Rate Contract For Erection , Maintenance And Dismantlying Of Electrical Networks ( Oh Line &Cable ) Including Ss Maintenancein Ambattursubdivision Of Ambattur Division -2 Excavation Of Structure Pole Pit 2X3x1 / 6 Th Of Height 3 Erection Of 9.14 M Rcc / 9.0 Mtr Psc / Rsj Pole 4 Transporting Of 9.14 M Poles From Road Side To Pole Pit 5 Structure Pole Mass Concreting And Coping 0.6X0.6X1.65 For Dp Structure Including Cost Of Materials And Cement. 6 Erection Of Structure Materials Complete Such As Top Channel, Seating Channel, Belting Angle, Cross Bracing.Dpdc Channel, T.I. Fitting Etc., In Complete. 7 Excavation Of Stay Pit 0.95X0.60X1.5M And Erection Of Stayset Complete 8 Sleeve Concrete For Stay Set Including All Materials 9 Erection Of Hg Fuse Set With Transport 10 Erection Of 11 Kv Ab Switch Complete Setwith Transport 11 Transformer Structure Grounding And Earthing Of Structure Complete Including Excavtion Of Earth Pit And Erection Of Earth Pipe With Salt, Coal And Earth Refiling Etc., Completeincluding Cost Of Coal And Salt 12 Erection Of Aluminium Bus Bar Pipe Complete For H.T.Bus Bar Arrangements For Dp Structure 13 For Triple Pole And Four Pole Structure 14 Erection Of L.T.Open Type Fuse Unit Including Cable Jumpering Upto The Line. 15 Providing Lt Bus Bar Arrangementsin Dt Structure Including Fixing Of Cross Arm And Insulator. 16 Erection Of H.T. Jumpering In Dp Structure Complete 17 Erection Of H.T. Las 18 Erection Of L.T. Las 19 Erection Of Dt Excluing Loading And Unloading 20 Upto 100 Kva 21 Above 100 Kva 22 Painting Of Two Coats Of Aluminium Paints For Dp Structure And Iron Materials Including Cost Of Paint And Distemper Etc. 23 Loading And Unloading Of Distribution Transformer At Site And Store. 24 Dismantling Of Failed Dt From The Structure Including Removing Ht & Lt Connection And All Other Incidental Works. ( Excluding Loading And Unloading ) 25 Upto 100 Kva 26 Above 100 Kva 27 Crane Hire Charges 28 Laying Of Ht Cable 29 Excavation Of Cable Trench 0.6 Meters Width And 1.2 Meters Depth Including Cost Of Providing Sign Boards, Danger Lights, Indication Arrangements Lead, Lift, Labour And Tools And Plants Etc., 30 Normal Road ( Earth ) 31 Tar Road 32 Concrete Road 33 Transporting Of 11 Kv Ht Cable From Departmental Stores To Work Spot By Engaging Private Vehicle Including Recoiling , Coiling And Loading And Unloading At Both Sites. 34 3X300 Sq Mm Xlpe ( 1 Drum: 200 M ) 35 3X120 Sq Mm Xlpe ( 1 Drum: 200 M ) 36 Laying Of Ht Cable 37 Laying Of 300 Sq Mm Xlpe Cable 38 Laying Of 120 Sq Mm Xlpe Cable 39 Covering Ht Cable By Cement V Trough After Covering The Cable With Good Loose Earth Including Loading, Unloading And Transport From Stores To Site And Letter Painting Of Feeding Details & Cable Size Onthe Trough 40 Refilling With Excavated Earth Layers Well Consolidated As Per Std Specification Including All Materials, Lead, Lift Etc., Complete. 41 Transport Back Any Balance Cable, Empty Drums And Other Materials If Any By Engaging Private Vehicle Including Recoiling, Coiling And Loading And Unloading At Both Sides From Workspot To Departmental Stores ( Minimum 2 Empty Drums ) 42 Laying Of Lt Cable 43 Tansport Of Lt Cable To Work Site By Engaging Vehicle Including Recoiling, Coiling, Loading & Unloading At Both Sites. 44 240 Sq.Mm ( 1 Drum - 200 M ) 45 120 Sq. Mm ( 1 Drum - 500 M ) 46 Excavation Of Cable Trench Size 0.45M X0.75 M Including Cost Of Providing Sign Boards, Danger Lights, Indication Arrangements, Lead, Lift, Labour And T&P Etc. 47 Normal Road ( Earth ) 48 Tar Road 49 Concrete Road 50 Laying Of Lt Cable 51 Laying Of 240 Sq.Mm Cable 52 Laying Of 120 Sq.Mm Cable 53 Laying Of 25 Sq.Mm Cable 54 Laying Of 16 Sq.Mm Cable 55 Refilling With Excavated Earth Layers As Per Std Specification Including All Materials, Lead, Lift Etc., Complete. 56 Erection Of Pillar Box 57 Erection Of Pillar Box Including Excavation Of Foundation Pits As Per Standard Specification 2 Nos Pillar Concrete Walls, Coping And Earthing Including Cost Of All Materials, Elec. Works, Transportion, Lead, Lift Etc., 58 4 / 6 / 8 Way & Mini Pillar Boxes For 2 Feet I-E 0.6M 59 4 / 6 / 8 Way& Mini Pillar Boxes For 3 Feet I-E 0.9M ( Rate For Hb / Con ) 60 4 / 6 / 8 Way & Mini Pillar Boxes For 4 Feet I-E 1.2 M ( Rate For Hb / Con ) 61 4 / 6 / 8 Way & Mini Pillar Boxes For 5 Feet I-E 1.5 M ( Rate For Hb / Con ) 62 Cleaning & Painting With Aluminium Paint 2 Coats & Numbering With Fdr Details 63 8 Way Pillar Box 64 6 Way Pillar Box 65 4 Way Pillar Box 66 Mini Way Pillar Box 67 Dismantling Of Pillar Box 68 Dismantling Of Old Pillar Box Including Associated Accessories, Loading On The Vehicle, Transporting, Unloading At Stores And Stacking. 69 4 / 6 / 8 Way Pillar Box 70 Mini Pillar Box 71 Miscellaneous - Oherection Work 72 Erection Of Rcc / Rsj / Psc Pole And Other Poles Including Excavation Of Pole Pit ( Pit Size 2X3X1 / 6Th Of The Length Of Poles ) 73 Excavation Ofpole Pit For 7.5 / 8 Meters 74 Erection Of Pole Pit For7.5 / 8 Meters 75 Excavaion Of Polepit For 9.14 Meters 76 Erection Of Polepit For 9.14 Meters 77 Base Concerting 30 Cm Thick For One Pole Including Of All Materials 78 Erection Of V Cross Arm 3 1 / 2Size 79 Erection Of V Cross Arm41 / 2 Size 80 Erection Of Tapping Channel 5 Size 81 Erection Of Stay Set Complete 82 Fixing Of 11 Kv Ti Fitting 83 Fixing Of 33 Kv Ti Fitting 84 Fixing Of Lt 3 Phase Cross Arm 85 Fixing Of Lt Ti Fitting 86 Fixing Of Single Phase Cross Arm 87 Lt Pin Insulator With Pin 88 Lt Shackle With Strap Sets 89 11 Kv Pin Insulator With Gi Pin 90 33 Kv Pin Insulator With Gi Pin 91 11 Kv Strain Disc With Metal Parts 92 33 Kv Strain Disc With Metal Parts 93 Fixing Of Aluminium Knob 94 Providing Of Fly Stay ( Excluding Pole Erection And Earth Excavation ) 95 Concreting Of Poles With 1:3:6 Mix, 1.1 / 2 Broken Metal Jelly And M Sand Including Coping ( M Sand, Jelly And Cement, Will Be Supplied By The Contractor ) ( Size 2X3x1 / 6Th Of Pole Height ) 96 7.5 Meters / 8 Meters Pole 97 9.14 Meters Pole ( With Coping Of 1 Dia Upto Height Of 1.1 / 2 Above Ground Level ) 98 Earthing Of Poles 99 Paving Out Conductor, Stringing And Sagging Of Line Of All Sizes Of Acsr / Aaac Conductors Of Ht / Lt Lines Including Pin Binding Of Supports And Terminating At Shackle Points Using Aluminium Roller, Including Jumpering. 100 Upto 7 / 2.59 Mm Acsr / 7 / 2.50 Aaac 101 Upto 7 / 3.35 Mm Acsr / 7 / 3.15 Aaac 102 Raccoon 7 / 4.09 Per 103 Dog Conductor 7 / 4.72 104 Numbering Of Location / Each Including Cost Of Paint And Labour 105 Providing Of Guarding Per Span Excluding Of Stay Set Erection 106 2 Wire Flat Guarding ( Split Neutral Grounding ) 107 4 Wire Flat Guarding 108 Craddle Guarding Including Earthing And Earth Pit Excavation 109 Erection Of Street Ligh Fittings 2 Feet / 4 Feet ( All Materials Supplied By The Board ) Labour Alone. 110 Erection Of Cross Bracing Set 111 Dp Structure 112 Tp Structure 113 Erection Oftop Channels 114 10 Centre 115 15 Centre 116 Erection Of33 Kv Centre Rotating Ab Switch Complete Set 117 Erection Of11 Kv Centre Rotating Ab Switch Complete Set 118 Erection Ofspacers , Line Seperators & Jumpers 119 Single Phase Spacer / Line Seperators 120 Three Phase Spacer / Line Seperators 121 Provision Of Paa Jumper Per Phase For Lt 122 Provision Of Paa Jumper Per Phase For Ht 123 Metering Set Loading & Unloading 124 Loading 125 Un Loading 126 Erection Ofmetering Sets 127 Up To 11 Metering Set 128 A ) .Loading Of Poles 129 7.5 / 8 Meters Pole / Each 130 9.14 Meters Pole Rcc / 9.0 Mtr Psc / 9.14 Rsj / Each 131 B ) .Un Loading Of Poles 132 7.5 / 8 Meters Pole ( Rcc / Psc ) / Each 133 9.14 Meters Pole Rcc / 9.0 Mtr Psc / 9.14 Rsj / Each 134 Loading Of Conductor Drum 135 Conductor Drum Of All Sizes With Conductor 136 Conductor Drum Of All Sizes Without Conductor 137 Un Loading Of Conductor Drum 138 Conductor Drum Of All Sizes With Conductor 139 Conductor Drum Of All Sizes Without Conductor 140 Maintenance Work 141 Maintenance Of Dt Structure For Various Capacity ( Pole Mounted Structure ) 142 Dp / Tp Structure Maintenance 143 Dt Maintenance 144 Replacement Of Ht Bushing Rod 145 Replacement Of Lt Bushing Rod 146 Replacement Of Gasket 147 Structure Earthi Re - Wiring . 148 Replacement Of Structure Earthing In Complete Without Material 149 Dt Structure Yard Cleaning 150 Numbering Of Location Including Cost Of Paint And Labour 151 Maintenance Of Pillars Works Such As Replacement Of Damaged Insulators Worn Out Stem Bolts, Lugs, Termination Of Cables And Dressing. 152 8 Way Pillar Box / 6 Way Pillar Box 153 4 Way Pillar Box 154 Mini Pillar Box 155 Fixingofmissing Doors In Pillars Including Materials 156 Ms Mini Pillar Door 157 Ms 4 Waypillar Door 158 Ms 6 Way / 8 Waypillar Door 159 Frp 4 Way Pillar Door 160 Maintenance Of 11 Kv Abs Only. ( Checking Of Alignment And Replacement Of Wornout Fixed And Moving Contacts Pt Insulator, Changing Earthing And Lubricating ) . 161 11 Kv Ab Switch At Structure In Work Site 162 11 Kv Ab Switch At Ss 163 Maintenance Of 33 Kv Abs Only. ( Checking Of Alignment And Replacement Of Wornout Fixed And Moving Contacts Pt Insulator, Changing Earthing And Lubricating ) . 164 33 Kv Ab Switch At Ss / Structure 165 Tree Cutting ( Tree Clearance ) 166 Cutting Of Big Tree Fouling On The Line. 167 Clearing Of Heavy Bushes 168 Jungle / Bushes / Velikathan Clearence 169 Straitening Ofleanedht / Lt Poles 170 Pin Point Location 171 Cut Point Location 172 Resagging Of Ht / Lt Lines For All Conductor Sizes 173 Re-Sagging ( Ht ) 7 / 4.72 Mm 174 Re-Sagging ( Ht / Lt ) 7 / 4.09 Mm 175 Re-Sagging ( Ht / Lt ) 7 / 3.35 Mm And 7 / 3.15 Sqmm 176 Re-Sagging ( Ht / Lt ) 7 / 2.59 Mm And 7 / 2.50 Sqmm 177 Dismantling Works 178 Dismantling Of 9.14 Mtr. Poles / Rsj / Tubular Poles 179 Dismantling Of8mtr / 7.5 Mtr Poles / 180 Dismantling Of Stay Set Complete 181 Dismantling Of Conductors Upto 7 / 2.59 Mm Including Coiling And Transporting From Workspot To Road Side 182 Dismantling Of Conductors 7 / 3.35 Mm And Above Including Coiling And Transporting From Workspot To Road Side 183 Dismantling Of Damaged 6 Way / 4 Waypillar Box 184 Dismatling Of Transformer Structure Materials 185 Dismatling Ofab Switch With Hg Fuse Set 186 Releasingof V X Arm 187 Stacking Of Materials / Scarp 188 Substation Maintenance 189 Removing Weed In Substation / Office Premises Per Sq.Mtr ( Jungle Clearance ) 190 Hot Oil Circulation For Replacement Of Tr.Oil In Pr.Tr. With Filter Machine & Loading. 191 Transporting Offilter Machine Unit& Oil Drum ( To&Fro ) 192 Cleaning Of110 Kv Breakersincluding Cts And Allied Maintenance Work 193 Cleaning Of 110 Kvlas 194 Cleaning Of 110 Kvab Switch And Applying Petroleum Jelly 195 Cleaning Of 110 Kv Power Transformer Insulators And Other Maintenance Work 196 Cleaning Of 110 Kv Bus Insulators 197 Cleaning Of33 / 11 Kv Breakersincluding Cts And Allied Maintenance Work 198 Cleaning Of 33 Kv / 11 Kvlas 199 Cleaning Of 33 / 11 Kvab Switch Including Tightening Of Bolt & Nutt And Applying Petroleum Jelly 200 Cleaning Of 33 / 11 Kv Kv Power Transformer Insulators And Other Maintenance Work 201 Cleaning Of 33 / 11 Kvbus Insulators 202 Aluminium Painting In Substation 203 33Kvstructure 204 11Kv Structure 205 Power Transformer 206 Breaker 207 Erection Ofsingle Poledtstructure 208 Loading Andunloading Of Rcc 9 / 9.14 Mtrsquare Pole 209 Excavation Ofpole Pit For 3 X 3 X 6Size 210 Erection Of Rcc 9 / 9.14 Mtrsquare Pole Including Base Plate Erection. 211 Loading , Unloading And Erection Ofhvdsdt ( 16 , 25 & 40 Kva ) 212 Excavation Of Stay Pit For 2 X 2 X 6 Size 213 Erection Of Stay Set Complete Including Base Plate 214 Single Poletransformer Structure Grounding And Earthing Of Structure Complete Including Excavtion Of Earth Pit And Erection Of Earth Pipe And Pit Filled With Mixture Of Salt, Coal And Earth Refiling Etc., Completeincluding Cost Of Coal And Salt , Fixing Of Earth Connections With Gi Wire , Bolt And Nuts. 215 Erection Oftransformerstructure Materials 216 Erection Of Hg Fuse Set 217 Erection Of 11 Kv Ab Switch Complete Set 218 Provision Of Mass Concreting Of Pole With Cement , Sand And Jelly 219 Erection Of H.T. Las 220 Erection Of L.T. Las 221 Erection Of H.T. Jumpering In Dt Structure Complete 222 Erection Of L.T.Open Type Fuse Unit Including Cable Jumpering Complete Set. 223 Erection Of Ab Switch Alone For Dp Switch