| 1 | Dismantling Concrete in Roof slab,beam and similar work provided for cement concrete is reinforced (reinforcement cut as required to facilitate demolition)all as specified and directed by Engr in charge. |
| 2 | Demolition of Brick work or stone/boulder masonry, built in Cementmortar including all quoins, arches, pillars, etc, but excluding ashlarfacings, dressed stonework and precast concrete articlesall as specified and directed by Engr in charge. |
| 3 | Removing building material/debris 100m or under, beyond the lead included in the rates, including loading, unloading and stacking at the destination all as directed by Engr in charge.Note : 0.62Cum may be consider as one load all as specified and directed by Engr-in-Charge. |
| 4 | M&L for TMT bars 10mm dia & over cut to length bent to shape required including cranking bending spirally for hooping for columns, hooking ends and binding with and including MS wire (annealed) not less than 0.9 mm dia or securing with clips complete all as specified and directed |
| 5 | Ditto, but 5mm dia and over upto and including 10mm dia in stirrups, spacers and binders complete all as specified and directed |
| 6 | Formwork to sides of pilars,posts, struts, piers, columns and stanchions, rough finished surfacdes of concrete all as specified |
| 7 | Formwork to sides and soffits ofroof beams, beam haunchings, girders, bressummers, including supports, overhangs, etc. also splays between floors and beams, etc.complete all as specified and directed |
| 8 | Formwork to soffits of suspended slabs such as roof slabs, floor slabs, landings and similar work; not exceeding 200mm thick (Horizontal or sloping) all as specified and directed |
| 9 | M&L for RCC(1:1½:3) nominal mix nominal mix using (20mm graded stone aggregate) as in columns, pillars, posts & struts complete all as specified. |
| 10 | M&L for RCC (1:1½:3)nominal mixusing (20mm graded stone aggregate) as in beams, cantilevers, bressummers, lintels over 1.5m span complete all as specified. |
| 11 | M&L for RCC (1:1½:3) nominal mix using (20mm graded stone aggregate) as in roof slab supported on walls, beams and columns (Horizontal or sloping) complete all as specified. |
| 12 | Taking down cement plaster on brick work or stone walls including racking out joints ,hacking for key,scrubing down with water etc |
| 13 | M&L for Pre-cast cement concretetype C1 (1:3;6) block masonry with solid blocks, exc. 10 cm in width and setting in mortar (1:4) complete all as specified and as directed. |
| 14 | M & L 15 mm thick rendering on fair faces of concrete in CM 1:6 finish the surfaceeven & smooth without using extra cement complete all as specified and directed |
| 15 | M & L 15 ( 10+5) mm thick rendering in two layer on fair faces of concrete in CM 1:4finish the surfaceeven & smooth without using extra cement complete all as specified and directed ( NOTE : II nd coat 5mm thickwith WPC ) |
| 16 | M & L 5 mm thick rendering on on soffit of slab,ceilings in CM 1:3 finish the surfaceeven & smooth without using extra cement complete all as specified and directed |
| 17 | M & L for rendering in CM 1:3, 10 mm thickness onroof slabfinishing the surface even and fair with out using extra cement complete all as specified and directed. |
| 18 | M&L for laying water proofing treatment using 4mm thick APP modified membrane consisting five layer membrane with features as spd,weighing not less than 4Kg/Sqm laid over a coat of cold applied bituminous [email protected]/Sqm by torching the membrane and sealing the overlap by 100mm length side and 15mm width side all as per manufactures instructions including joints and changes in direction be curved with cement mortar1:3 mixed with SBR latex@200ml/bag of cement cured well before laying of membrane,including applying two coat of solar reflective bituminous aluminium [email protected]/Sqm all as per manufactures instructions and to the satisfaction of Engr-in-charge.Note:(i) Irrespective of lap the net covered area willonly be measured for payment.(ii) The quoted rate is deemed to be inclusive of bituminous primer,APP membrane,solar reflective bituminous aluminiumpaint& SBR latex |
| 19 | M & L for three coats of white washon newly plastered celingsurfacesall as specified and as directed. |
| 20 | M&L for preparation of new plastered surface & applyingtwo coats of oil bound distemper (OBD) over a coat of white chalktening on wallcomplete all as specified and directed by Engineer-in-charge. |
| 21 | Supply only Liquid water proofing compound (Dr Fixit IW+ or equivalent, 200ml per bag of cement). |
| 22 | Material & Labour two coats of acrylic emulsion extenior paint (anti fungal painting-APEX or Equivalent) over a coat of acrylic amulsion primer on new surface including preparation ofsurface of any description all as specified and directed by Engr-in-Charge. |
| 23 | Material & Labour for complete removal of exiting treatment and prepration of surface and applyingtwo coats of acrylic emulsion extenior paint (anti fungal painting-APEX or Equivalent) over a coat of acrylic emulsion primer of any description all as specified and directed by Engr-in-Charge. |
| 24 | M&L for preparation of old painted steel surfaces over 10 cm width/girth and applying one coat of synthetic enamel paint all as specified and directed. |