| 1 | Raw Water:-Electric driven horizontal split case centrifugal raw water pump capable of delivering 3750 Lpm dischargeagainst a total head of 100 mtr (2900 rpm as per existing motor of MPS/ IPS-I) complete with coupling, coupling guards & MS fabricated heavy duty base plate for mounting above pump and motor.(2 install + 1 spare) |
| 2 | shifting 03 no. & Installation of 02 no existing 150 KW motor from MPS to Raw water |
| 3 | shifting & Installation of 02 no. existing 150 KW Starter from MPS to Raw water |
| 4 | Repair / modification of existing control MS sheet steel fabricated dust and vermin proof cubical type floor mounting control panel . |
| 5 | Power wiring and earthing material. |
| 6 | 70 Sq. mm ,PVC insulated 3- core, Cu conductor submersible cable (Multirun) |
| 7 | Jointing material |
| 8 | Earthing with GI earth plate 600 mm x 600 mm x 6 mm including accessories, and providing masonry enclosure with providing and fixing 25 mm x 5 mm GI strip on surface or in recess for connections with charcoal, salt as required. |
| 9 | replacement of existing main piping /common header including repairing of valves |
| 10 | Guages each Set Consist following items- |
| 11 | Pressure guageof range 0-20 Kg/cm2. |
| 12 | Compound guageof range 0- (+/-) 1 kg./cm2 -1 Nos. |
| 13 | Heavy duty brass control cock, MS nipple,pipe,elbow etc. |
| 14 | Tools such as spanner set, pliers, hammers, screw drivers, crimping tools, bearing pullers etc. required for maintenance of pumping plants. |
| 15 | 3 Ton capacity, 25 m lift chainpulley |
| 16 | Testing of pumps at works |
| 17 | Testing of pumping plants at site |
| 18 | Internal and external electrification of pump house |
| 19 | Painting of pumping plants |
| 20 | Intermediate Raw Water:-Electric driven horizontal split case centrifugal raw water pump capable of delivering 3750 Lpm dischargeagainst a total head of 100 mtr (2900 rpm as per existing motor of MPS/ IPS-I) complete with coupling, coupling guards & MS fabricated heavy duty base plate for mounting above pump and motor.(2 install + 1 spare) |
| 21 | shifting 03 no. & Installation of 02 no existing 150 KW motor from IPS to intermediate Raw water |
| 22 | shifting & Installation of 02 no. existing 150 KW Starter from MPS & IPS to intermediate Raw water |
| 23 | Repair / modification of existing control MS sheet steel fabricated dust and vermin proof cubical type floor mounting control panel . |
| 24 | Power wiring and earthing material. |
| 25 | 70 Sq. mm ,PVC insulated 3- core, Cu conductor submersible cable (Multirun) |
| 26 | Jointing material |
| 27 | Earthing with GI earth plate 600 mm x 600 mm x 6 mm including accessories, and providing masonry enclosure with providing and fixing 25 mm x 5 mm GI strip on surface or in recess for connections with charcoal, salt as required. |
| 28 | replacement of existing main piping /common header including repairing of valves |
| 29 | Guages each Set Consist following items- |
| 30 | Pressure guageof range 0-20 Kg/cm2. |
| 31 | Compound guageof range 0- (+/-) 1 kg./cm2 -1 Nos. |
| 32 | Heavy duty brass control cock, MS nipple,pipe,elbow etc. |
| 33 | Tools such as spanner set, pliers, hammers, screw drivers, crimping tools, bearing pullers etc. required for maintenance of pumping plants. |
| 34 | Rubber resistance sheet size 1 m x 2 m x 0.025m. |
| 35 | 3 Ton capacity, HOT crane with travelling arrangement. |
| 36 | Testing of pumps at works |
| 37 | Testing of pumping plants at site |
| 38 | Internal and external electrification of pump house |
| 39 | Painting of pumping plants |
| 40 | MPS:-Electric driven horizontal multi stage centrifugal clear water pump capable of delivering 1900 lpm dischargeagainst a total head of 440 mt complete withbase frame, coupling and coupling guards (3 installed+1 spare) |
| 41 | 250 kw Electric motor squirrel cage,TEFC type, 2980 rpm suitable to operate on 415+/- 10% volts, 3 phases 50 c\sAC supply (3 installed+1 spare) |
| 42 | upgradation of existing 150 KW starter to 250 KW capcity starter including replacement of Contactors/ relay/ATS/ wiring etc. |
| 43 | repairing of existing MS sheet steel fabricated dust and vermin proof cubical type floor mounting control panel and converting it to single pump outgoing (making 2 outgoing blind) and 03 no output for light/ Automation/ External lighting |
| 44 | fabrication of cubical type floor mountingpanelfor installation of 1 no ACB 630 A (from existing panel) for controlling power supply to one no starter including all required meters and protectios etc including repairing of ACB as reqiured . |
| 45 | Power wiring and earthing material. |
| 46 | 400 mm2 size 3.5 core aluminium conductor armoured XLPE sheathed cable of 1.1 KV grade. (multirun) |
| 47 | 95 mm2 ,PVC insulated 3 core Flat submersible Copper cable (multirun .) |
| 48 | Jointing material |
| 49 | Earthing with GI earth plate 600 mm x 600 mm x 6 mm including accessories, and providing masonry enclosure with providing and fixing of 25 mm x 5 mm GI strip on surface or in recess for connections with charcoal, salt as required. |
| 50 | replacement of existing main piping /common header including repairing of valves |
| 51 | Guages (each set consist following items) :- |
| 52 | Pressure guage with control cock and fittings of range 0 - 100 kg/cm2 - 2 Nos. |
| 53 | Compound guage with control cock and fittings of range 0 - (+/-) 1 kg/cm2 -1 No. |
| 54 | Heavy duty brass control cock, MS nipple,pipe,elbow etc. |
| 55 | Internal and external electrification of pump house |
| 56 | Testing of pumps at works |
| 57 | Testing of pumping plants at site |
| 58 | Painting of pumping plants |
| 59 | IPS-I:-Electric driven horizontal multi stage centrifugal clear water pump capable of delivering 1700 lpm dischargeagainst a total head of 460 mt complete withbase frame, coupling and coupling guards (3 installed+1 spare) |
| 60 | 250 kw Electric motor squirrel cage,TEFC type, 2980 rpm suitable to operate on 415+/- 10% volts, 3 phases 50 c\sAC supply. |
| 61 | upgradation of existing 150 KW starter to 250 KW capcity starter including replacement of Contactors/ relay/ATS/ wiring etc. |
| 62 | repairing of existing MS sheet steel fabricated dust and vermin proof cubical type floor mounting control panel and converting it to single pump outgoing (making 2 outgoing blind) and 03 no output for light/ Automation/ External lighting |
| 63 | fabrication of cubical type floor mountingpanelfor installation of 1 no ACB 630 A (from existing panel) for controlling power supply to one no starter including all required meters and protectios etc including repairing of ACB as reqiured . |
| 64 | Power wiring and earthing material. |
| 65 | Complete power wiring to carry out wiring from Transformer to pump house control panel to starters to motors as below |
| 66 | 400 mm2 size 3.5 core aluminium conductor armoured XLPE sheathed cable of 1.1 KV grade. (multirun) |
| 67 | 95 mm2 ,PVC insulated 3 core Flat submersible Copper cable (multirun .) |
| 68 | Jointing material |
| 69 | Earthing with GI earth plate 600 mm x 600 mm x 6 mm including accessories, and providing masonry enclosure with providing and fixing of 25 mm x 5 mm GI strip on surface or in recess for connections with charcoal, salt as required. |
| 70 | replacement of existing main piping /common header including repairing of valves |
| 71 | Guages (each set consist following items) :- |
| 72 | Pressure guage with control cock and fittings of range 0 - 100 kg/cm2 - 2 Nos. |
| 73 | Compound guage with control cock and fittings of range 0 - (+/-) 1 kg/cm2 -1 No. |
| 74 | Heavy duty brass control cock, MS nipple,pipe,elbow etc. |
| 75 | Internal and external electrification of pump house |
| 76 | Testing of pumps at works |
| 77 | Testing of pumping plants at site |
| 78 | Painting of pumping plant |
| 79 | Transformers:-S.I.T.C. of transformers at different pumping stations including carting etc. |
| 80 | FOR MPS-500KVA |
| 81 | FOR IPS-I -500KVA |
| 82 | Earthing as per I.E rules for transformer at MPS and IPS-I |
| 83 | Supply and laying of 150 mm2, AI conductor, 3 core PVC sheathed XLPE HT cable(FOR MPS and IPS-I) |
| 84 | HT cable jointing kit |
| 85 | Fencing of transformer (MPS and IPS-I) |
| 86 | Operation and Maintenance for a period of 06 months |