Dampers |
| 21 | Mid Span compression joint |
| 22 | Repair sleeves |
| 23 | Performed Armour Rod |
| 24 | Earth wire |
| 25 | 7/3.25mm GS Earthwire |
| 26 | HARDWARES & ACCESSORIES FOR GS EARTHWIRE 7/3.25MM |
| 27 | SUSPENSION CLAMP SEATED TYPE |
| 28 | TENSION CLAMP |
| 29 | MSCJ |
| 30 | Vibration Dampers |
| 31 | COPPER BOND |
| 32 | (B) Work:- |
| 33 | Survey including preparation of schedule of materials, marking of locations (Route length),GPS Survey of line with co-ordinates of each tower(The length of line shall be authenticated by GPS Survey) |
| 34 | Check survey |
| 35 | Cost of excavation of 132 KV tower foundation pits including all earth work,backfilling, levelling etc. |
| 36 | Setting of stubs including all foundation work but excludingthe cost of concerting and excavation (Rate per location) for followingtowers : |
| 37 | 132 KV DC/DE |
| 38 | Cost of concreting for all types of tower foundation including cost of cement,dewatering,shoring and shuttering,forming,curing but excluding cost of reinforcement bars |
| 39 | 1:2:4 concreting |
| 40 | Erection of Superstructure of 132KV Towers and Anchor towerand their extensions wherever required including all work above ground level excluding hoisting of insulators, hardware & accessories, butincluding fitting of danger number,phase plates, bird guard and fixing & punching for 132KV SC/DC lines |
| 41 | Tack welding of all the boltsup to the heightof one section of the tower or5 meterfrom ground level whichever is higherwith threetacks at 1200seperatiion of minimum 10 mm thickness with 10mm/12 mm electrode &applicationof Zinc rich Aluminium paint on the affectedsurfaceincludingcost of allmaterial includingtack welding of RiverCrossingtower & Anchor towers. |
| 42 | Laying, stringing, tensioning clamping, jointing etc of ACSR ‘Panther’ conductor including hoisting of insulators , fitting of all necessary hardware andaccessories i.e. fittings Armour rods, vibration dampers etc.on 02 phases of 132KV Railway TSS lines |
| 43 | Laying, stringing, tensioning clamping, jointing etc of ACSR ‘Panther’conductor including hoisting of insulators , fitting of all necessary hardware andaccessories i.e. fittings Armour rods, vibration dampers etc.on all Six phases of 132 KV DC lines |
| 44 | Laying, stringing, tensioning clamping, jointing etc. of earth wire including fitting of all necessary hardware and accessories etc |
| 45 | (a)Groundingwork includingearth worketc forpipetypegroundingincludingcost of coke & salt. |
| 46 | Installation of steel reinforcementbars in R.C.C. foundation includingcost of steel reinforcement bars with cutting, bending, placing, binding etc. |
| 47 | Resagging of 132 KV exisitng line from section to section wise work include de-stringing, de-clamping , de hositing using roller at suspension tower. work also includes Re-marking,Re-tensioningre-clamping, re-jointingetc ofACSR ‘Panther’ conductorincludinghoistingof insulators, fittingi.e.fittings Armour rods, vibration dampers etc. and all necessary hardware and accessories on two phases of 132 KV DC lines (four conductor) |
| 48 | Dismantling of Superstructure of 132KV Towers and Anchor towerand their extensions wherever required including all work above ground level excluding de hoisting of insulators, hardware & accessories, but including dismantling of danger number,phase plates, bird guard and fixing & punching for 132KV SC/DC lines. work include shifting of all material (tower part & Nut bolt) from site to designated place and proper stacking of its as directed by supervising engineer |
| 49 | Dismantling of exisiting foundation for all types of tower with the help of all special T&P. work includes braking of RCC ,chimney foundation and removal of stub, debris and soil and then levling of soil as ground level as per direction of supervising engineer |
| 50 | Dismantling of all 4 phases of existing ACSR Panther conductor of Railway TSS line , all Hardware fittings & conductor accessories e.g. armour rod, vibration dampers, insulator strings etc. of existing line and re-rolling of dismantled conductor on empty drums for re-use, safely transportation of all removed material to UPPTCL stores |