Annual Rate Contract For Water Work-1 Labour Work Of Fitting Of The Water Pvc / Upvc Etc. Pipe Line Including Excavation, Dismantling, Filling Trenches With Sand Upto 0.30 Mt From The Top Of Pipe , Leveling Etc. In Nagarpalika Area Up To 1.5 Mtr Depth In As Per Directed Incharge Superviser 2 Labour Work Of Fitting Of The Water Pvc / Upvc Etc. Pipe Line Including Excavation, Dismantling, Filling Trenches With Sand Upto 0.30 Mt From The Top Of Pipe , Leveling Etc. In Nagarpalika Area 1.5 To 3 Mtr Depth As Per Directed Incharge Superviser 3 Labour Work Of Fitting Of Water Pipeline Joint Including Excavation, Demolition, Dismantling, Filling Trenches , Leveling Etc. In Nagarpalika Area Up To 3 Mtr Depth As Per Directed Incharge Superviser 1.5 Inch To 3 Inch 4 Inch To 8 Inch 4 Labour Work Of Fitting Of Water Valve Including Excavation, Demolition, Dismantling, Filling Trenches , Leveling Etc. In Nagarpalika Area Up To 3 Mtr Depth As Per Directed Incharge Superviser 2 Inch 2.5 To 3 Inch 4 Inch 6 Inch 8 Inch 5 Labour Work Of Foot Valve Repairing Including Excavation, Demolition, Dismantling, Filling Trenches , Leveling Etc. In Nagarpalika Area Up To 3 Mtr Depth As Per Directed Incharge Superviser 7 Labour Work Of Cleaning Of Esr & Sump At Nagarpalika Area As Per Directed Incharge Superviser 8 Labour Work Of Water Valve Nut With Service As Per Directed Incharge Superviser 9 Labour Work Of Installing And Removing Submersible Motor From The Sump As Per Directed Incharge Superviser 2 Pump 3 Pump 4 Pump 10 Labour Work Of Fitting Of The Water Galavenized Etc. Pipe Line Including Excavation, Demolition, Dismantling, Filling Trenches, Leveling Etc. In Nagarpalika Area Up To 3 Mtr Depth As Per Directed Incharge Superviser 1 Inch 2 Inch 3 Inch 4 Inch 6 Inch 11 Labour Work Of Euopean / Indian W.C. Fitting As Per Directed Incharge Superviser 12 Labour Work Of Urinal Tub Fitting As Per Directed Incharge Superviser 13 Labour Work Of Wash Basin Fitting As Per Directed Incharge Superviser 14 Construction Of Sock Pit Of Brick Masonary Including Slab With All Materials Etc. As Per Directed Incharge. 6 Ft ( Dia ) X 10 Ft ( Depth ) 6 Ft Dia X 15 Ft ( Depth ) 8 Ft Dia X 15 Ft ( Depth ) 15 Construction Of Chamber ( M.H ) Of Brick Masonary Including Excavation, Demolition, Dismantling , Plastering And Fitting Of Cover And Frame With All Materials & Bedding Of 1:4:8 Pcc Etc As Per Directed Incharge Superviser 3 Ft X 3 Ft X 4 Ft 4 Ft X 4 Ft X 5 Ft 4 Ft X 4 Ft X 6 Ft 16 Fitting Of The Di Pipe Line Excavation, Demolition, Dismantling, Filling Trenches, Levelling Etc. In Nagarpalika Area Up To 3 Mtr Depth As Per Directed Incharge Superviser 200 Di Pipe 250 Di Pipe 300 Di Pipe 400 Di Pipe 200 Di T 400 Di T 200 Di Elbo 300 Di Elbo 400 Di Elbo 200 Di Valve 250 Di Valve 300 Di Valve 400 Di Valve 200 Di Line Joint 250 Di Line Joint 300 Di Line Joint 400 Di Line Joint 17 Drilling Of Horizontal Bore Hole For Pushing Of 110 Mm Water / Gutter Pipe Line Under Road Or Other Crossing Strata Including Excavation, Demolition, Dismantling, Filling Trenches, Leveling &, Carting Etc. With All Lead And Lift In Nagarpalika Area Up To 1.5 Mtr Depth As Per Directed Incharge Superviser 18 Drilling Of Horizontal Bore Hole For Pushing Of 110 Mm Water / Gutter Pipe Line Under Road Or Other Crossing Strata Including Excavation, Demolition, Dismantling, Filling Trenches, Leveling &, Carting Etc. With All Lead And Lift In Nagarpalika Area From 1.5 Mtr To 3.0 Mtr Depth As Per Directed Incharge Superviser 19 Drilling Of Horizontal Bore Hole For Pushing Of 160 Mm Water / Gutter Pipe Line Under Road Or Other Crossing In All Strata Including Excavation, Demolition, Dismantling, Filling Trenches, Leveling &, Carting Etc. With All Lead And Lift In Nagarpalika Area Up To 1.5 Mtr Depth As Per Directed Incharge Superviser 20 Drilling Of Horizontal Bore Hole For Pushing Of 160 Mm Water / Gutter Pipe Line Under Road Or Other Crossing In All Strata Including Excavation, Demolition, Dismantling, Filling Trenches, Leveling &, Carting Etc. With All Lead And Lift In Nagarpalika Area From 1.5 Mtr To 3.0 Mtr Depth As Per Directed Incharge Superviser 21 Demolition And Disposal Of Unserviceable Materials With All Lead And Lift.