Construction Of Community Shed Along With Boundary Wall At W. No. 04Panchayat Dhanori Block Udhampur Under Pri Capex Budget For The Year2022-23 - Earth Work In Excavation By Manual Means In Trenches For Foundations, Drains, Pipes, Cables Etc. ( Not Exceeding 1.5 M In Width ) And For Shafts, Wells, Cesspitsand The Like Not Exceeding 10 Sqm On Plan, Including Dressing Of Sides And Ramming Of Bottoms Lift Upto 1.5 M, Including Getting Out Excavated Earth And Disposal Of Surplus Excavated Earth As Directed:All Kinds Of Soil : ( 1 Meter From Cutting Edge ) 2 Providing And Laying In Position Cement Concrete Of Specified Grade Including Curing But Excluding The Cost Of Centring And Shuttering. All Work Upto Plinth Level With: 1:5:10 ( 1 Cement : 5 Coarse Sand : 10 Graded Stone Aggregate 40 Mm Nominal Size ) 3 Providing And Laying In Position Cement Concrete Of Specified Grade Including Curing But Excluding The Cost Of Centring And Shuttering. All Work Upto Plinth Level With: 1:3:6 ( 1 Cement : 3 Coarse Sand : 6 Graded Stone Aggregate 20 Mm Nominal Size ) 70% 4 Dumping Of Stones Including Cost Of Stones On Horizontal Level Surface 30% 5 Reinforced Cement Concrete Work In Walls ( Any Thickness ) Including Attached Pilasters, Buttresses, Plinth And String Courses, Fillets, Columns, Pillars, Piers, Abutments, Posts And Struts Upto Floor Five Level Including Curing But Excluding Cost Of Centering Shuttering, Finishing And Reinforcement. 1:1½:3 ( 1 Cement : 1½ Coarse Sand : 3 Graded Stone Aggregate 20 Mm Nominal Size ) 6 Reinforced Cement Concrete Work In Beams, Suspended Floors, Roofs Having Slope Upto 15°, Landings, Balconies, Shelves, Chajjas, Lintels, Bands, Plain Window Sills, Staircases And Spiral Stair Cases Upto Five Level Including Curing But Excluding The Cost Of Centring, Shuttering, Finishing And Reinforcement With 1:1½:3 ( 1 Cement : 1½ Coarse Sand : 3 Graded Stone Aggregate 20 Mm Nominal Size ) 7 Steel Reinforcement For R.C.C. Work Including Straightening, Cutting, Bending, Placing In Position And Binding All Complete Upto Plinth Level Thermo-Mechanically Treated Bars Of Grade Fe-500D Or More. 8 15Mm Cement Plaster On The Rough Side Of Single Or Half Brick Wall Of Mix:1 : 6 ( 1 Cement : 6 Coarse Sand ) 9 Cement Concrete Flooring 1:2:4 ( 1Cement: 2 Coarse Sand: 4 Graded Stone Aggregate ) Finished With A Floating Coat Of Neat Cement Including Cement Slurry And Curing Complete, But Excluding The Cost Of Nosing Of Steps Etc. Complete.50 Mm Thick With 20Mm Nominal Size Stone Aggregate. 10 Brick Work With Common Burnt Clay ( Non-Modular ) Bricks Of Class Designation 7.5 In Foundation And Plinth Including Curing In :Cement Mortar 1:6 ( 1 Cement : 6 Coarse Sand ) 11 Centering And Shuttering Including Strutting, Propping Etc. And Removal Of Form Work For: 4.6.1Foundations, Footings, Bases For Columns 12 Centering And Shuttering Including Strutting, Propping Etc. And Removal Of Form Forsuspended Floors, Roofs, Landings, Balconies And Access Platforms. 13 Edges Of Slabs And Breaks In Floors And Walls 14 Centering And Shuttering Including Strutting, Propping Etc. And Removal Of Form For Columns, Pillars, Piers, Abutments, Posts And Struts. 15 Providing And Applying Plaster Of Paris Putty Of 2Mm Thickness Over Plastered Surface To Prepare The Surface Even And Smooth Complete 16 Distempering With Oil Bound Washable Distemper Of Approved Brand And Manufacture To Give An Even Shade On New Work ( Two Or More Coats ) Over And Including Priming Coat With Water Thinnable Cement Primer 17 Providing And Fixing Cib At Site Of Size 5 Feet X 3 Feet X 0.75 Feet Including Painting And Writing Complete Job. 18 Carriage Of Bricksavg 60Km Mt & 300Mtr By At 19 Carriage Of Sand Avg 60 Km Mt &300Mtr By At 20 Carriage Of Stone Avg 1Km Mt& 300Mtr By At 21 Carriage Of Agg Avg 1Km Mt By & 300Mtr B Y At