Name of Work:-Replacement of existing Bailey Bridge by RCC over Ballini Nallah near Kore Jagir Nagrtoa. (Under CAPEX)
Sl. No.
Item Description
1
Construction of 28mtr Span (C/C of bearings) Double Lane (PRE - STRESSED) RCC Bridge incl. construction of5.00mtr long approaches on both sides of bridge with Designing / Commissioning, construction of foundation, RCC sub - structure and pre-stressed super-structure, slab, dirt wall, return wallon Turn Key Basisincluding Soil Investigation and Vetting of Designs from Design Directorate / GCET or any IIT, with necessary protection works, walling, footpath, RCC Crash Barriers ec. on both sides as per IRC 70 loading specifications incl. painting, supplying / fixing of bearings, suitable expansion joints and laying of 40mm bituminous concreteearing coat all inclusive; including all leads, lifts and carriage (complete job) and as per directions of Engineer - in -charge.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.