Supply Of Supply Of Msdacsupply Of Msdac, Supply, Installation, Testing And Commissioning Of Multi Section Digital Axle Counter ( Msdac ) , Complete System Including Central Evaluators, Processors, Final Track Clearance Relay For Each Track Section, Reset Boxes, Monitoring Consoles, Diagnostic Pc / Laptop Of Suitable Configuration, Lv Boxes, Detection Points, Mushroom Housing For Track Side Electronic, Deflector Plates And All Other Accessories, As Per Rdsos Specification No. Rdso / Spn / 176 / 2013 ( Ver. 3 ) Or Latest And Oem / Manufacturers Specification. ( Per Detection Point / Dp ) . It Includes Transportation Cost To Depot & To Site Also. The Following Items Will Be Provided By The Contractor At His Own Cost A ) Housing Of Outdoor Equipment If Required B ) Maintenance Free Earthing ( Supply & Installation ) C ) Auto Resetting Facilities Along With Hardware & Software If Required In Case Of Dual Detection With Existing Dctc / Msdac D ) Msdac Networking With Central Evaluator At Pc / Networking Equipment, Only E1 Channel Will Be Provided By Railway, All Hardware Related Equipment ( Card For Communication, Separate Evaluator For Up & Dn Networking Between Evaluator To Evaluator To Be Provided Except Ofc Line ( Dark ) Which Will Be Provided By Railway. Manual Resetting Through Resetting Box At Station To Be Provided As Per Site Requirement. Note:- Vendor Should Be Approved Source Or Should Submit Notarized Authorization Of Approved Source For Supply Installation And Commissioning / Warranty As Per Contract. Vendor To Submit Proposed Dp Layout Design Of Msdac And Get Approved From Consignee Incharge Before Supply. System Should Work On Ofc / Quad / Both Media. Changeover Facility To Be Provided As Per Site Requirement. Material Is To Be Inspected By Rdso ( 1 Nos=1Dp ) . Installation, Testing And Commissioning Of Msdac Track Device ( Double Rail Contact ) Also Includes Digging Of Trench From Nearest Location Box, Track Crossing, Supply And Laying Of Duct Pipe For Laying Of Sensor Cable From Nearest Location Box, Laying Of Sensor Cable In Duct Pipe With Making Its Terminations, Fixing Of Deflector Plates / Mushroom Etc. Installation, Testing And Commissioning Of Msdac Includes ( I ) Central Evaluator Wiring From Ct Rack, Power Supply Wiring From Ips, Wiring Of Re-Set Box / Lb Box. ( Ii ) Supply Of Shielded Cable And Power Cable Of Required Conductor Size As Per Oem Checklist. The Power Supply Wiring Cable Should Not Be Less Than 10 Sq. Mm. Pvc Wire. ( Iii ) Earthing Of Evaluator To Be Done As Per Oems Specification With Required Material Provided By The Firm. ( Iv ) Painting And Wiring Work On Evaluator As Per The Site Requirement. ( V ) All The Power Cables Should Be Laid In Pvc Pipe With Proper Separation From Other Cables. Note:- 1. All Accessories Required For Installation Will Be Provided By The Contractor. 2. Inspection: - For Accessories - Consignee. , Supply, Installation, Testing And Commissioning Of Multi Section Digital Axle Counter ( Msdac ) , Complete System Including Central Evaluators, Processors, Final Track Clearance Relay For Each Track Section, Reset Boxes, Monitoring Consoles, Diagnostic Pc / Laptop Of Suitable Configuration, Lv Boxes, Detection Points, Mushroom Housing For Track Side Electronic, Deflector Plates And All Other Accessories, As Per Rdsos Specification No. Rdso / Spn / 176 / 2013 ( Ver. 3 ) Or Latest And Oem / Manufacturers Specification. ( Per Detection Point / Dp ) . It Includes Transportation Cost To Depot & To Site Also. The Following Items Will Be Provided By The Contractor At His Own Cost A ) Housing Of Outdoor Equipment If Required B ) Maintenance Free Earthing ( Supply & Installation ) C ) Auto Resetting Facilities Along With Hardware & Software If Required In Case Of Dual Detection With Existing Dctc / Msdac D ) Msdac Networking With Central Evaluator At Pc / Networking Equipment, Only E1 Channel Will Be Provided By Railway, All Hardware Related Equipment ( Card For Communication, Separate Evaluator For Up & Dn Networking Between Evaluator To Evaluator To Be Provided Except Ofc Line ( Dark ) Which Will Be Provided By Railway. Manual Resetting Through Resetting Box At Station To Be Provided As Per Site Requirement. Note:- Vendor Should Be Approved Source Or Should Submit Notarized Authorization Of Approved Source For Supply Installation And Commissioning / Warranty As Per Contract. Vendor To Submit Proposed Dp Layout Design Of Msdac And Get Approved From Consignee Incharge Before Supply. System Should Work On Ofc / Quad / Both Media. Changeover Facility To Be Provided As Per Site Requirement. Material Is To Be Inspected By Rdso ( 1 Nos=1Dp ) . Installation, Testing And Commissioning Of Msdac Track Device ( Double Rail Contact ) Also Includes Digging Of Trench From Nearest Location Box, Track Crossing, Supply And Laying Of Duct Pipe For Laying Of Sensor Cable From Nearest Location Box, Laying Of Sensor Cable In Duct Pipe With Making Its Terminations, Fixing Of Deflector Plates / Mushroom Etc. Installation, Testing And Commissioning Of Msdac Includes ( I ) Central Evaluator Wiring From Ct Rack, Power Supply Wiring From Ips, Wiring Of Re-Set Box / Lb Box. ( Ii ) Supply Of Shielded Cable And Power Cable Of Required Conductor Size As Per Oem Checklist. The Power Supply Wiring Cable Should Not Be Less Than 10 Sq. Mm. Pvc Wire. ( Iii ) Earthing Of Evaluator To Be Done As Per Oems Specification With Required Material Provided By The Firm. ( Iv ) Painting And Wiring Work On Evaluator As Per The Site Requirement. ( V ) All The Power Cables Should Be Laid In Pvc Pipe With Proper Separation From Other Cables. Note:- 1. All Accessories Required For Installation Will Be Provided By The Contractor. 2. Inspection: - For Accessories Consignee. , Supply, Installation, Testing And Commissioning Of Multi Section Digital Axle Counter ( Msdac ) , Complete System Including Central Evaluators, Processors, Final Track Clearance Relay For Each Track Section, Reset Boxes, Monitoring Consoles, Diagnostic Pc / Laptop Of Suitable Configuration, Lv Boxes, Detection Points, Mushroom Housing For Track Side Electronic, Deflector Plates And All Other Accessories, As Per Rdsos Specification No. Rdso / Spn / 176 / 2013 ( Ver. 3 ) Or Latest And Oem / Manufacturers Specification. ( Per Detection Point / Dp ) . It Includes Transportation Cost To Depot & To Site Also. The Following Items Will Be Provided By The Contractor At His Own Cost A ) Housing Of Outdoor Equipment If Required B ) Maintenance Free Earthing ( Supply & Installation ) C ) Auto Resetting Facilities Along With Hardware & Software If Required In Case Of Dual Detection With Existing Dctc / Msdac D ) Msdac Networking With Central Evaluator At Pc / Networking Equipment, Only E1 Channel Will Be Provided By Railway, All Hardware Related Equipment ( Card For Communication, Separate Evaluator For Up & Dn Networking Between Evaluator To Evaluator To Be Provided Except Ofc Line ( Dark ) Which Will Be Provided By Railway. Manual Resetting Through Resetting Box At Station To Be Provided As Per Site Requirement. Note:- Vendor Should Be Approved Source Or Should Submit Notarized Authorization Of Approved Source For Supply Installation And Commissioning / Warranty As Per Contract. Vendor To Submit Proposed Dp Layout Design Of Msdac And Get Approved From Consignee Incharge Before Supply. System Should Work On Ofc / Quad / Both Media. Changeover Facility To Be Provided As Per Site Requirement. Material Is To Be Inspected By Rdso ( 1 Nos=1Dp ) . Installation, Testing And Commissioning Of Msdac Track Device ( Double Rail Contact ) Also Includes Digging Of Trench From Nearest Location Box, Track Crossing, Supply And Laying Of Duct Pipe For Laying Of Sensor Cable From Nearest Location Box, Laying Of Sensor Cable In Duct Pipe With Making Its Terminations, Fixing Of Deflector Plates / Mushroom Etc. Installation, Testing And Commissioning Of Msdac Includes ( I ) Central Evaluator Wiring From Ct Rack, Power Supply Wiring From Ips, Wiring Of Re-Set Box / Lb Box. ( Ii ) Supply Of Shielded Cable And Power Cable Of Required Conductor Size As Per Oem Checklist. The Power Supply Wiring Cable Should Not Be Less Than 10 Sq. Mm. Pvc Wire. ( Iii ) Earthing Of Evaluator To Be Done As Per Oems Specification With Required Material Provided By The Firm. ( Iv ) Painting And Wiring Work On Evaluator As Per The Site Requirement. ( V ) All The Power Cables Should Be Laid In Pvc Pipe With Proper Separation From Other Cables. Note:- 1. All Accessories Required For Installation Will Be Provided By The Contractor. 2. Inspection For Accessories Will Be Done By Consignee.