Survey, Design, Supply, Transportation, Carriage, Erection, Testing And Commissioning For Creation Of 250Kva Substation At Sail Sallan ( Ips-2 ) Under Nrcp ( Goi ) In District Udhampur On Turnkey Basis.- 1 Survey, Design, Supply, Transportation, Carriage, Erection, Testing And Commissioning For Erection Of 11 Kv Line With 50Mm² Rabbit Conductor On 9 Mtr St Poles For Creation / Installation Of 250 Kva Sub Sail Sallan ( Ips-2 ) Under Nrcp ( Goi ) . 2 9 Mtr. Long St Pole ( St-410 Sp-33 ) 3 11 Mtr. Long St Pole ( St-410 Sp-56 ) 4 50 Mm² Acsr Rabbit Conductor 5 Gi V Cross -Arm With Top Bracket Including Clamps 6 Gi Channel X-Arm Including Clamps And Braces 7 Pg Clamps For 50Mm²acsr Conductor 8 Galvinized Nuts And Bolts. 9 11Kv Disc Insulators ( Polymeric 45Kn ) Creepage Distance 320 Mm With Tension Fittings 10 11Kv Pin Insulator ( Polymeric ) With Pins ( 12Kv, 5Kn ) Creepage Distance 320Mm 11 Danger Plates With Clamps 12 Anti-Climbing Device With Clamps 13 Earthing Complete By Gi Rod 20Mm 2.5 Mtr Long Through Gi Strip 25X3mm 14 Painting Of 9 Mtr & 11 Mtr St Poleswith One Coat Of Red Oxide Paint. 15 Painting Of 9 Mtr & 11 Mtr St Poles With Two Coat Of Aluminium Paint. 16 Cement Bottoming 1:2:4 Mix As Per Rec Standards, 0.5 Cum / Pole 17 Aluminium Jointing Sleeves 18 Galvanised Stay Set With 50X8mm Stay Clamp, Guy Insulator ( 2Nos ) , Anchor Plate ( 200X 200 X 6 Mm ) , Nut-Bolts, 2 Nos Turn-Buckles, 1.8M Long, 16 Mm Diameter Solid Gs Stay Rod & 7 / 3.15 Mm Dia Gi Stranded Wire Complete 19 Survey, Design, Supply, Transportation, Carriage, Erection, Testing And Commissioning For Erection Of 11 Kv Line With 120Mm² 11 Kb Abc On 9 Mtr St Poles For Creation / Installation Of 250 Kva Sub Sail Sallan ( Ips-2 ) Under Nrcp ( Goi ) . 20 9 Mtr. Long St Pole ( St-410 Sp-33 ) 21 120 Mm² Ab ( Ht ) Cable ( 3X120 + 1X95mm² ) ( With Earthing ) 22 Heat Shrinkable Outdoor Cable Termination Kit 23 Suspension / Tension Clamp With Eye Hook 24 Galvinized Nuts And Bolts. 25 Danger Plates With Clamps 26 Anti-Climbing Device With Clamps 27 Earthing Complete By Gi Rod 20Mm 2.5 Mtr Long Through Gi Strip. 28 Painting Of 9 Mtr St Poles With One Coat Of Red Oxide Paint. 29 Painting Of 9 Mtr St Poles With Two Coat Of Aluminium Paint. 30 Cement Bottoming 1:2:4 Mix As Per Rec Standards, 0.5 Cum / Pole 31 Mid Span Straight Through Jointing Kit For 11 Kv Abc 32 Galvanised Stay Set With 50X8mm Stay Clamp, Guy Insulator ( 2Nos ) , Anchor Plate ( 200X 200 X 6 Mm ) , Nut-Bolts, 2 Nos Turn-Buckles, 1.8M Long, 16 Mm Diameter Solid Gs Stay Rod & 7 / 3.15 Mm Dia Gi Stranded Wire Complete 33 Survey, Design, Supply, Transportation, Carriage, Erection, Testing And Commissioning For Creation Of 250 Kva Sub Station Atsail Sallan ( Ips-2 ) Under Nrcp ( Goi ) . 34 11 / 0.433Kv, 3-Phase 250 Kva Distribution Transformer With Bimetallic Terminal Connectors Energy Level-2, Copper Wound, And With Lv Cable Box Havingdetachable Aluminium Gland Plate 35 Gapless Surge Arrestor 9Kv, 10Ka, La With Polymer Housing Station Type 36 11Kv Go, Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type 37 11 Kv Horn Gapfuse Set 3-Phase 200A 38 400 Mm² Single Core Cable, 1.1Kv Grade, Pvc Insulated Alumnium Stranded Conductor Frls Type 39 9 Mtr. Long St Pole ( St-410 Sp33 ) 40 11Kv Disc Insulators ( Polymeric 45Kn ) Creepage Distance 320 Mm With Tension Fittings 41 11Kv Pin Insulator ( Polymeric ) With Pins ( 12Kv, 5Kn ) Creepage Distance 320Mm 42 Gi Channel / Angle / Flat Of Sizes Including Clamps 43 Galvinized Nuts And Bolts. 44 Lt Distribution Box For 250 Kva Dtr With Mccb For Incomer And SfuS For Outgoing Circuits. 45 Cement Bottoming Of St Poles In 1:2:4 Mix As Per Rec Standards, 0.5 Cum Per Pole 46 Earthing Of Substation --Excavation Of Earth Pit Of Dia 650 Mm & Depth 3000 Mm, Installation Of Earthing Pipe Of 40 Mm Nominal Bore & 4Mm Wall Thickness & Length 2.5 Mtr Long As Per Is 1239. Gi Strip For Neutral Earthing Of Size 50 Mm X 6 Mm & 32Mm X 3Mm For Connection Of Transformer Body, G.O Set & Lightening Arrestor As Per Is 2629 / 85, Gi Nuts & Bolts, Refilled With Earth Enhancement Materials And Earth Chamber With Rcc Slab Cover. 47 Painting Of Sub Station With One Coat Of Red Oxide And Two Coats Of Aluminium Paint 48 Wedge Connector / Pg Clamps 49 Danger Plates With Clamps 50 Gi Barbed Wire For Anti Climbing 51 3 Phase, 4-Wire Trivector Meter With Ct Pt Unit 52 Galvanised Stay Set With 50X8mm Stay Clamp, Guy Insulator ( 2Nos ) , Anchor Plate ( 200X 200 X 6 Mm ) , Nut-Bolts, 2 Nos Turn-Buckles, 1.8M Long, 16 Mm Diameter Solid Gs Stay Rod & 7 / 3.15 Mm Dia Gi Stranded Wire Complete