| 1 | Fabrication & Erection Jobworks |
| 2 | Dismantling up to 12” |
| 3 | Fabricate Erection up to 12” dia size |
| 4 | Dismantling above 12” |
| 5 | Fabricate and erection above 12” |
| 6 | Flanges |
| 7 | Flanges, Bends, Nipples, Reducer & blind e.t.c Dismantling and erection up to 12”dia size |
| 8 | Flanges, Bends, Nipples, Reducer blind e.t.c Dismantling and erection above 12” dia size |
| 9 | Dismantling of only flanges from old pipe lines for reuse |
| 10 | fabrication of flanges from M.S. plate |
| 11 | Fabrication of bend up to 24” |
| 12 | Fabrication of bend above 24” |
| 13 | Fabrication of Flanges, Nipples, Reducer up to 24” |
| 14 | Fabrication of Flanges, Nipples, Reducer above 24” |
| 15 | Valves |
| 16 | Replacement of valve up to 12” dia |
| 17 | Fitting of new valve up to 12” dia |
| 18 | Replacement of valve above 12” |
| 19 | Fitting of new valve above 12” |
| 20 | Fitting of angle valve above 20” to 42” |
| 21 | C.I. Pipe line & cross |
| 22 | Replacement of CI pipe 6” |
| 23 | Replacement of C.I. Cross 6” |
| 24 | M.S. & S.S plate fabricated jobs |
| 25 | (tanks, gutter, chute, bottle, cone etc.) |
| 26 | Fabrication, Erection & Replacement of old tanks above 3 mm plate |
| 27 | Structure work (Staging, columns, trusses, purline pipe support, beam, channel support, platform, stairs) |
| 28 | Dismantling Fabrication & erection |
| 29 | Hand Railing |
| 30 | Replacement of old railing |
| 31 | Fabrication & erection of new railing |
| 32 | Rake Carrier/BE/B.C./R.B.C./corss carrier troughs. Runners, tanks bottoms |
| 33 | Replacement of old troughs, tanks bottoms |
| 34 | Replacement of old 3 mm thick S.S. plates |
| 35 | Replacement of old M.S. Runners |
| 36 | Replacement of old donga plate |
| 37 | Replacement of carriers beam |
| 38 | Patch work |
| 39 | Replacement of M.S. Patches |
| 40 | S.S. tubes (Evaporators/Juice heaters) |
| 41 | Replacement of old Brass tubes & SS tube with hydraulic testing |
| 42 | Brass Tubes & SS tube (Pans) |
| 43 | Replacement of old Brass tubes & SS tube with hydraulic testing |
| 44 | Replacement of old water gutter/Ritz of factory building |
| 45 | Replacement of old G.O./A.C.C. sheets of factory/godowns |
| 46 | Replacement of damaged ammonia coils of Evaporators |
| 47 | Replacement of damaged ammonia coils of pans |
| 48 | Replacement of damaged ammonia coils of juice heater |
| 49 | Welding of top plate of condensate bottle of Quad after removing flange |
| 50 | Dismantling Fabrication and erection condensate/juice receiving bottle Quad/juice heater/o-lever/Pan |
| 51 | Welding and grinding of sq/ coupling of mills Roller as per given profile. |
| 52 | Welding and Grinding of tail Bar (both end) as per given profile. |
| 53 | Replacement of worn-out partition plate of juice heater |
| 54 | Replacement of worn-out-partition plate of juice heater |
| 55 | Welding, Hard facing with weighing of fibrizer hammers to equal weight |
| 56 | Repair of sprockets teeth as per given profile |
| 57 | Hard facing of under feed rollers |
| 58 | Arcing of mill rollers |
| 59 | Replacement of wet scrubber sieve made of angles and flat |
| 60 | Replacement of feed pipe, Nipple, Valve of batch type pan |
| 61 | Replacement of save all of batch type pan or evaporator body with support |
| 62 | Fabrication and creation of new bed of pump with motor & gear box |
| 63 | Fabrication and erection of main hole including blind for evaporator body or vacuum pan e.t.c |
| 64 | Repairing/ Welding of crystallizer broken Shaft |
| 65 | Dismantling & Fitting of Drive gear wheel of crystallizer |
| 66 | Dismantling/fab./erection of sulpher furnace coil |
| 67 | Modification of right angle valve above 14” from metallic seat to rubber seat. |
| 68 | Modification & Repair of different type valve up to 12” from metallic seat to rubber seat |
| 69 | Replacement of runner sugar elevator |
| 70 | Turbine’s extraction pipe lines to be taken out towards D.M. plant side |
| 71 | Welding of pads on cane carrier slates |
| 72 | Modification of screw conveyor |
| 73 | Dismantling the tower of syrup sulphiter & Juice sulphiter lower it ground floor & assemble it again. |
| 74 | Dismantling, fabrication and erection of Masse cuite Gutters. |
| 75 | Dismantling, fabrication and erection of coil of crystallizer – B& C |
| 76 | Dismantling, Fabrication and erection of suction cone of ID fan |
| 77 | Dismantling, fabrication and erection of damper of ID fan |
| 78 | Dismantling, fabrication and erection of expansion joint |
| 79 | Dismantling, fabrication and erection of boiler ducting and other ducting or side plate etc |
| 80 | Replacement of Water jacket of sulphar furnace |
| 81 | Dismantling fabrication and erection of furnace gas coolers |
| 82 | Dismantling, fabrication and erection of after burner of sulphur furnace |
| 83 | Fabrication & erection of m.s. pipe Bagasse cello blower |
| 84 | Fabrication & erection M.S. casing for Bagasse cello blower |
| 85 | Fabrication & erection M.S. fan for Bagasse cello blower |
| 86 | Replacement of damaged washing coils of Pan |
| 87 | Dismantling, fabrication and erection of feed pipe of ¾ “ coil dia 2 ½ “ |
| 88 | Dismantling, Fabrication and erection steam coil 1”dia 8ft. coun. c/f m/c |
| 89 | Support the save-all in side & outside of coun. Pan |
| 90 | Vapor pipe support in side of pan/quard |
| 91 | Modification of pan discharge valve |
| 92 | Replacement of molasses guard top ring (dia 1170 X 5”) of coun. M/C |
| 93 | Dismantling, fabrication and erection of mud mixture box |
| 94 | Repairing of center shaft of door |
| 95 | Dismantling, fabrication and erection of agitator tray of o-lever |
| 96 | Repairing of Bottom & top side rubber grooving of juice heater |
| 97 | Dismantling, fabrication and erection of O-liver vacuum condensate bottle |
| 98 | Dismantling, fabrication and erection of DSM screen |
| 99 | Dismantling, fabrication and erection of wet scrubber M.S. screen. |
| 100 | Repairing the multi tray of hopper |
| 101 | Fabrication and erection of multi try of hopper |
| 102 | Dismantling, fabrication and erection of bottom of clarifier |
| 103 | Dismantling, fabrication and erection of gas cooler |
| 104 | Dismantling, fabrication and erection injection pump suction pipe jail |
| 105 | Running welding of any job |
| 106 | Dismantling, Fabrication and erection of discharge scrapper casing |
| 107 | Dismantling, fabrication and erection cane unloader sq. bar of bridge & trolley |
| 108 | Dismantling, repairing of fibrizer ms. Casing with ss plate welded |
| 109 | Dismantling, fabrication and erection of grabs ms box |
| 110 | Hard facing of grabs finger |
| 111 | Replacement & erection of any type jali |
| 112 | Dismantling, fabrication and erection of feed pipe of coun. Pan |
| 113 | Dismantling, fabrication and erection of pan/quad umbrella |
| 114 | Dismantling, fabrication and erection of pan/quad ‘J’ pipe |
| 115 | Dismantling, Fabrication and erection of pan/quad &JH condensed box |
| 116 | Dismantling, fabrication and erection of SS truff inter rack main rack carriers e.t.c. |
| 117 | Repairing of mill juice tray & bottle aluminum |
| 118 | Dismantling, fabrication and erection down take pipe of quad/pan |
| 119 | Dismantling, fabrication and erection 2” coil of malter/syrup tank |
| 120 | Dismantling, fabrication and erection of vertical crystallizer coils |
| 121 | Repairing of vertical crystallizer coil |
| 122 | Fabrication and erection of air ducting at c/f station 1X1 feet |
| 123 | Dismantling, fabrication and erection of all turbine oil & pressure gauges line 3/8” & ½” |
| 124 | Dismantling, fabrication and erection of crystallizer arms |
| 125 | Dismantling, fabrication and erection of I channel of mill house crane with alignment |
| 126 | Repairing of arrester box of B&C Cont. Pan with support |
| 127 | Replacement of steam pipe line, drain etc, with valve |
| 128 | Dismantling , fabrication and erection of mud mixture casing |
| 129 | Replacement/fitting of rubber gutka size 42/45 &98/102 With tie rod at evaporator/pan/juice heater. |
| 130 | Welding of tie rod of evaporator/pan/juice heater |
| 131 | Dismantling & Fabrication & Erection of Vapour pipe pan/ Quad |
| 132 | Replacement of Damaged Portion of Save all & Roof of Cont. Pan 4 |
| 133 | Dismantling & Fabrication & Erection of Shell of Melter |
| 134 | Dismantling & Fabrication & Erection of Fibrizer Casing |
| 135 | Dismantling & Fabrication & Erection of Pusher Casing |
| 136 | Fabrication of MS Cover for under feed Roller |
| 137 | Cane stopper flap of cane leveler & chopper |
| 138 | Dismantling & Commissioning of I D FanDia 2100 mm |
| 139 | Dismantling & Commissioning of I D FanDia 1700 mm |