|
| 1 | Development Cost (DO NOT PUT TOTAL VALUE OF DEVELOPMENT COSTIN SL.NO 1 AND GIVE BREAK DOWN VALUE FROM SL 1.1 TO 1.61 BELOW FOR DEV.COST). SL NO.1 INTENTIONALLY LEFT BLANK) |
| 2 | Generation of technical specification (a) |
| 3 | Generation of technical specification (b) |
| 4 | Generation of engineering drawing (a) |
| 5 | Generation of engineering drawing (b) |
| 6 | Development of tooling/ dies fixtures (a) |
| 7 | Development of tooling/ dies fixtures (b) |
| 8 | Qualification of testing charges (a) |
| 9 | Qualification of testing charges (b) |
| 10 | Overhead expenditure for deveveopment activity (if any) (a) |
| 11 | Overhead expenditure for deveveopment activity (if any) (b) |
| 12 | Profit margin for development activities (a) |
| 13 | Profit margin for development activities (b) |
| 14 | Prototype development cost (SL NO.2 INTENTIONALLY LEFT BLANK AND GIVE BREAKDOWN VALUES FROM SL.NO 2.1 TO 2.61 FOR SL.NO.2) |
| 15 | Design of prototype design (a) |
| 16 | Design of prototype design (b) |
| 17 | Scrap coverage for prototype sample (a) |
| 18 | Scrap coverage for prototype sample (b) |
| 19 | Labour charges for prototype sample only (a) |
| 20 | Labour charges for prototype sample only (b) |
| 21 | Inhouse testing charges for prototype sample (a) |
| 22 | Inhouse testing charges for prototype sample (b) |
| 23 | Qualification testing charges for prototype sample (a) |
| 24 | Qualification testing charges for prototype sample (b) |
| 25 | Packing/Transportation/Forwarding charges for Prototype (a) |
| 26 | Packing/Transportation/Forwarding charges for Prototype (b) |
| 27 | Bulk Supply Cost (SL.NO.3 INTENTIONALLY LEFT BLANK AND DO NOT PUT VALUES IN SL.NO.3 AND BREAKDOWN OF SL..NO.3 IS REQUIRED TO BE FILLED FROM SL.NO 3.1 TO 3.41) |
| 28 | Total manufacturing cost of Bulk Samples (a) |
| 29 | Total manufacturing cost of Bulk Samples (b) |
| 30 | Testing charges for Bulk(if any) (a) |
| 31 | Testing charges for Bulk(if any) (b) |
| 32 | Packing/Transportation/Forwarding charges for Bulk (a) |
| 33 | Packing/Transportation/Forwarding charges for Bulk (b) |
| 34 | Profit margin Bulk Supply (a) |
| 35 | Profit margin Bulk Supply (b) |