Supply Of Distribution Transformer For Msb, Gds , Pfcc Unit As Per Technical Specifications For Numaligarh Refinery Limited Supply Of Distribution Transformer For Msb, Gds , Pfcc Unit As Per Technical Specifications For Numaligarh Refinery Limited , Supply Of Distribution Transformers For Msb, Gds & Pfcc Unit For Nrep Project , Design, Detail Engineering, Procurement, Manufacturing, Testing & Inspection, Factory Acceptance Testing ( Fat ) , Packing, Forwarding, Transportation, Route Survey ( If Required ) , Site Acceptance Testing ( Sat ) And Supply Till Site Including Commissioning Spares, Mandatory Spares, Special Tools & Tackles, Consumables, 2 Year Operational Spares For Distribution Transformers For Msb Unit Including Online Condition Monitoring System For Each Transformer With Common Data Concentrator Along With First Fill Of Oil And 10% Extra Oil In Non-Returnable Drums As Mentioned In This Specification To Be Installed At Numaligarh Refinery Limited ( Nrl ) , Assam As Specified In Material Requisition. 2.0 Mva, 6.6 / 0.433 Kv, Onan, Dyn11, Z=7.5 % ( No Negative Tol. ) , Octc Range ±5% In Steps Of 2.5% Tag No. For Msb Unit - 1U64-Ss14-Tr-331A / B ( 2 Nos. ) & 1U64-Ss14-Tr-332A / B ( 2 Nos. ) &1U64-Ss14-Tr-333A / B ( 2 Nos. ) &1U64-Ss14-Tr-334A / B ( 2 Nos. ) , Design, Detail Engineering, Procurement, Manufacturing, Testing & Inspection, Factory Acceptance Testing ( Fat ) , Packing, Forwarding, Transportation, Route Survey ( If Required ) , Site Acceptance Testing ( Sat ) And Supply Till Site Including Commissioning Spares, Mandatory Spares, Special Tools & Tackles, Consumables, 2 Year Operational Spares For Distribution Transformers For Gds & Pfcc Unit Including Online Condition Monitoring System For Each Transformer With Common Data Concentrator Along With First Fill Of Oil And 10% Extra Oil In Non-Returnable Drums As Mentioned In This Specification To Be Installed At Numaligarh Refinery Limited ( Nrl ) , Assam As Specified In Material Requisition. 2.5 Mva, 6.6 / 0.433 Kv, Onan, Dyn11, Z=7.5% ( No Negative Tol ) ., Octc Range ±5% In Steps Of 2.5% Tag No. For Gds & Pfcc Unit -1U64-Ss15-Tr-316A / B ( 2 Nos. ) , 1U64-Ss15-Tr-317A / B ( 2 Nos. ) , 1U64-Ss15-Tr-318A / B ( 2 Nos. ) , 1U64-Ss15-Tr-319A / B ( 2 Nos. ) , 1U64-Ss15-Tr-320A / B ( 2 Nos. ) , 1U64-Ss15-Tr-321A / B ( 2 Nos. ) , Charges For Training For Distribution Transformers For Msb Unit As Per Mr , Perdiem Charges For Training At Site As Mentioned In The Mr , Lumpsum Charges For Training At Oems Work As Mentioned In The Mr , Charges For Training For Distribution Transformers For Gds & Pfcc Unit As Per Mr , Perdiem Charges For Training At Site As Mentioned In The Mr , Lumpsum Charges For Training At Oems Work As Mentioned In The Mr , Charges For Site Supervision Of Erection / Installation Andtesting For Supply Of Distribution Transformers For Msb, Gds & Pfcc Unit For Nrep Project , Per Diem Charges For Upto 8 Hours Work On Normal Working Days. , Overtime Rate / Hour Beyond Normal 8 Hours Work On Normal Working Days. , Overtime Rate / Hour For Work On Weekly Off Days / Holidays ( As Applicable To Refinery Site ) .