Pipe Line And Allied Works- 1 Fabrication And Erection , Testing And Commissioning Of600 / 500 Mm Nb Cs / Gi / Ms Pipelines Of Standardthickness, At All Elevations , Abovegroundlevelincluding Erection Of All Fittings. 2 Fabrication And Erection , Testing And Commissioning Of450 / 400 Mm Nb Cs / Gi / Mspipelinesofstandardthickness, At All Elevations, Abovegroundlevelincluding Erection Of All Fittings. 3 Fabricationand Erection , Testing And Commissioning Of350 / 300 / 250Mmnbcs / Gi / Mspipelinesof Standardthickness, Atallelevations, Aboveground Levelincluding Erection Of All Fittings 4 Fabricationand Erection , Testing And Commissioning Of200 / 150 Mm Nb Cs / Gi / Ms Pipe Lines Of Standard Thickness, Atallelevations, Abovegroundlevelincludingerection Of All Fittings 5 Fabricationand Erection , Testing And Commissioning Of125 / 100 / 80Mmnbcs / Gi / Mspipelinesofstandardthickness, Atallelevations, Abovegroundlevelincluding Erection Of All Fittings 6 Fabrication And Erection , Testing And Commissioning Of 65 / 50 / 40 Mm Nbcs / Gi / Mspipelinesofstandardthickness, Atallelevationsabovegroundlevelincluding Erection Of All Fittings. 7 Fabricationanderection, Hydraulictesting At 10Kg / Cm2testingandcommissioningof25 / 20 / 15 Mm Nbcs / Gi / Mspipelines Of Standard Thickness Of , At Allelevationsabovegroundlevelincluding Erection Of All Fittings. 8 Fabricationanderection, Testing And Commissioning Of 500Mmnbsspipelines Of Standard Thickness, At Allelevations, Above Ground Level Including Erection Of All Fittings. 9 Fabrication And Erection , Testing And Commissioining Of 450 / 400Mmnbss Pipe Lines Of Standard Thickness, Atall Elevations, Above Ground Level Including Erection Of All Fittings. 10 Fabricationand Erection , Testing And Commissioning Of 350 / 300Mmnbss Pipe Lines Of Standard Thickness, Atall Elevations, Above Ground Level Including Erection Of All Fittings. 11 Fabricationand Erection , Testing And Commissioning Of 250 / 200Mm Nb Ss Pipe Lines Of Standard Thickness , Atall Elevations, Above Ground Level Including Erection Of All Fittings. 12 Fabricationanderection, Testing And Commissioning Of 150 / 100 / 80Mmnb Ss Pipe Lines Of Standard Thickness, At All Elevations, Abovegroundlevelincludingerection Of All Fittings. 13 Fabricationand Erection , Testing And Commissioning Of 65 / 50 / 40 Mm Nb Ss Pipe Lines Of Standard Thickness , Atall Elevations, Above Ground Level Including Erection Of All Fittings. 14 Fabricationand Erection , Testing And Commissioning Of 25 / 20 / 15Mm Nb Ss Pipe Lines Of Standard Thickness, Atall Elevations, Above Ground Level Including Erection Of All Fittings. 15 Cuttingandremovingthe Damaged / Corroded Portion Of 25 / 20 / 15Mm Nb Ss Pipelines Of Standard Thickness Upto A Maximumlengthof1mand Replacing With New Pipe Of Same Size. The Workshall Include Fabrication, Erection, Testing And Commisioning, At All Elevations Above Ground Level Including All Charges. 16 Cuttingandremovingthe Damaged / Corroded Portion Of 65 / 50 / 40Mm Nb Ss Pipelines Of Standard Thickness Upto A Maximumlengthof1mand Replacing With New Pipe Of Samesize.The Work Shall Includefabrication, Erection, Testingandcommisioning, Atallelevations Above Ground Level Including All Charges. 17 Cuttingandremovingthe Damaged / Corroded Portion Of 25 / 20 / 15Mmnb Cs / Gi / Ms Pipelines Of Standard Thickness Upto A Maximum Length Of 1M And Replacing With New Pipe Of Same Size.The Work Shall Include Fabrication, Erection, Testingand Commisioning, At All Elevations Above Ground Level Including All Charges. 18 Cuttingandremovingthe Damaged / Corroded Portion Of 65 / 50 / 40Mmnb Cs / Gi / Ms Pipelines Of Standard Thickness Upto A Maximum Length Of 1M And Replacing With New Pipe Of Same Size.Theworkshallinclude Fabrication, Erection, Testingandcommisioning, At All Elevations Above Ground Level Including All Charges. 19 Erectionof600 / 500 Mm Nb Manual Valve On ( Pulp Valveonly ) Cs / Ms Pipe Line. 20 Erectionof450 / 400Mmnbmanual Valve ( Pulp Valveonly ) On Cs / Ms Pipe Line. 21 Erectionof350 / 300Mm Nb Manual Valve On Cs / Ms Pipeline. 22 Erectionof250 / 200Mm Nb Manual Valve On Cs / Ms Pipeline. 23 Erection Of 150 / 100 / 80 Mm Nb Manual Valve On Cs / Ms Pipeline. 24 Erectionof50 / 40Mmnbmanual Valve On Cs / Ms Pipeline. 25 Erectionof25 / 20 / 15 Mm Nb Manual Valve On Cs / Ms Pipeline. 26 Erectionof 500 / 450 Mm Nb Manual Valve ( Pulp Valveonly ) On Ss Pipe Line 27 Erectionof400 / 350 / 300 Mm Nb Manual Valve On Ss Pipeline. 28 Erection Of 250 / 200 Mm Nb Manual Valve On Ss Pipe Line. 29 Erectionof150 / 100 / 80Mm Nb Manual Valve On Ss Pipeline. 30 Erection Of 50 / 40 Mm Nb Manual Valve On Ss Pipe Line. 31 Erectionof25 / 20 / 15Mmnbmanual Valve On Ss Pipeline. 32 Dismantling Of 500 / 600Mmnbcs / Ms / Gipipelinesincludingvalves, Flanges, Bendsreducersetc At Allelevations. 33 Dismantlingof450 / 400 Mmnbcs / Ms / Gipipelinesincludingvalves, Flangesbendsreducersetcat Allelevations 34 Dismantlingof350 / 300Mmnbcs / Ms / Gipipelinesincludingvalves, Flanges, Bendsreducersetcatallelevation 35 Dismantlingof250 / 200Mmnbcs / Ms / Gipipelinesincludingvalves, Flanges, Bendsreducersetc At Allelevation 36 Dismantlingof150 / 100 / 80Mmnb Cs / Ms / Gi Pipe Linesincludingvalves, Flanges, Bendsreducersetc At Allelevation. 37 Dismantlingof65 / 50 / 40Mmnb, Cs / Ms / Gipipelinesincludingvalves, Flanges, Bends Reducers Etc. At Allelevation 38 Dismantlingof25 / 20 / 15Mmnbcs / Ms / Gipipe Linesincludingvalves, Flanges, Bendsreducersetcatallelevations. 39 Dismantling Of 500 / 450Mmnbsspipelinesincluding Valves, Flanges Bends Etc At All Elevation. 40 Dismantling Of 400 / 350 / 300Mmnbsspipelinesincluding Valves, Flanges, Bends Etc At All Elevation 41 Dismantling Of 250 / 200 / 150Mmnbsspipelinesincluding Valves, Flanges Bends Etc At All Elevation 42 Dismantlingof100 / 80Mmnb Ss Pipe Lines Includingvalves, Flanges Bends Etc At All Elevation. 43 Dismantlingof50 / 40Mmnbss Pipe Lines Includingvalves, Flanges Bends Etc At All Elevation 44 Dismantlingof25 / 20 / 15 Mm Nb Ss Pipe Lines Includingvalves, Flanges Bends Etc At All Elevation. 45 Erectionof500 / 450 / 400 / 350Mmnbcontrol Valve & Flowmeter On Cs / Ms / Ss Pipe Line. 46 Erectionof300 / 250 / 200Mmnbcontrol Valve & Flowmeter On Cs / Ms / Ss Pipe Line. 47 Erection Of 150 / 100 / 80 Mm Nb Control Valve & Flow Meteron Cs / Ms / Ss Pipe Line. 48 Erectionof50 / 40 Mm Nb Control Valve & Flow Meter Oncs / Ms / Ss Pipe Line. 49 Erectionof25 / 20 / 15 Mm Nb Control Valve & Flow Meteron Cs / Ms / Ss Pipe Line. 50 Fabrication & Erectionofpipelinesupports&Platforms 51 Fabrication Of 600 / 500 Mm Nb Cs / Ms Bend. 52 Fabrication Of 450 / 400 / 350 Mm Nb Cs / Ms Bend. 53 Fabrication Of 300 / 250 / 200 Mm Nb Cs / Ms Ben 54 Fabrication Of 150 / 100 Mm Nb Cs / Ms Bend 55 Fabrication Of 80 / 50 / 40 Mm Nb Cs / Ms Bend. 56 Fabrication Of 25 / 20 / 15 Mm Nb Cs / Ms Bend 57 Fabrication Of 500 / 450 Mm Nb Ss Bend. 58 Fabrication Of 400 / 350 / 300 Mm Nb Ss Bend. 59 Fabrication Of 250 / 200 Mm Nb Ss Bend. 60 Fabrication Of 150 / 100 Mm Nb Ss Bend. 61 Fabrication Of 80 / 50 / 40 Mm Nb Ss Bend 62 Fabrication Of 25 / 20 / 15 Mm Nb Ss Bend. 63 Fabricationof600 / 500 / 450 Mm Nb Cs / Ms Reducer Upto 4Steps Down. 64 Fabrication Of 400 / 350 Mm Nb Cs / Ms Reducer Upto 4 Stepsdown. 65 Fabricationof300 / 250 / 200 Mm Nb Cs / Ms Reducer Upto 4Steps Down. 66 Fabrication Of 150 / 100 Mm Nb Cs / Ms Reducer Upto 4 Stepsdown 67 Fabricationof80 / 50 / 40Mmnbcs / Ms Reducer Upto 4Steps Down. 68 Fabrication Of 500 / 450 Mm Nb Ss Reducer Upto 4Steps Down. 69 Fabrication Of 400 / 350 / 300 Mm Nb Ss Reducer Upto 4Steps Down. 70 Fabrication Of 250 / 200 Mm Nb Ss Reducer Upto 4 Stepsdown 71 Fabricationof150 / 100Mm Nb Ss Reducer Upto 4 Stepsdown. 72 Fabricationof80 / 50Mmnbss Reducer Upto 4 Stepsdown 73 Erectionof 600 / 500 / 450 Mm Nb Flange Joint On Existingcs / Ms / Pipe Line 74 Erectionof 400 / 350 / 300 Mm Nb Flange Joint On Existingcs / Ms Pipe Line. 75 Erectionof250 / 200Mmnbflange Joint On Existingcs / Ms Pipe Line. 76 Erectionof150 / 100 / 80 Mm Nb Flange Joint On Existingcs / Ms Pipe Line. 77 Erectionof 50 / 40 Mm Nb Flange Joint On Existing Cs / Mspipe Line. 78 Erectionof25 / 20 / 15Mmnb Flange Joint On Existingcs / Ms Pipe Line 79 Erectionof500mm Nb Flange Joint On Existing Ss Pipeline. 80 Erectionof450 / 400 Mm Nb Flange Joint On Existing Sspipe Line 81 Erectionof 350 / 300 / 250 Mm Nb Flange Joint On Existingss Pipe Line. 82 Erectionof200 / 150 Mm Nb Flange Joint On Existing Sspipe Line 83 Erectionof100 / 80Mm Nb Flange Joint On Existing Sspipe Line. 84 Erectionof50 / 40Mmnb Flange Joint On Existing Sspipe Line. 85 Erectionof 25 / 20 / 15 Mm Nb Flange Joint On Existing Sspipe Line 86 Weldingof 1 Inch Dia On Cs / Ms / Gi. 87 Cutting Of 1 Inch Dia On Cs / Ms / Gi. 88 Welding Of 1 Inch Dia On Ss 89 Cutting Of 1 Inch Dia On Ss. 90 Earthexcavationforcabletrenchesincluding Backfillingin All Classes Of Soil With Lead And Lift To Adepthof Minimum 1M And Width 0.5M.The Excess Earth Tobe Transported To A Location Shown By The E-I-C. 91 Applyingprotectivewrappingcoatonburried Pipesincludingcostof All Materials. Cleaning The Surfacethoroughlyapplyonecoatofzinc Phosphate Primerfollowed By One Coat Of Anti Corrosive Bituminous Blackpaint, Thenwrapping Spirally Withpipewrap Bt Anticorrossivebituminoustape2mm Thick Of M / S Stp Onelayer With Minimum 25 Mm Over Lap Between Two Adjoininglayers Then Apply Second Coatanticorrossivebituminous Black Paint Then, Wrapping Second Layer Withpipewrapbtanticorrossivebituminoustape ( 2Mmthick ) As Per Procedure And Directed By Eic. 92 Applyingprotectivewrappingandcoatingon Buriedpipes Including Cost Of Materials. Cleaning The Surfacethroughly Apply One Coat Of Shali Prime Pw Bt Primer Ofm / S Stp Limited And Wrapping Spiraly Using Pipe Wrap-Bt2mmthickintwolayerof M / S Stp Limited As Perprocedure And As Directed By Eic