Work Of 132 Kv Modipuram-Sardhana Line & 132 Kv Modipuram- Kankarkhera-Ii Line On Common Towers Due To Infringement In Ncrtc Corridor Near 220 Kv Substation Modipuram Under Etd-Ii Meerut.-2 Towers And Nut & Bolts 3 Fabrication, Galvanising, Inspection & Supply Ofmc Tower Including Stubs, Extensions & Stub Setting Template, As Per Drawing & Bom.Ms Material. ( K Rao Design ) 4 Fabrication, Galvanising, Inspection & Supply Ofmc Tower Including Stubs, Extensions & Stub Setting Template, As Per Drawing & Bom. Ht Material. ( K Rao Design ) 5 Fabrication, Galvanising, Inspection & Supply Ofdc Tower Including Stubs, Extensions & Stub Setting Template, As Per Drawing & Bom. ( Kptl Design Towers ) 6 Hot Dip Galvanised Nuts & Bolts For Mc & Dc Type Towers 7 Tower Accessories 8 Number Plate 9 Danger Plate 10 Phase Plate 11 Pipe Type Earthing Material For Towers 12 Hardware Suitable For Acsr Zebra 13 Singletension Fitting 14 Double Tension Fitting 15 Vibration Damper 16 Repair Sleeves 17 Mid Span Compression Joint 18 220 Kv 160 Kn Polymer Insulator 19 Hardware Suitable For Acsr Panther 20 Singletension Fitting 21 Double Tension Fitting 22 Vibration Damper 23 Repair Sleeves 24 Mid Span Compression Joint 25 132 Kv 120 Kn Polymer Insulator 26 Hardware Suitable For Earthwire 27 Tension Clamp For 7 / 10 Swg Earthwire 28 Vibration Damper For 7 / 10 Swg Earthwire 29 Mid Span Compresion Joint For 7 / 10 Swg Earthwire 30 Tension Clamp For 7 / 9 Swg Earthwire 31 Vibration Damper For 7 / 9 Swg Earthwire 32 Mid Span Compresion Joint For 7 / 9 Swg Earthwire 33 Work 34 Survey Including Prepration Of Profile & Schedule Of Materials, Marking Of Locations ( Route Length ) 35 Check Survey & Final Peg Marking. ( Route Length ) 36 Cost Of Excavation Of Tower Foundation Pits Including All Earth Work, Back Filling Watering And Leveling. ( Kptl Design Towers ) 37 Cost Of Excavation Of Tower Foundation Pits Including All Earth Work, Back Filling Watering And Leveling. The Work Has To Be Done Manually. ( K Rao Design ) 38 Setting Of Stubs Including All Foundation Work But Excluding Cost Of Concreting And Excavation ( Rate Per Location ) For Following M / C And Dc Towers:- 39 Md+0 40 Mc+0 41 Db+5 42 Dc+5 43 Cost Of Concreting For All Types Of M / C / Conventionaltower Foundation Including Cost Of Cement Core Sand, Stone Grid, Dewatering, Shoring And Shuttering, Forming, Curing But Excluding Cost Of Reinforcement Bars With 1:2:4 Mix Concrete ( Rcc ) . 44 Installation Of Steel Reinforcement Bars In Rcc Foundation Including Cost Of Cutting, Welding, Binding And Placing Them In Foundation Pits. 45 Erection Of Super Structure Of Mc / Dc Towers And Their Extensions Including All Works Above Ground Level And Fitting Of Danger , Number & Phase Plate, Bird Guard Etc But Excluding Hoisting Of Insulator, Hardware & Accessories. 46 Tack Wedling Of All The Bolts Up To The Height Of One Section Or 5 Mtr. From Ground Level Whichever Is Higher With Three Tacks Of 10Mm / 12Mm Elctro;; / De & Application Of Zinc Rich Point On The Affected Surface Including Cost Of Materials. 47 Carriage Of New Material Such As Conductor, Hardwares, Tower Parts Etc From Store To Site. 48 Laying , Stringing, Tensioning Clamping, Jointing Etc Of Acsr Panther Conductor Including Hoisting Of Insulator, Fitting Of All Necessary Hardware And Accessoriesi.E. Fittings Armour Rods, Vibration Dampers Etfc. On All Six Pahses Of 132 Kv Dc Lines. 49 Laying & Stringing Of 7 / 10 Swg Eartwire Including Fixing Of All Type Of Hardware Fittings On 132 Kv Lines. 50 Laying , Stringing, Tensioning Clamping, Jointing Etc Of Acsr Zebra Conductor Including Hoisting Of Insulator, Fitting Of All Necessary Hardware And Accessoriesi.E. Fittings Armour Rods, Vibration Dampers Etfc. On All Three Pahses Of 220 Kv S / C Lines. 51 Laying & Stringing Of 7 / 9 Swg Eartwire Including Fixing Of All Type Of Hardware Fittings On 220 Kv Lines. 52 Destringing Of Acsr Panther Conductor Wherever Required.The Work Includes All Stringing Work Required For Proper Comopletion Of Work. All The Six Conductors 53 Destringing Of Ground Wire Including Of All Accessories Making Proper Bundle Of Earthwire Including Safe Carriage Of All Material From Site To Store. 54 Dismantalling Of Existing Foundation In All Respect. 55 Dismantalling Of 132 Kv Towers. 56 Dismantalling Of Monopole. 57 Pre Insattaltion Of Assembly Of Ers Structure At 400Kv S / S Greater Noida By Tightening Of Joints, Nuts & Bolts, Installtion Of Guy Wires, Making Holes For Anchor Installer Complete In All Respect. 58 Installtion Of Ers Structuree., Fixing Of Guy Wires & Other Accessories & Hardwares. Hoisting Of Insulators Complete In All Respect. 59 Stringing Of All The Three Acsr Panther Conductor Alongwith Hw Fitting By Making Cutpoint At Ers Tower & Stringing Between Ers & Towers For Both Ends Of Ers 60 Arrangement Of Watch & Ward Round The Clock With Atleast 04 Nos. Security Guards, Security At Ers Location And Also At The Time Of Dimantalling Of Ers Conductor & Hardware With Hardware Fittings. 61 De-Stringingof All The Three Acsr Panther Conductor Alongwith Hw Fitting For Removal Of Ers. 62 Dismantalling Of Ers Structuree., Removal Of Guy Wires & Other Accessories & Hardwares. Dehoistingof Insulators Complete In All Respect. 63 Safe Transportation Including Loading, Unloading Of Ers Structure Alongwith Accessories, Guy Wires Etc From The Store At 400Kv S / S Greater Noida To Site Near Modipuram & Vice Versa. ( Approx Distance=100 Km )