Preparation Of Preliminary Feasibility Report Covering All The Aspects As Per 2017 Guidelines For Per Issued By Cwc, Guidelines For Submission, Appraisal And Acceptance Of Irrigation And Multipurpose Projects For Construction Of Kalasa, Haltara And Bhandura Diversion Scheme Across The Kalasa, Halthara & Bhandura Nala Complete And As Directed By Engineer- In-Charge, Preparation Of Detailed Report On Hydrology For Avalilability Of Water Preparation Of Working Tables, Fixing Intake Levels Based On Reservoir Levels Etc., Complete As Directed By Engineer-In-Charge, Detailed Compendium Planning Of Lift Scheme Comprising Study Of Minimum 3 Alternatives For Lifting Point, Rising Main, Suggesting Techno- Economic Alignment, Detailed Planning Of Lift Scheme, Comprising Intake Channel, Location Of Jack Well Cum Pump House, Alignment Of Rising Main And Location Of Delivery Chamber Complete As Directed By Engineer-In- Charge, Preparation Of Detailed Comparative Analysis For All The Alternates Worked Out For Various Discharges, Velocity Considerations, Selection Of Grade Of Steel, Designs For Various Alternatives, Finalisation Of Techno-Economic Proposal And Alignment For Lift Scheme For Providing Irrigation Facility Complete As Directed By Engineer-In-Charge., Preparation Of Detailed Project Report Covering All The Aspects As Per Guidelines Of Central Water Commission For River Valley Projects 2010 For Construction Of Kalasa And Bhandura Nala Diversion Schemes (Lift Scheme) As Per The Requirement And Guidelines Of The Concerned Statutory Bodies And Directed By Cwc, Complete And As Directed By Engineer-In- Charge, Detailed Hydrological Study Of The Weir Location, Arriving At The Pmf, Design Flood, Capacity Curves, Fixing Principal Levels Of The Weir Such As Mddl, Frl, Mwl Etc, Flood Routing As Per Cwc I Wrdo Guidelines, Is Codes And As Directed By Engineer-In-Charge., Preparation Of Designs, Estimates And Drawings For Pumping Machinery, Pump House Electrical Works Comprising Selection Of Suitable Type Of Pumps, Motors, Arriving Capacityof Pumps Based On Pump Head And Discharge, Starters, H T Panels Etc.Complete As Directed By Engineer-In- Charge, Preparation Of Designs, Estimates And Drawings For Electrical Substation, Terminal Bay And Other Electrical Substation Works Including Civil Works Etc. Complete As Directed By Engineer-In-Charge, Preparation Of Alignment Of Power Transmission Line Duly By Conducting Detailed Check Survey, Preparation Of Designs, Estimates And Drawings Etc. Complete As Directed By Engineer-In-Charge. ,Preparation Of Design, Drawings And Estimate For Intake Canal, Fore Bay And .Its Appurtenant Works Etc., Complete As Directed By Engineer-In-Charge, Preparation Of Designs, Drawings And Estimate For Jack Well Cum Pumphouse And Its Appurtenant Works, Delivery Pipe System, Manifold System Etc., Complete As Directed By Engineer-In-Charge, Preparation Of Design, Estimate Anddrawings For Pump House Auxiliary Works Such As Operator/ Watchman Quarters, Approach Road Etc.,Complete As Directed By Engineer-In-Charge, Preparation Of Design, Estimate And Drawings For Rising Main, Comprising Excavation Of Trench, Supply, Jointing, Laying And Testing Of Rising Main Pipe, Surge Protection Works, Necessary Air Valves, Sluice Valves, Construction Of Structures, Thrust/Anchor Blocks, Chambers For Valves, Service Road Etc., Complete As Directed By Engineer-In-Charge, Preparation Of Designs, Drawings And Estimate For Delivery Chambers Etc., Complete As Directed By Engineer-In-Charge, Preparation Of Preliminary Surge Analysis And Preparation Of Estimates For Surge Protection System For The Scheme Etc., Complete As Directed By Engineer-In-Charge, Preparation Of Package Estimate For Implementation Of The Scheme Comprising, Lift Head Works, Rising Main, Jack Well Cum Pump House, Electro Mechanical Works, Delivery Chamber And Other Appurtenant Works Foron Lump Sum Turn-Key Basis Including 0 & M Of The Scheme For 5 Years From The Date Of Commissioning And Getting Clearance From Tsc And Erc Successfully Etc., Complete As Directed By Engineer-In-Charge, Preparation Of Bid Document For Implementation Of The Scheme Comprising, Lift Head Works, Rising Main, Jack Well Cum Pump House, Electro Mechanical Works, Delivery Chamber And Other Appurtenant Works On Lump Sum Turn-Key Basis Including 0 & M Of The Scheme For S Years From The Date Of Commissioning Including Getting Clearance From Tsc And Erc Successfully Etc., Complete As Directed By Engineer-In-Charge.