Supply, Installation, Testing And Commissioning Of Electro-Mechanical Equipments / Irp At Water Supply Scheme Kharbatpora Ratnipora - Iron Removal Plant:Design, Supply, Installation Testing & Commissioning Including 5 Years Operation & Maintenance Of Iron Removal Plant With All Allied Works Confirming To Relevant Bis / Is Code. The Job Shall Include Cost Of All Necessary Allied And Required Items Connections, Valves, Electromechanical Work, Pipe Network Including Civil Works As Per Requirement Of Site. The Agency Shall Have To Submit Detailed Design / Constructions And Shop Drawings For Approval To The Department Before Execution Of Works. All The Equipment And Item Installed Shall Be From Reputed And Standard Manufacturers, Suppliers With Proven Track Records Approved By Required Technical Data Sheets, Certificates From Authorities And Third-Party Inspections Report Before Dispatch And Installation. The Quantity Of Water To Be Treated Is Minimum 5.0 Litres Per Second ( Lps ) . The Agency Has To Conduct A Fresh Physio-Chemical Analysis Of Water Sample Of Production Tube Well Before Execution Of Works. The Iron Removal Plant Should Remove Iron Either Below Orup To Who Standards ( = 0.3Ppm ) . The Treated Water From Plant Should Be As Per Is 10500 / 2012 Norms.Rest Ofspecification As Per Cluase 107 Of Technical Anexure Of Sbd 3 The Contractor Shall Provide All The Material Such As Filter Media, Oxidising Media, Chemicals, Disinfecting Chemicals Lubricants, Pipe Breakage ( If Any ) Replacements As Required For Smooth Operation Of The Plant For A Period Of 5 Years. The Contract Shall Include All Kinds Of Consumables Required For Smooth Operation For A Period Of 05 Years Which Shall Be Borne By The Contractor And Have To Be Supplied And Fitted / Installed By The Contractor From Time To Time And As And When Required.Cost On Account Of 05 Year Operation & Maintenance Of Plant Involving Engagement Of Sufficient No. ( Minimum Three ) Of Skilled / Trained Person In The Said Field, Who Shall Be Responsible For Exclusivelyoperating And Maintaining The Plantfor First Three Months And Subsequently Engagement Of At Least One Number Of Skilled Labour For The Next Nine Monthsand Subsequent Half Yearly Inspections By Experts Besides Imparting Training To The Staff To Be Posted By The Department At The Said Plant And The Contractor Shall Comply With The Portions Of All Labor Laws & Rules Framed There Under, Repair / Replacement Cost, Daily Water Quality Analysis, Chemical Cost, Grease, M-Oil, Annual Painting Of Structures, Water Quality Recording , Training Of Departmental Employees Etcshall Be Included In The Contract On Sitc / Turnkey Basic. The Defective Parts Shall Have To Be Replaced By The Agency / Manufacturer During The Contract Period. The Turnkey Job Shall Include All Kinds Of Consumables And Spares Required For Smooth Operation For A Period Of 05 Years And Have To Be Supplied And Installed By The Contractor From Time To Time And As And When Required. The Firm Has To Attend The Site Immediately As And When The Quality Of Water Is Found To Be Below Acceptable Norms.Rest Ofspecification As Per Cluase 108 Of Technical Anexure Of Sbd 4 Providing / Supplying And Fitting Ofg.I Flanged Rising Main At Site. The Pipe Shall Be Hot Dip Galvanized, Class-C Confirming To Is 1239. The Job Includes Providing And Fitting Of M.S Flanges Conforming To Bis 6392 / 1997 Table 17 ( Rating Pn16 ) . The Flanges Shall Be Double Welded Both From Inside And Outside Of The Pipe Using Standard Electrode Of Reputed Make.Rest Specifications As Cluase - 8 Of Sbdsize : Dn80class: C ( Heavy ) 5 Fabrication, Providing And Fitting Of Washout Tee With Arm Length 1.2 Feet Each. The Tee Shall Be Fabricated Out Of G.I Pipe With M.S Flanges Conforming To Bis 6392 / 1997 Table 17 ( Rating Pn16 ) Fastened With Weld Joints On Three Ends. Size: 80Mmclass: C Class 6 Providing And Fitting Of, Ductile Iron Double Flanged, Non-Rising Spindle Soft Seatedglandless Gate / Sluice Valves As Per Is14846 For Regulating The Water Supply Outside The Pumping Units .Size 80 Mmpn1.6Manufacture Test Certificate To Be Appended. Rest Ofspecification As Per Cluase 12Of Technical Anexure Of Sbd 7 Providing And Fitting Ofductile Iron Double Flanged, Slanted Seatswing Check Valve ( Nrv ) As Per Is 5312. Size 80 Mm Pn 1.6Manufacture Test Certificate To Be Appended. Rest Ofspecification As Per Cluase 13Of Technical Anexure Of Sbd 8 Fabrication Of Gantry Mechanism / Cgi Shed / Angle Iron Sleeping Bedby Way Of Providing Structural Steel In Built Up Sections , Trusses And Framed Work, Including Cutting , Hoisting , Fixing In Position And Applying A Priming Coat Of Approved Steel Primer All Complete Welded 9 Providing, Fitting, Testing And Commissioning Ofvoltage Stabilizeras Per Specifications Below: Type Of Voltage Controller: Manually Operated Copper Wound, 3-Phase, Ac Power Supply Multi Step.Complete Specifications As Per Cluase - 44 Of Sbdrating::50Kva 10 Providing And Fitting Of 3-Core Flatsubmersible Copper Cable Conforming To Is: 694 ( Part 1St ) – 1964 & Is: 694 ( Part 2Nd ) - 1964 For Submersible Pumping Unit And Other Electrical Equipments . The Cable Connections Terminal Shall Be Fitted With Copper Thimbles Of Required Size. Size:10Sqmm 11 Supply, Installation, Testing & Commissioning Of 1000Va Full Sine Wave Power Inverter ( Make: Microtek / Luminous ) Including Providing / Installation Of 12V, 180Ah Tubular Inverter Battery With Trolley And Cover. ( Make: Amaron / Exide ) With 2-Core 6Mm2 Cu Wiring As Per Site Requirement Along With Other Accessories Like Ss-Combine ( 02 No’S ) , 3-Pin Plugs Etc Of Reputed Make For Proper Fitment And Installation Of The Item. 12 Providing, Laying & Fixing With Adhesive / Bonding Material Of Insulation Rubber Mats On The Floor Of The Pump House, Covering Area Around Electro-Mechanical Machinery For Safeguarding The Life & Limb Of The Workmen Due To Possible Leakage Of Current & Short Circuit. The Floor Surface Shall Be Made Good & Shall Be Free From Dust, Grease, Foreign Material & Moisture Free. The Mats Shall Be As Per Is 15652:2006 & Shall Have The Following Specifications: -Composition: Rubber ( Synthetic Mats For Electrical Purpose ) Thickness: - 2.5Mm Size: - 1M Wide.The Rubber Mats Shall Be Accepted With Manufacturers Test Certificate. 13 Providing Of Good Quality Convenience And Utility Items Specicifications Are As Per Clause-57 Oftechnical Annexure Of Sbd. 14 Providing Of Bamboo Ladders 18 Feet Long Along With 15 Feet Long Link Rods And Ht Glove Pair ( 01 No Each ) 15 Creation Of Pope Mounted , Outdoor Type Electric Sub Stationby Way Ofs / I / T / C Of 11 / 0.433 Kva , 3 Phase Distribution Transformer With Bimetallic Terminal Connectors Energy Level -2 Aluminum Wound Specifications Conforming To Is : 1180 ( Part 1 ) 2014 With Latest Amendments Certificaterating:63Kva Ht Transformer, 3 Phase ( Level 2 ) . Manufactures Test Certicicate To Be Apended And Rest Of Specification As Per Cluase 26 Of Sbdnote: The Scope Of The Work Shall Include Obtaining Of Necessary Inspection / Clearance Certificate From The Concerned Department For All The Required Equipment. The Testing And Commissioning Shall Be Completed Only After Obtaining Above Certificate 16 Providing And Fitting Of 19 Mm Thick Multilayered Ply Sheet Of Size 6 X 3 Feet , 2 Nos Including Cutting , Fixingall Complete Including Painting Of The Play Sheet By One Coat Of Primer And Two Coats Of Enamel Paint