1 Dismantling And Removal Of R.R. Masonry Sl.No 1 Of Scope Of Work Dismantling And Removal Of R.R. Masonry / Brick Masonry / Plain Cement Concrete Work, Etc. Upto 5M Height And Dumping The Debris Within A Lead Of 500M Etc. Complete As Per The Direction Of Engineer-In-Charge. 2 2 Dismantling And Removal Of Rcc Foundation Sl.No 2 Of Scope Of Work Dismantling And Removal Of Rcc Foundation / Column / Slab / Beam, Etc. In All Heights Upto 8M From Floor Level Including All Necessary Scaffolding And Dumping The Debris Within A Lead Of 500M, And Returning The Ms Rod To Store, Etc., Complete As Per The Direction Of Engineer-In-Charge. 3 3 Earthwork Excavation For Foundation Sl.No 3 Of Scope Of Work Earthwork Excavation For Foundation In All Types Of Loose / Hard Soil And Depositing The Spoils With An Initial Lead Of 20M And Lift Upto 2M Including Refilling Etc., Complete As Per The Direction Of The Engineer-In-Charge. 4 4 Supplying, Providing And Laying Pcc 1:4:8 Sl.No 4 Of Scope Of Work Supplying, Providing And Laying Pcc 1:4:8 Mix For Foundation / Flooring Work Using 40Mm And Below Grade Hard Blue Granite Jelly Including All Form Works, Mixing, Laying, Compaction, Consolidation And Curing, Etc. Complete As Per Standard Specifications And As Directed By The Engineer-In-Charge. 5 5 Supplying, Providing And Laying Pcc 1:2:4 Sl.No 5 Of Scope Of Work Supplying, Providing And Laying Pcc 1:2:4 Mix For Foundation / Flooring Work / Kerb Wall Drainage Wall Using 20Mm And Below Grade Hard Blue Granite Jelly Including All Form Works, Mixing, Laying Consolidation And Curing, Etc. Complete As Per Standard Specifications And As Directed By The Engineer-In-Charge. 6 6 Supplying, Providing And Fixing Twisted Reinforcement Sl.No 6 Of Scope Of Work Supplying, Providing And Fixing Twisted Reinforcement Is 1786 Hysd Bars Fe500d / Fe550d ( Tmt Bars - Tata / Agni / Jsw ) Including Fabrication, Cutting, Bending, Cold Tying, With Overlapping To The Standard Length Wherever Necessary And Placing The Reinforcement In Position As Per The Direction Of Engineer-In-Charge Including Binding, Provision Of Spacer Bars, Cover Blocks And All Other Incidental Charges, Etc. Complete For All Rcc Works As Per Standard Specification And As Per The Direction Of Engineer-In-Charge. 7 7 Supplying, Providing And Laying Cement Concrete Sl.No 7 Of Scope Of Work Supplying, Providing And Laying Cement Concrete 1:1.5:3 For Rcc Works Using 20Mm And Below Grade Hard Blue Granite Jelly With Specified Reinforcement And All Mixing, Laying, Compaction, Leveling, Consolidation And Curing, Etc., Including The Cost Of Centering / Shuttering Work, Complete As Directed By Engineer-In-Charge. 8 8 Earth Filling For Foundation Sl.No 8 Of Scope Of Work Earth Filling For Foundation / Flooring Work Using Departmental Sand Including All Transportation Of Filling Sand From Hup To Site, Levelling Works, Compaction, Consolidation, Etc. Complete As Per Standard Specifications And As Directed By The Engineer-In-Charge. 9 9 Supplying And Spreading 150Mm Consolidated Thick Gravel Sl.No 9 Supplying And Spreading 150Mm Consolidated Thick Gravel Of Approved Quality Above The Refilled Earth Surface With Watering, Levelling Works, Compaction And Consolidating, Etc. Complete As Per The Direction Of Engineer-In-Charge. 10 10 Supplying, Providing And Laying Brick Masonry In Cm 1:6 Sl.No 10 Supplying, Providing And Laying Brick Masonry In Cm 1:6 Using Well Burnt Country Brick Of Minimum Size 22.9X11.2X7cm For Foundation / Kerb Wall / Wall Upto 4.5M Height From Ground Level Including All Scaffolding, Staging, Curing, Etc. Complete Complying With Standard Specifications And As Directed By The Engineer-In-Charge. 11 11 Supplying, Providing & Laying Rr Masonry Foundation Sl.No 11 Of Scope Of Work Supplying, Providing & Laying Rr Masonry Foundation / Wall / Retaining Wall In Cement Mortar 1:6 For Construction Of Wall Using Hard Blue Granite Stone, Etc. Complete From 1M Below Ground Level To 3M Height Above Ground Level With Neat Finishing Including Proper Pointing & Necessary Scaffolding Work Etc Complete As Per Standard Specifications And As Directed By The Engineer-In-Charge. 12 12 Supplying, Plastering With Cm 1:4 Mix 15Mm Sl.No 12 Of Scope Of Work Supplying, Plastering With Cm 1:4 Mix 15Mm Thick One Coat Floated Hard & Trowelled Smooth Etc For Floors & Walls Upto 8M Height With Neat Finishing And Necessary Grouting, Etc. Complete Complying With Standard Specifications And As Directed By The Engineer-In-Charge. 13 13 Supplying, Plastering With Cm 1:2 Mix 20Mm Sl.No 13 Of Scope Of Work Supplying, Plastering With Cm 1:2 Mix 20Mm Thick One Coat Floated Hard & Trowelled Smooth Etc For Ornamental / Sculpture Works Upto 10M Height With Neat Finishing And Necessary Grouting Including Scaffolding Work Etc. Complete Complying With Standard Specifications And As Directed By The Engineer-In-Charge. 14 14 Supplying, Providing, Cutting And Fixing Of B Class Gi Pipe Sl.No 14 Of Scope Of Work Supplying, Providing, Cutting And Fixing Of B Class Gi ( Galvanised Iron ) Pipe Of Size 1X2 ( Horizontal Member ) By Imbedding In Brick Wall Post. The B Class Gi Horizontal Members Shall Require To Be Erected 3 Rows At Equal Spacing With Required Clambing Including Painting With Two Coat With 1St Quality Enamel Paint Of Approved Shade ( Berger / Asian / Nippon ) Over A Coat Of Enamel Zinc-Chromate / Zinc Phosphate Primer ( Berger / Asian / Nippon ) , Etc. Complete As Per The Direction Of Engineer-In-Charge. 15 15 Supplying, Providing, Hoisting And Fixing Of Roof Trusses Sl.No. 15 Of Scope Of Work Supplying, Providing, Hoisting And Fixing Of Roof Trusses Including Purlin, Rafter, Sleeves False Rafter, Base Plate Bracing And Lacing, Etc. Fabricated Out Of G.I Tubular Square / Rectangular Heavy ( C-Class ) Pipes ( Purlin-1 1 / 4; Rafter - 1 1 / 2; Bracing -1 ) ( Tata / Jindal ) Conforming To Relevant I.S. Code And Providing G.I. Tubular Square / Circular Post Heavy ( C-Class ) ( 3X3 ) ( Tata / Jindal ) And Proper Welding With Base Plates And Base Fixing With Concrete Including Painting With Two Coats Of Approved Enamel Paints ( Asian / Berger / Nippon ) Over A Coat Of Zinc Chromate Primer Etc. Complete. Over The Roof Truss Fixing With 0.47Mm Thick Powder Coated Sheet / Powder Coated End Curved Sheet As Per Sl.No.15 Of Scope Of Work 16 16 Supply Of Paint And Painting Two Coat 1St Quality Emulsion Paint Sl.No 16 Supply Of Paint And Painting Two Coat With 1St Quality Emulsion Paint Of Approved Shade ( Asian / Berger / Nippon ) For Internal & External Surface Of Walls, Ceiling Over A Coat Of Cement Primer ( Berger / Asian / Nippon ) Upto 5 Mtr Height From Ground Level Including Thorough Scrapping, Cleaning, Removal Of Dirt And All Tools & Tackles, Scaffolding, Etc. And Applying One Coat Putty Touch-Up Works For External Wall Wherever Required, Etc. Complete As Directed By The Engineer-In-Charge. 17 17 Dismantling And Removing Of Damaged Steel Structural Sl.No 17 Of Scope Of Work Dismantling And Removing Of Damaged Steel Structural Fully / Partly Such As Roof / Side Cladding, Purlin, Trusses, Bracings, Columns & Gates, Etc. And Re-Fixing The Damaged Members Of Dismantled Structures With Dismantled Good Steel Members ( Necessary Fabrication To Be Done If Required ) / New Fabricated Steel Structures ( Under Item No.18 ) With Welded / Bolted Joints With The Existing Structures, Etc. Upto 15M Height From Floor Level As Directed By The Engineer-In-Charge ( Rate Excluding The Cost Of Good Re-Usable Steel & New Fabricated Steel Under Item No.18 ) . 18 18 Supply Of Steel And Fabricating The Portion Sl.No 18 Of Scope Of Work Supply Of Steel And Fabricating The Portion / Full Of Truss / Purlins / Bracing / Columns / Gates, Etc Including Cutting, Welding, Jointing To Suit The Dismantled Portion For Replacing The Worn-Out Members Of The Existing Trusses / Purlins / Bracings / Column / Gates Or Full Members, Etc. Complete As Directed By Engineer-In-Charge. ( Rate Including Cost Of All Materials ) ( Structural Steel Conforming To Is 2062:2011 Of Make Tisco / Sail / Rinl ) . 19 19 Supplying And Painting Two Coats With Epoxy Smoke Grey Paint Sl.No 19 Supplying And Painting Two Coats With Epoxy Smoke Grey Paint ( Asian / Berger / Shalimar ) Over A Coat Of Epoxy Zinc-Chromate / Zinc-Phosphate Primer ( Asian / Berger / Shalimar ) Including Chipping, Scrapping And Cleaning The Surface, Etc. Complete As Directed By Engineer-In-Charge. 20 20 Dismantling, Lowering The Existing A.C Sl.No 20 Dismantling, Lowering The Existing A.C. / Aluminium Sheets / Frp Corrugated Sheet / Durashine Powder Coated Sheet 0.47Mm Thick From Roof / Side Cladding Of The Buildings Without Any Damage Either For Repairing The Existing Steel Roof Trusses & Purlins Or Replacing The Damaged Sheets, Etc. And Supplying Re-Fixing The Same Area With New 0.47Mm Thick Powder Coated Sheet / Powder Coated End Curved Sheet [ Tata - Durashine / Equivalent Brand ] With 8Mm Dia G.I. Polymer Coated Bolts & Nuts ( Aargee Associates / Equivalent Make ) , Washer, Bolt Cap To Suit The Existing M.S. Angle / Channel, Purlin, Etc. Complete As Per Standard Specification And As Directed By Engineer-In-Charge. ( Rate Including Cost Of All Materials ) . 21 21 Dismantling, Lowering The Existing A.C Sl.No 21 Dismantling, Lowering The Existing A.C. / Aluminium Sheets From Roof / Side Cladding Of The Buildings Without Any Damage Either For Repairing The Existing Steel Roof Trusses & Purlins Or Replacing The Damaged Sheets, Etc. And Supplying, Re-Fixing The Same Area With New Non Asbestos Cement Corrugated ( Ramco-Greencor / Everest- Hi-Tech ) Colour ( Blue ) Sheet Roof Sheet Including Necessary Corner / Bargeboard With 8Mm Dia G.I. Polymer Coated Bolts & Nuts ( Aargee Associates / Equivalent Make ) To Suit The Existing M.S. Angle / Channel, Purlin, Etc. Complete As Per Standard Specification And As Directed By Engineer-In-Charge. ( Rate Including Cost Of All Materials ) . 22 22 Engagement Of Fitter For Miscellaneous Work Sl.No 22 Engagement Of Fitter For Miscellaneous Work Complete As Directed By The Engineer-In-Charge. ( Required Materials Will Be Issued By Company On Free Of Cost ) . 23 23 Engagement Of Labour ( Mazdoor ) For Miscellaneous Works Sl.No 23 Engagement Of Labour ( Mazdoor ) For Miscellaneous Works Complete As Directed By The Engineer-In-Charge. ( Required Materials Will Be Issued By Company On Free Of Cost ) .