| 1 | Clearing Shrub jungle uprooting stumps and small bushes trees below 1.00 mt grith on pre-measurement etc complete and as per direction of the Engineer-in-Charge. |
| 2 | Earth work in excavation of foundation in hard soil within 50mt initial lead and initial lift 1.50mt inicluding rough dressing and breaking clods to max5cm to 7cm and laying in layers not exceeding 0.30mtin depth etc complete and as per the direction of the Engineer-in-Charge. |
| 3 | Filling in foundation and plinthwith sand, watered and rammed including cost , carriage and royalty of materials etc complete in all respect and as per the direction of the Engineer-in-Charge. |
| 4 | Providing and laying cement concrete of grade M10 with 40mm size CBHG metal of approved quality including cost,conveyance,royalty of materials with all labour charges, T&P,Cess etc complete in all respect as per the direction of the Engineer-in-Charge. |
| 5 | C.C./ R.C.C. work ofM-15 grade with 20mm and down graded black hard granite ( Crusher broken) chips including hosting and laying over theprepared surface with ramming and including cost ,carriage and royalty of all materials and curing upto required period etc. complete and as per the direction of the Engineer-in-Charge. |
| 6 | Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling the same after specified date ofcasting and disposal of debries,clear of work siteincluding cost, carraige of all materialsalong with the labour charges etc. complete and as per the direction of the Engineer-in-Charge . |
| 7 | Earth work in excavationin ordinary soil within initiallead of 50mt and initial lift of 1.50mtinicluding rough dressing and breaking clods to max5cm to 7cm and laying in layers not exceeding 0.30mt in depth and as per the direction of the Engineer-in-Charge. |
| 8 | Earth work in slushy soil (in water up to 0.60 mt depth requiring the aid of pans and vassels ) with initial lead of 50 mtand one extra lift over the initial lift of 1.50mt etc complete and as per the direction of the Engineer-in-Charge. |
| 9 | Earth work filling in foundation and plinth with excavated material including watering and ramming etc.all complete and as per the direction of the Engineer-in-Charge. |
| 10 | Dismantling and Removing cement concrete including stacking the useful matetials for reuse and removing the debries within 50mt initial lead etc complete and as per the direction of the Engineer-in-Charge . |
| 11 | Supplying,fitting and placing uncoated HYSD bar for R.C.C. worksincluding cutting, bending and binding and tying the grills and placing in position including cost of binding wire 18 to 20 gauge etc complete and as per the direction of Engineer-in-Charge . |
| 12 | Earth workfilling in canal embankment in hard soil with one extra leads over the initial lead of50 mtand initial lift 1.50 mt inicluding rough dressing and breaking clods to max 5cm to 7cm and laying in layers not exceeding 0.30mt in depthetc complete and as per the direction of the Engineer-in-Charge. |
| 13 | Providing and laying cement concrete of grade M20 with 20mm and down graded crusher broken hard granite coarse aggregate with supply of all materials labour and machinaries including hoisting and laying etc completeand as per the direction of the Engineer-in-Charge. |