| 1 | M.S Pipe Line |
| 2 | Dismantling of pipe lines 1” to 3’’ |
| 3 | do 4’’to 11’’ |
| 4 | do12” to 20” |
| 5 | do 21’’to48’’ |
| 6 | M.S Pipe Line |
| 7 | Erection of pipe line from 1” to 3” dia |
| 8 | do4” to 11” |
| 9 | do12to20 |
| 10 | do 21 to 48 |
| 11 | Fabrication of pipe line from 12”above |
| 12 | Flanges and blind up to 48” |
| 13 | dismantling of flanges/blind |
| 14 | refitting of old/new flanges/blind |
| 15 | fabrication of flanges blind from M.S. plateupto 48\" |
| 16 | Bends, reducersandnipples (up to 1’’ to 12’’) |
| 17 | Dismantling |
| 18 | fabrication |
| 19 | fitting |
| 20 | Bends, reducersand nipples (above 12’’) |
| 21 | Dismantling |
| 22 | fabrication |
| 23 | fitting |
| 24 | Dismantling , fab.anderection of M.S. / G.l pipe Accessories ( Tee, cross,distance piece7” to 12’’) |
| 25 | Dismantling |
| 26 | Fabrication |
| 27 | Erection |
| 28 | Dismantling , fab.anderection of M.S. / G.l pipeAccessories ( Tee,cross, distance piece above 12’’) |
| 29 | Dismantling |
| 30 | Fabrication |
| 31 | Erection |
| 32 | Dismantling , fab.anderection of M.S. / G.l pipeAccessories ( Tee,cross, 0 to 6”) |
| 33 | Dismantling, Fab.and Erection of M.S.tanks,/Vassalsfrom M.S plates,angle M.S channel ‘I’ section etc ( up to 6 mm plate ) |
| 34 | Dismantling |
| 35 | Fabrication |
| 36 | Erection |
| 37 | Dismantling, Fab.and Erection of M.S. Tanks/vessals from MS plate , angles, MS channel , I- section etc. |
| 38 | Dismantling |
| 39 | Fabrication |
| 40 | Erection |
| 41 | DismantlingandErection of railing |
| 42 | Dismantling |
| 43 | Fabrication |
| 44 | Erection |
| 45 | Valves |
| 46 | Dismantling 1’’ to 6’’ |
| 47 | Dismantling 7’’ to 12’’ |
| 48 | Dismantling above 12’’ size |
| 49 | fitting 1’’ to 6’’ |
| 50 | fitting 7’’ to 12’’ |
| 51 | fitting above 12’’ size |
| 52 | S.S Pipe Line |
| 53 | Dismantling of all size |
| 54 | Erection all size |
| 55 | Dismantling,fab., anderection of S.S.pipe Accessories(tee,cross,distance piece,nipples reducer and bend) up to 12” |
| 56 | Dismantling |
| 57 | Fabrication |
| 58 | Erection |
| 59 | Patch Work on tankandpipe(M S plate cutting, fittingandwelding, 02 round welding) |
| 60 | Dismantling , FabricationandErection of cone of bigger size will be treated |
| 61 | Dismantling |
| 62 | Fabrication |
| 63 | Erection |
| 64 | FabricationandErection of gutter of any size by Required thickness (bigger size will be treat as dia) |
| 65 | Dismantling , fabricationanderection of 3 Nos. hood of cutter ,chopper and leveler by 8/6 mm M.S. plate |
| 66 | Dismantling , Fabricationanderection of old feed pipe line Feed pump to boiler |
| 67 | Dismantlingof oldanderection of new I D Fan taper cone. |
| 68 | Dismantling , Fabricationanderection of old ducting from I.D. fan inlet damper to I D Fan . |
| 69 | Dismantling , Fabricationanderection of flue gas ducting size 5’ x 5’ |
| 70 | Dismantling , fabricationanderection of I.D.. fan casing form8 to 10mm M.S plate . |
| 71 | Dismantling , fabricationanderection of I.D. Fan outlet damper |
| 72 | Dismantling , fabricationanderection of I.D. Fan inlet damper |
| 73 | Dismantling ,fabricationandErectionof Bagasse elevator, bagasse carrierandRBC bottom and side plate worn out portion |
| 74 | Dismantling , fabricationanderection of Boiler bagasse feeding Chute by 8/6 mm M.S. plate. |
| 75 | Dismantling , erection and fabrication of umbrella of pan. |
| 76 | Dismantling , fabricationanderection of save all of Quad body. |
| 77 | Dismantling |
| 78 | Fabrication |
| 79 | Erection |
| 80 | Dismantling , FabricationandErection of save all of pan. |
| 81 | Dismantling |
| 82 | Fabrication |
| 83 | Erection |
| 84 | Stair case( fab. with chaquered plate /old plate and pipe line) |
| 85 | Dismantling |
| 86 | Fabrication |
| 87 | Erection |
| 88 | Dismantlingand erection of pump up to 4’’and15 hp motor Shifting of pump / motor upto 20 mtr distance |
| 89 | Dismantling |
| 90 | Erection |
| 91 | Dismantlinganderection of pump more than 4”and15 H.P motor Shifting of pump / motor more than 20 mtr distance |
| 92 | Dismantling |
| 93 | Erection ( pump / motor) |
| 94 | Ammoniaandgas coils ( Dismantling , fab.and erection) |
| 95 | Dismantling |
| 96 | Fabrication |
| 97 | Erection |
| 98 | Dismantling , fabricationanderection ofnew plate form asPer requirement from old M S plate 6mm to 8 mm thickness.up to 2 sqm |
| 99 | Dismantling |
| 100 | Fabrication |
| 101 | Erection |
| 102 | Dismantling , fabrication,anderection of new Plate from by M S/ chequared plate more than 2 sqmtr |
| 103 | Dismantling |
| 104 | Fabrication |
| 105 | Erection |
| 106 | Crystallizer Coils |
| 107 | Dismantling |
| 108 | Fabrication |
| 109 | Erection |
| 110 | Old andworn out staging , plate farm tank, vassals. |
| 111 | Dismantling |
| 112 | Fabrication |
| 113 | Erection |
| 114 | Repairing of rubber seated exhaust /vapor valve above 16 “ |
| 115 | Dismantling , fabricationanderection of side plate of canekicker cutter, leveler, and chopper by 8/6 mm M.S. plate |
| 116 | Dismantling , fabricationanderection of mill juice tray by 8 mm/10 mm M.S plate |
| 117 | Dismantlingof existing cane carrier chute and fabricationanderection of 8 to 10 mm M.S plate |
| 118 | Repairing of steam jacket for sulphur furnace |
| 119 | Replacement of steam jacket of evaporator bodies |
| 120 | Strengthening of vapour line above 16”by innerand outer side/ring of angle/pipes |
| 121 | Dismantling , fabricationanderection ofsupport angle,pipe,channelat any equipment |
| 122 | Hopper centre piece by 12 mmplate |
| 123 | Dismantling |
| 124 | Fabrication |
| 125 | Erection |
| 126 | Hopper tray |
| 127 | Dismantling |
| 128 | Fabrication |
| 129 | Erection |
| 130 | Sulphur Furnace cooler dismantling ,fab. and erection work |
| 131 | Sulphur Furnace scrubber dismantling , fabricationanderectionwork |
| 132 | ‘B’ Vacuum crystallizer shell to be changed from 10 MM M.S.plate |
| 133 | ‘C, Vacuum crystallizer shell to be changed from 10 MM M.S.plate |
| 134 | Dismantling ,Fabrication & Erection of S.F. Chamber with cooling Jacket complete. |
| 135 | Strengthening of factory columns of various size by 10 mm M.S.Plate angle channels etc. |
| 136 | Strengthening of factory beams of any size by M.S.plate angle channelI. Section etc. |
| 137 | Chipping ,cleaning and painting of columns and beamsorstaging of factory machinery. |
| 138 | Painting one coat with ready mixed paint in factory buildingM.S. column ( 25 mtr approx. height. and 15-5 mtr height approx) And M.S trusses including rubbing down old( if required at site.All the bracing and purlins are included with this work. |
| 139 | Dismantling, Fabrication and erection of any sizefactory/Building,columns beams and trusses |
| 140 | Dismantling ,Fabrication and erection of worn out Water pipes, nozzles, drain box etc. |
| 141 | Dismantling ,Fabrication and erection of worn out shell ofboth wet Scrubber |
| 142 | Dismantling, Fabrication and erection of worn out internal of both wet Scrubber |
| 143 | Dismantling, Fabrication and erection of wornflue gas ducting Size 5’ x5’of both Wet Scrubber from damper to chimney |
| 144 | Replacement of worn out portion of supports of molasses tank roof. |
| 145 | Replacement of worn out portion ofroof of molasses tank |
| 146 | Dismantling of Boiler exit flue gas damper |
| 147 | Dismantling, and erection of Boiler I.D., F.D. Fan impeller |
| 148 | Fabrication of staging of C/F machine NK 1100 and erection and commission of C/F machine NK 1100 .2 Nos |
| 149 | Replacement of weak portion of molasses tank up to a height of10 mtr by 6 mm,8 mm,10 mm , 12 mmplate etc. |
| 150 | Providing roof above molasses khacha pitby M.S./CGI sheets withProper columns, staging and tresses |
| 151 | Dismantlingandassembling of air heater outlet ducting |
| 152 | Dismantling of worn out Air Heater tubes |
| 153 | Replacement of worn out Air Heater tubes. |
| 154 | Dismantling , fabrication, erection of worn out bothboiler blow down line boiler to drain pit. |
| 155 | Dismantling, fabrication, erection of worn out of 2 nos.5” long bend of feed water line header |
| 156 | Replacement of juice heater partition plate in all respects |
| 157 | Reconditioning of worn out 02 Nos. J.H. ( 04 Nos covers)Juice Heater grooves with respect to its top/bottommating at outside cover |
| 158 | Dismantling of worn out body shell of any quad body |
| 159 | Fabricationanderection of body shell of anyquad body |
| 160 | Dismantling , fabrication, erection of 10\" x 20 \" vacuum filter mud tray |
| 161 | Dismantling of worn out body shell of anypan |
| 162 | Fabricationanderection of body shell of anypan |
| 163 | Dismantling , fabrication, erection of 8\" x 16 \" vacuum filter mud tray |
| 164 | Pan No. 3 Retubing work |
| 165 | Dismantling of worn out bottom and fabrication anderection of new bottom of Crystalizer no. 3,4,9 10 and 11 |
| 166 | Dismantling ofcalanderia ofpan |
| 167 | Fabrication, erection of calanderia ofpan |
| 168 | Dismantling ofcalanderia ofquad (evaporator) |
| 169 | Fabrication, erection of calanderia ofevaporator( quad) |
| 170 | Increasingthe length of hydraulic grab fingers |
| 171 | Dismantling , fabrication, erection ofkicker drum with holder assembly |
| 172 | Dismantling , erection commissioning of pan discharge valve of pan no 5 and 6 |
| 173 | Modification of mill Kush Kush Conveyor |
| 174 | Dismantling , erection commissioning of crystallizer shaft |
| 175 | Fabrication, erection of new juice door filtration system |
| 176 | Dismantling , fabrication, erection offlocculating chamber top andbottom plate of door |
| 177 | Crystallizer spiral ribbon strip has to dismantle and again set right fitting. Worn out armsandother related Work also to be done |
| 178 | Dismantling , fabrication, erection ofworn out runner of cane carrier/bagasse elevator/ RBC/MBC |
| 179 | Dismantling the kush-kush conveyorandhole to be increased |
| 180 | Dismantling , fabrication, erection ofworn out portion of D.S.M. screen |
| 181 | Fabrication, erection ofI.D fan cone ring with flange |
| 182 | Erectionandcommissioning ofB- messcutte C/F machine including machine structure ,leveling of machine and related work to be done in all respect of M/C |
| 183 | Dismantling of oldworn out and fabrication, erection ofnew juice sulphitor internal drum |
| 184 | Juice ring fabrication by 6mm plate for mill rollers |
| 185 | Hinge type cover fabrication at chopper, levelerandcutter |
| 186 | Railway line changing of cane unloader |
| 187 | Dismantling ,Fab. & Erection of condenser catcher of vaccum filter |
| 188 | Dismantling ,Fab. & Erection of molasses conditioner of Pan |
| 189 | Labour supply of ( per day 8 hr. basis)Turner, Mechinist, Fitter, Electrician, Wireman, Welder |
| 190 | Labour supply of ( per day 8 hr. basis)Helper and Khalasi |
| 191 | Supply of ( per day 8 hr. basis)Draftsman, Foreman |