}

E-Tender For Empanelment Of Ship Repair Workshops And Fixation Of Repair Tariff Rates For Servicing Of Fire Fighting Equipment And Allied Items At Mumbai-1 Co2 Cylinder Weighment : A ) Disconnecting Cylinders From The Rack, Removing Cylinders One By On, mumbai-Maharashtra

Shipping Corporation Of India Limited has published E-Tender For Empanelment Of Ship Repair Workshops And Fixation Of Repair Tariff Rates For Servicing Of Fire Fighting Equipment And Allied Items At Mumbai-1 Co2 Cylinder Weighment : A ) Disconnecting Cylinders From The Rack, Removing Cylinders One By On. Submission Date for this Tender is 22-07-2022. Ship repair and Maintenance Tenders in mumbai Maharashtra. Bidders can get complete Tender details and download the document.




Tender Notice

32906520
E-Tender For Empanelment Of Ship Repair Workshops And Fixation Of Repair Tariff Rates For Servicing Of Fire Fighting Equipment And Allied Items At Mumbai-1 Co2 Cylinder Weighment : A ) Disconnecting Cylinders From The Rack, Removing Cylinders One By On
Open Tender
NCB
Maharashtra
Mumbai
22-07-2022

Tender Details

E-Tender For Empanelment Of Ship Repair Workshops And Fixation Of Repair Tariff Rates For Servicing Of Fire Fighting Equipment And Allied Items At Mumbai-1 Co2 Cylinder Weighment : A ) Disconnecting Cylinders From The Rack, Removing Cylinders One By One, Weighing, Tabulating The Weights. Fitting Of Cylinders Back In Rack Connecting Loop Pipes With Manifold And Fitting Of Clamps. ( Renewal Of Parts Extra ) . B ) Weighment Of Co2 Cylinder Using Level Detector Method. C ) Co2 System On Ship – Having Less Than 40 Nos Co2 Cylinders : Minimum Charge For Weighment D ) Weighment Certification Issued With Dgs Approval – ( Mot-1 , Class ) Engineer In Attendance 2 Overhauling Of Non-Return Valves Dismantling Of Non-Return Valves From Main Manifold, Servicing / Overhauling And Fitting Back In Place With Taflon Thread Seal. ( Any Renewal Of Parts Will Be Charged Extra ) . 2 ( A ) To Quote If Heated For Removal Of Above N / R V / Vs 3 Renewal Of Gaskets Co2 Cylinder Loop Pipe Connector Gaskets Renewal With New Gaskets. 4 Refilling Of Co2 Cylinder ( Non Portable Type ) A Empting And Internal Inspection Of Cylinders B Refilling Of Co2 Cylinder C Testing Hydraulically Each Cylinder D Overhauling Of Each Head Fitting E Repair / Renewal Of Parts Of Above Head Fitting 5 Handling Cylinders During Refilling A Handling Co2 Cylinders From Co2 Room To Deck And Loading To Transport, Unloading At Filling Station. Handling Co2 Cylinders From Filling Station To Deck And To Co2 Room. B Handling Co2 Cylinders Within Co2 Room And Fit Back. 6 Weighment Of Co2 Cartridges I Portable Fire Extinguisher Co2 Cartridge Weighment. Ii Refilling Of Co2 Cartridges 7 Overhauling Of Relief Valves. Disconnecting The Relief Valve And Taking Adrift. Dismantling Of The Valve And Cleaning Of All Parts. Assembly Of The Valve And Setting Of Release Pressure In Presence Of Surveyor ( Irs / Mmd ) . ( Cost Of Renewals Extra ) . 8 Blowing Through And Smoke Test I Blowing Through Co2 System Of Engine Room / Pump Room Co2 Spreaders / Points With Compressed Air.Ii Blowing Through Co2 System Of Cargo Hold Co2 Spreaders / Points With Compressed Air. If Spreaders Are Above 04 Meters , Staging Cost Extra Iii Smoke Test ( Nowadays Electronic Gadget In Bridge Or Co2 Room ) . Test Sensitivity . Any Repairs / Renewals : Cost Extra 9 Refilling Of Compressed Air Cylinder ( Scba / Eebd ) A Refilling Cost Of Compressed Air Cylinder For S.C.B.A. Set With Upto 10 Litres Capacity Of Pure Compressed Air B Overhauling Of Each Head Fitting C Repair / Renewal Of Parts Of Above Head Fitting 10 ( A ) Refilling Cost Of Compressed Air Cylinder For S.C.B.A. / Eebd Set With Upto For Life Boat B Overhauling Of Each Head Fitting C Repair / Renewal Of Parts Of Above Head Fitting 11 Servicing , Pressure Testing , Refilling Of Fire Extinguishers Servicing Including Head Assembly 12.1 Foam A ) 9 Litres ( Servicing ) 9 Litres ( Press.Test ) 9 Litres ( Refilling ) B ) 45 Liters ( Servicing ) 45 Liters ( Press.Test. ) 45 Liters ( Refilling ) C ) 50 Liters ( Servicing ) 50 Liters ( Press.Test. ) 50 Liters ( Servicing ) D ) 135 Liters ( Servicing ) 135 Liters ( Press.Test. ) 135 Liters ( Refilling ) E ) 150 Liters ( Servicing ) 150 Liters ( Press.Test. ) 150 Liters ( Refilling ) 12.2 Water Gas A ) 9 Liters Water Gas ( Servicing ) 9 Liters Water Gas ( Press.Test. ) 9 Liters Water Gas ( Refilling ) 12.3 D.C.P. A ) 4.5 Kg. Dcp- ( Servicing ) 4.5 Kg. Dcp- ( Press. Test ) 4.5 Kg. Dcp- ( Refilling ) B ) 9 Kg Dcp ( Servicing ) 9 Kg Dcp ( Press Test ) 9 Kg Dcp ( Refilling ) C ) 25 Kg Dcp ( Servicing ) 25 Kg Dcp ( Press Test ) 25 Kg Dcp ( Refilling ) D ) 50 Kg Dcp ( Servicing ) 50 Kg Dcp ( Press Test ) 50 Kg Dcp ( Refilling ) ( Refills To Be Supplied By Ship. Cost Of Renewals Extra ) .13 ( I ) Hydro Stretch Test Of S.C.B.A. / Eebd Cylinders Of Capacity Upto Maximum Of 10 Ltrs. - Irs Survey Extra Ii ) Hydro Stretch Test Of S.C.B.A. / Eebd Cylinders Of Capacity Upto Maximum Of 60 Ltrs.- Irs Survey Extra 14 Quality Analysis Of Breathing Air Consists Of -Analysis Of Breathing Air For Ppm Of Co, Co2, Water And Oil Content As Per International Standard. To Quote For Full Analysis As Described 15 ( I ) Testing Of Co2 Pipe Line For High Pressure ( Above 80 Kg / Cm2 ) Ii ) Testing Of Co2 Pipe Line For Medium Pressure ( Upto 80 Kg / Cm2 ) Iii ) Testing Of Co2 Pipe Line For Low Pressure 16 Making Of Stages A ) Suspended Staging Rope / Steel / Bamboo Staging Suspended From Top. B ) Built Up Staging I. Upto 3 Meters From Bottom Ii Upto 7 Meters From Bottom Iii. Upto 10 Meters From Bottom Iv. Upto 15 Meters From Bottom B Quote For Osv Ships 17 ( I ) For Weighment Of Halon Cylinders , Pilot Cylinders , Check All Lines Are Clear By Blowing Through With Air , Alarm Check For Certification , For Irs Survey Ii Halon Cylinders And Pilot Cylinders To Weigh And Check Gas Weight Before Commencement Of Work With Mmd Certificate Iii ( A ) Dismantle Halon Cylinders And Bring It To Deck And Loading To Transport, If Required For Taking It To Workshop And Transport Back To Ship And Fit Back In Engine Room. ( Each Halon Cylinder Approx 180 Kg Wt ) With Care To Avoid Damage To Cylinder Head Pressure Gauge & Pressure Switch. [ Transport : Actuals + 10% ] Iii ( B ) Handling Halon Cylinders Within Halon Room And Fit Back. Iv Halon Cylinders To Be Connected To Recovery Plant + Hydro Test + Filling Back Halon Gas. V Minimum Vapour Losses Will Be 25% Of Cylinder Volume Vi Recovery Cost Per Cylinder Vii Hydro Test Of Cylinder Per Unit Viii Valve Overhaul Per Unit Ix Repair / Renewal Of Parts Of Above Unit 17.1 Following Extra If Required I Renewal Of Low Pressure Switch On Valve Ii Renewal Of Pressure Gauge On Valve Iii Renewal Of Seals & Piston Valve With Nylon Molded Seating. Iv Damaged Items Must Be Returned To Vessel 18 Fit Back Valve, Pressurize Cylinder With N2 1.5 Times Working Pressure Check Valve Seat & Function Of Operating & Release N2 ( Per Cylinder ) 19 Cost Of Halon 1301 Replenished -Proof / Cash Memo To Be Attached 20 Pilot Cylinder Valve Fit Back, Test & Fill With Co2 ( Upto 3 Kg Capacity ) 21 If Halon 1301 Pilot Cylinder Per Kg. 22 Pilot Cylinder To Halon Cylinder Activating Device Pipe Line Pr. Test To 80 Kg / Cm2 With Mmd Certificate Which Includes23 Remove Non-Return Valves Sets From Each Cylinder Connection, Put Blanks As Required. Hydraulic Pr. Test, Initially& In-Between As Required And Final Test In Presence Of Irs Surveyor. 24 Renewal Of Sch-80 Galvanized Pipe, / Equivalent Cu-Pipe Clamping Etc With Ermeto Connections On Either Side Of Pipe Length Per Meter 25 ( I ) Engineer Fee For Survey Work Maximum 2 Days Ii ) Technician For Survey Work On Per Day Basis 26 Any Other Work If Carried Out Or Material Used Will Be Charged Extra. 28 Allowance For Working On O.T. ( To Be Certified By Ships Officer ) Week Days Upto 2000 Hours Through Out Night / On Holiday 29 Irs / Mmd Charges To Witness Cylinder Survey & Endorse And Surveys Transport. 30 Outstation Charges For Service Engineers Travel Charges ( Air / Train / Bus ) Ii. Lodging & Boarding - All Ports Except Kolkata, Chennai & Kochi Iii Lodging & Boarding - For Ports Of Kolkata, Chennai & Kochi Iv Travel Time Charges- Victualling, Boarding Only 31 Labour Charges ( For Special Work Not Included In Items Above. ) Engineer Charges . Technician Iii Skilled Labour 32 Annual Inspection Of Fixed Fire Fighting System For Deep Fat Frier 33 Overhauling Of Servo Piston Removal Of Wire Connection, Inlet And Outlet Pipe Connection And Taking The Servo Piston Adrift Opening Out And Dismantling Of Servo Piston, Cleaning All Parts And Assembly With Light Grease, Trying Out Servo Piston In Presence Of Surveyor And Fitting The Same In Place. Connecting The Pipes With Taflon Thread Seal. ( Cost Of Renewal Of Parts Extra ) . 34 Renewal Of Leather Bucket Of Servo Piston. 35 Inspection & Pressure Testing Of Immersion Suit A. Adult B. Child C. Infant 36 Eebd A. Annual Inspection B. Pressure Testing C. Refilling 37 Foam Sample Analysis ( Afff3% / Alcohol Based / Protein Based / Afff6% ) 38 High Pressure Testing, Refilling Of Medical Oxygen Cylinder A. 10 Litres B. 40 Litres39 S.C.B.A Mask Test -Scba / Eebd / Cylinder Head Valve Assembly - Making And Supply Of Spl Gun Metal Adaptors For Charging Of Scba / Eebd Cylinders - Making & Supply Of New Operating Control Knob Of Scba / Eebd 40 Weighment Of Pilot Cylinders 41 Portable Co2 Cylinder 2 Kg 5 Kg 6.5 Kg 22.5 Kg Pressure Testing Refilling 42 Main Valve Renewal Servicing 43 Pressure Gauge Renewal

Key Value

Document Fees
INR 2950 /-
EMD
INR 48000.0 /-
Tender Value
INR 96.03 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail