|
| 1 | Fixing of Rate Contract for handling and fabrication of various material in Divisional stores at Narwal Under the jurisdiction of JPDCL Electric Division-I, Parade, Jammu. For the finical year 2022-23. |
| 2 | Unloading of PCC 8 Mtr Pole |
| 3 | Unloading of PCC 9 Mtr Pole |
| 4 | Unloading of PCC 11 Mtr Pole |
| 5 | Unloading of ST 8 Mtr Pole |
| 6 | Unloading of ST 9 Mtr Pole |
| 7 | Unloading of ST 11 Mtr Pole |
| 8 | Unloading of ST 13 Mtr Pole |
| 9 | loading of PCC 8 Mtr Pole |
| 10 | loading of PCC 9 Mtr Pole |
| 11 | loading of PCC 11 Mtr Pole |
| 12 | loading of ST 8 Mtr Pole |
| 13 | loading of ST 9 Mtr Pole |
| 14 | loading of ST 11 Mtr Pole |
| 15 | loading of ST 13 Mtr Pole |
| 16 | Dragging of PCC 8 Mtr. Poles at an average distance upto 100 Mtr for stacking toaccesibleplace for loading/Unoading Purpose and its stacking |
| 17 | Dragging of PCC 9 Mtr. Poles at an average distance upto 100 Mtr for stacking toaccesibleplace for loading/Unoading Purpose and its stacking |
| 18 | Dragging of PCC 11 Mtr. Poles at an average distance upto 100 Mtr for stacking toaccesibleplace for loading/Unoading Purpose and its stacking |
| 19 | Dragging of ST 8 Mtr. Poles at an average distance upto 100 Mtr for stacking toaccesibleplace for loading/Unoading Purpose and its stacking |
| 20 | Dragging of ST 9 Mtr. Poles at an average distance upto 100 Mtr for stacking toaccesibleplace for loading/Unoading Purpose and its stacking |
| 21 | Dragging of ST 11 Mtr. Poles at an average distance upto 100 Mtr for stacking toaccesibleplace for loading/Unoading Purpose and its stacking |
| 22 | Dragging of ST 13 Mtr. Poles at an average distance upto 100 Mtr for stacking toaccesibleplace for loading/Unoading Purpose and its stacking |
| 23 | loading of 25 KVA Transformer |
| 24 | loading of 63 KVA Transformer |
| 25 | loading of 100 KVA Transformer |
| 26 | loading of 250 KVA Transformer |
| 27 | loading of 300 KVA Transformer |
| 28 | loading of 400 KVA Transformer |
| 29 | loading of 500 KVA Transformer |
| 30 | loading of 630 KVA Transformer |
| 31 | Unloading of 25 KVA Transformer(New/Write BackTransformer) |
| 32 | Unloading of 63 KVA Transformer(New/Write BackTransformer) |
| 33 | Unloading of 100 KVA Transformer(New/Write BackTransformer) |
| 34 | Unloading of 250 KVA Transformer(New/Write BackTransformer) |
| 35 | Unloading of 300 KVA Transformer(New/Write BackTransformer) |
| 36 | Unloading of 400 KVA Transformer(New/Write BackTransformer) |
| 37 | Unloading of 500 KVA Transformer(New/Write BackTransformer) |
| 38 | Unloading of 630 KVA Transformer(New/Write BackTransformer) |
| 39 | Dragging of existing /New /Damaged 25 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly |
| 40 | Dragging of existing /New63 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly |
| 41 | Dragging of existing /New /Damaged 100 KVA Tranformer at an average distance upto 50 Mtrfrom unloading site to stacking site and its stacking properly |
| 42 | Dragging of existing /New /Damaged 250 KVA Tranformer at an average distance upto 50 Mtrfrom unloading site to stacking site and its stacking properly |
| 43 | Dragging of existing /New /Damaged 300 KVA Tranformer at an average distance upto 50 Mtrfrom unloading site to stacking site and its stacking properly |
| 44 | Dragging of existing /New/Damaged400KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly |
| 45 | Dragging of existing /New/Damaged630KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly |
| 46 | Dragging of existing /New /Damaged 25 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking |
| 47 | Dragging of existing /New63 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking |
| 48 | Dragging of existing /New /Damaged 100 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking |
| 49 | Dragging of existing /New /Damaged 250 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking |
| 50 | Dragging of existing /New/Damaged400KVA Tranformer at an average distance upto 50 Mtrfor making space for other store material and its stacking |
| 51 | Dragging of existing /New/Damaged630KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking |
| 52 | Unloading of Old /New ACSR Squirel Conductor |
| 53 | Unloading of Old /New ACSR Weasel Conductor |
| 54 | Unloading of Old /New ACSR Rabbit Conductor |
| 55 | Unloading of Old /New ACSR Dog Conductor |
| 56 | Loading of Old/New ACSR SquirelConductor |
| 57 | Loading of Old/New ACSR WeaselConductor |
| 58 | Loading of Old/New ACSR RabbitConductor |
| 59 | Loading of Old /New ACSR Dog Conductor |
| 60 | Shifting of Old/New ACSR Squirel Conductor from unloading site to stacking siteat an average distance upto 100 Mtr and its stacking |
| 61 | Shifting of Old/New ACSR WeaselConductor from unloading site to stacking siteat an average distance upto 100 Mtr and its stacking |
| 62 | Shifting of Old/New ACSR Rabbit Conductor from unloading site to stacking siteat an average distance upto 100 Mtr and its stacking |
| 63 | Shifting of Old/New ACSR Squirel Conductor to other place for making space for other store material at an average distance upto 100 Mtr and its stacking |
| 64 | Shifting of Old/New ACSR Weasel Conductor to other place for making space for other store material at an average distance upto 100 Mtr and its stacking |
| 65 | Shifting of Old/New ACSR Rabit Conductor to other place for making space for other store material at an average distance upto 100 Mtr and its stacking |
| 66 | Unloading of Channel/Angle/Flat Iron |
| 67 | Loading of Channel/Angle/Flat Iron |
| 68 | Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly |
| 69 | Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr for making space for other store material and its stacking |
| 70 | Unloading of Link Set |
| 71 | Unloading of HG Set |
| 72 | Unloading of GO Set |
| 73 | Unloading of DO Set |
| 74 | Unloading of LA Set |
| 75 | Loading of Link Set |
| 76 | Loading of HG Set |
| 77 | Loading of GO Set |
| 78 | Loading of DO Set |
| 79 | Loading of LA Set |
| 80 | Unloading of CT/PT Unit |
| 81 | Loading of CT/PT Unit |
| 82 | Unloading or Loading of SE AL Wire of all sizes |
| 83 | Unloading or Loading of SE Cu Wire of all sizes |
| 84 | Unloading or Loading of LV Bush Rod M-12 |
| 85 | Unloading or Loading of LV Bush Rod M-20 |
| 86 | Unloading or Loading of LV Bush Rod M-30 |
| 87 | Unloading or Loading of HV Bush 11KV |
| 88 | Unloading or Loading of HV Bush Rod |
| 89 | Unloading or Loading of LV Bush M-12 |
| 90 | Unloading or Loading of LV Bush M-20 |
| 91 | Unloading or Loading of LV Bush M-25/30 |
| 92 | Unloading or Loading of Lethoride Paper |
| 93 | Unloading or Loading of Khakhi Paper |
| 94 | Unloading or Loading of Gutties |
| 95 | Unloading or Loading of Washers of sizes |
| 96 | Unloading or Loading of cork sheetof sizes |
| 97 | Unloading or Loading of cork stripof sizes |
| 98 | Unloading or Loading of cotton tape/bovin tapeof sizes |
| 99 | Unloading or Loading of craft paper |
| 100 | Unloading or Loading of packing sheet/pressboard |
| 101 | Unloading or Loading of Nuts and bolts of sizes |
| 102 | Unloading or Loading of wooden wedges |
| 103 | Unloading or Loading of Bakelite tubes 1 mtr |
| 104 | Unloading or Loading of Transformer oil |
| 105 | Unloading or Loading of Breather |
| 106 | Unloading or Loading of Welding Rods |
| 107 | Unloading or Loading of allied material for HT/LT Line/Substations material(i.e. Disc/Pin/Shackle/Busbar Insulators etc) |
| 108 | Unloading or Loading of allied material for HT/LT Line/Substations material like Guy wire/G.I Wire |
| 109 | Unloading or Loading of Staysets/Guy |
| 110 | Unloading or Loading of Tension/Suspension fitting/eye bolt |
| 111 | Shifting of allied material for HT/LT Line/Substations(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods etc)from unloading site to stacking site and stacking properly |
| 112 | Shifting of allied material for HT/LT Line/Substations/workshop material(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods/Al/Cu wire/bush rodsetc) for making space for other store material |
| 113 | Unloading/Loading of BammbooLadder |
| 114 | Unloading/Loading of Single/Three Phase Meters |
| 115 | Unloading of PVC Cable single core 95 mmsq |
| 116 | Unloading of PVC Cable single core 120 mmsq |
| 117 | Unloading of PVC Cable single core 185 mmsq |
| 118 | Unloading of PVC Cable single core 300 mmsq |
| 119 | Unloading of PVC Cable single core 400 mmsq |
| 120 | Unloading of PVC Cable single core 630 mmsq |
| 121 | Loading of PVC Cable single core 95 mmsq |
| 122 | Loading of PVC Cable single core 120 mmsq |
| 123 | Loading of PVC Cable single core 185 mmsq |
| 124 | Loading of PVC Cable single core 300 mmsq |
| 125 | Loading of PVC Cable single core 400 mmsq |
| 126 | Loading of PVC Cable single core 630 mmsq |
| 127 | Unloadingof AB HT Cable 35 mmsq. |
| 128 | Unloading of AB HT Cable 50 mmsq. |
| 129 | Unloading of AB HT Cable 70 mmsq./95mmsq |
| 130 | Unloading of AB HT Cable 120 mmsq./185 mmsq |
| 131 | loading of AB HT Cable 35 mmsq. |
| 132 | loading of AB HT Cable 50 mmsq. |
| 133 | loading of AB HT Cable 70/95 mmsq. |
| 134 | loading of AB HT Cable 120 /185mmsq. |
| 135 | Unloading of AB LT Cable35/ 50 mmsq. |
| 136 | Unloading of AB LT Cable 70/95 mmsq./3.5 core LTcable |
| 137 | Unloading of AB LT Cable 120 /185 mmsq./3.5 core Ltcable |
| 138 | loading of AB LT Cable 35/50 mmsq. |
| 139 | loading of AB LT Cable 70/95 mmsq/.3.5 core Ltcable |
| 140 | loading of AB LT Cable 120/185 mmsq./3.5 core Ltcable |
| 141 | Unloading of HT XLPECable 35/50mmsq. |
| 142 | Unloading of HT XLPE Cable 95/120 mmsq. |
| 143 | Unloading of HT XLPE Cable 150 mmsq./ |
| 144 | Unloading of HT XLPE Cable 185 mmsq. |
| 145 | Unloading of HT XLPECable 300 mmsq. |
| 146 | loading of HT XLPECable 35/50mmsq. |
| 147 | loading of HT XLPE Cable 95/120 mmsq. |
| 148 | loading of HT XLPE Cable 150 mmsq. |
| 149 | loading of HT XLPE Cable 185 mmsq. |
| 150 | loading of HT XLPECable 300 mmsq. |
| 151 | Unloading of LT XLPE Cable 35/50 mmsq.single core |
| 152 | Unloading of LT XLPE Cable 70 mmsq.single core |
| 153 | Unloading ofLT XLPE Cable 95 mmsq.single core |
| 154 | Unloading of LT XLPE Cable 120 mmsq.single coree |
| 155 | Unloading of LT XLPE Cable 185 mmsq.single core |
| 156 | Unloading ofLT XLPE Cable 300 mmsq.siongle core |
| 157 | loading of LT XLPE Cable 35/50 mmsq.single core |
| 158 | loading of LT XLPE Cable 70 mmsq.single core |
| 159 | loading ofLT XLPE Cable 95 mmsq.single core |
| 160 | loading of LT XLPE Cable 120 mmsq.single coree |
| 161 | loading of LT XLPE Cable 185 mmsq.single core |
| 162 | loading ofLT XLPE Cable 300 mmsq.siongle core |
| 163 | Shifting of AB HT CABLE 35 mmsq from unloading site to stacking site and stacking properly |
| 164 | Shifting of AB HT CABLE 50 mmsq from unloading site to stacking site and stacking properly |
| 165 | Shifting of AB HT CABLE 70 /95 mmsq from unloading site to stacking site and stacking properly |
| 166 | Shifting of AB HT CABLE 120/185 mmsq from unloading site to stacking site and stacking properly |
| 167 | Shifting ofHT XLPE CABLE 35 mmsq from unloading site to stacking site and stacking properly |
| 168 | Shifting ofHT XLPE CABLE 50 mmsq from unloading site to stacking site and stacking properly |
| 169 | Shifting of HT XLPE CABLE 70/95 mmsq from unloading site to stacking site and stacking properly |
| 170 | Shifting of HT XLPE CABLE 120/185 mmsq from unloading site to stacking site and stacking properly |
| 171 | Shifting of AB LT CABLE 35 /50 mmsq from unloading site to stacking site and stacking properly |
| 172 | Shifting of AB LT CABLE 70 /95 mmsq from unloading site to stacking site and stacking properly |
| 173 | Shifting of AB LT CABLE 120 /185 mmsq from unloading site to stacking site and stacking properly |
| 174 | Shifting ofLT XLPE CABLE 35 /50 mmsq from unloading site to stacking site and stacking properly |
| 175 | Shifting of LT XLPE CABLE 70 mmsq from unloading site to stacking site and stacking properly |
| 176 | Shifting of LT XLPE CABLE 95 mmsq from unloading site to stacking site and stacking properly |
| 177 | Shifting of LT XLPE CABLE 120 mmsq from unloading site to stacking site and stacking properly |
| 178 | Shifting of LT XLPE CABLE 185 mmsq from unloading site to stacking site and stacking properly |
| 179 | Shifting of LT XLPE CABLE 300 mmsq from unloading site to stacking site and stacking properly |
| 180 | Fabrication of Channel Cross Armsof sorts from MS Channel of sizes |
| 181 | Fabrication of Angle iron braces /Belts/Guard Netting angles ,fencing posts etc from angle iron of sizes |
| 182 | Fabrication of clamps of sizesfrom MS flat (suitable for 8 mtr 9mtr,11 mtr and 13 mtr poles) |
| 183 | Fabrication of Earthing Plates , Cable duct cover from MSplate as per REC Standards |
| 184 | Fabrication of earthing spikes from MStor steel of sorts as per REC Standards |
| 185 | Fabrication of ST polesby way of drilling of extra holes |
| 186 | Fabrication of foundation bolts from MStor steel including threading as per REC Standards |
| 187 | Fabrication of Earthing pipefrom GI pipe and welding of earthing plate as per REC Standards |
| 188 | Unloading/Loading of Straight jointer kit/Heat shrinkable Kit for AB/XLPE cables of HT/LT Lines |
| 189 | Unreeling and layingof the ACSR Dog/Rabbit, Weasel/Squirell Conductor from the drum |
| 190 | Unreeling and laying of theXLPE/PVC /Single core cables ofsizes from the drum |
| 191 | Measuring,Cutting of ACSR Dog/Weasel/Rabbit/Squirrel conductor of required lengths ,making rolls of conductor and binding. |
| 192 | Measuring,Cutting of XLPE/PVC Single core Cable of required lengths ,making rollsand binding. |
| 193 | Unreeling and laying of theXLPE/PVC /AB Three core /3.5 core cables ofsizes from the drum |
| 194 | Measuring,Cutting of XLPE/PVC /AB Three core/3.5 coreCable of required lengths ,making rollsand binding. |
| 195 | Carriage /Shifting of ACSR Rabbit/Weasel/Squirrel/Dog conductor from stacking site to loading site |
| 196 | Carriage /Shifting of ACSR Rabbit/Weasel/Squirrel/Dog conductor from unloading site to stacking site |
| 197 | Carriage /Shifting ofXLPE/PVC Single core Cable from unloading site to stacking site |
| 198 | Carriage /Shifting of XLPE/PVC Single core Cable from stacking site to loading site |
| 199 | Carriage/Shifting ofXLPE/PVC /AB Three core/3.5 coreCable from unloading site to stacking site |
| 200 | Carriage of XLPE/PVC /AB Three core/3.5 coreCable from unloading site to stacking site |
| 201 | Checking/Counting/Meggering of Line/Hardware Materials viz Disc insulators ,fittings, Pin insulators with pins etc |
| 202 | Checking/Measuring/ Weighing of Line/Workorkkshop Material viz Nuts and bolts, Guy wire, GI Wire, Al. Strips, DPC Cu/Al Wire, Khakhi Paper, Lethoride Paper, Fevicol etc.and stacking |
| 203 | Cutting of Vegetation, Bushes , Wild Grass, treesto avoid any mishappening of untoward incidents |
| 204 | Carriage of Green Vegetation Bushes , Wild Grass, trees after cutting and dumping away from store |
| 205 | Straightening of tilted fencing posts in the store premises for repair of fecning |
| 206 | Insertion of new fencing Posts in the store for repair of fencing |
| 207 | Dismantling of existing mesh fencing |
| 208 | Fixing of mesh Fencing |
| 209 | Fixiing of CGI Sheets |
| 210 | Dismantling of CGI sheets |
| 211 | Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspectionsof Transfomers 25/63/100 KVA |
| 212 | Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspectionsof Transfomers 250/400/630KVA |
| 213 | Lifting of Unserviceable items like, Damaged Transformers(Outer frame of DTs), Broken Insulators of sorts, ,Al/ Cu/ Scrap/ Bushrods of sorts, Empty barells, Broken CGI Sheerts, Iron scraps, damaged energy meters, CT/PTs sets from existing place to another suitable place and its stacking |
| 214 | Painting of Red oxide/Aluminium Paint) ofFabricated Material. |
| 215 | Unloading of old loose conductor and making bundles |
| 216 | Checking & maggeringof 11KV LA setHG set GO set CT/PT unit |
| 217 | Unloading of PVC Cable 16 mmsq. 2 core 1.1KV grade |
| 218 | loading of PVC Cable 16 mmsq. 2 core 1.1KV grade |
| 219 | Shfting/Carriage of 16 mmsq 2 core PVC Cable upto 100 mtr |
| 220 | Unloading of PVC Cable 10 mmsq. 2 core 1.1KV grade |
| 221 | loading of PVC Cable 16 mmsq. 2 core 1.1KV grade |
| 222 | Shfting/Carriage of 16 mmsq 2 core PVC Cable upto 100 mtr |
| 223 | Unloading OR Loading of PVC Cable single core 50 mmsq |
| 224 | Unloading orLoadingof PVC Cable single core 120 mmsq |
| 225 | Shfting/Carriage of 1 core PVC Cable50 mm upto 100 mtr |
| 226 | Shfting/Carriage of 1 core PVC Cable120 mm upto 100 mtr |
| 227 | Unloading/Loading of Paint |
| 228 | Unloading/Loading of IPC |
| 229 | Unloading/Loading of Mid span straight through jointing kit |
| 230 | Unloading/Loading of LT 3.5 Core jointing kit |
| 231 | Unloading/Loading of 11kv 3 core straight through jointing kit |
| 232 | Unloading/Loading of 11kv 1 core straight through jointing kit |
| 233 | Unloading/Loading of trivector meter |
| 234 | Unloading/Loading of 11KV Isolator |
| 235 | Unloading/Loading of changeover switch |
| 236 | Unloading/Loading of MCB/MCCB |
| 237 | Unloading/Loading Of Flood light |
| 238 | Drilling of holes in M.S Iron for fabrication |