Mainline Pumping Unit Mainline Pumping Unit , Api610 Bb-1 / Bb-3 Type , Item Supply , Pumping Unit ( Bb1 / Bb3 Type As Per Api 610 Latest Edition ) - Complete Unit Consisting Of Horizontal, Axially Split Type Centrifugal Pump, Flameproof Electric, Noida-Uttar Pradesh
TDR : 32443099
Tender Notice
Corrigendum Details
BOQ
Expired
Noida
Uttar Pradesh
Corrigendum : Mainline Pumping Unit Mainline Pumping Unit , Api610 Bb-1 / Bb-3 Type , Item Supply , Pumping Unit ( Bb1 / Bb3 Type As Per Api 610 Latest Edition ) - Complete Unit Consisting Of Horizontal, Axially Split Type Centrifugal Pump, Flameproof Electric
ITEM: Motor Driven Mainline Pumping Units for MMPL (P-25)pipelineProject (IPS-2 Near Jodhpur)
Sl. No.
Item Description
1
ITEM SUPPLY
2
Pumping unit (BB1 / BB3 type as per API 610 latest edition) - Complete unit consisting of Horizontal, axially split type centrifugal pump, flameproof electrical motor with all accessories like coupling with coupling guard, Mechanical seal, cooling and flushing piping, pump protective instruments, common base plate and with all necessary instrumentation including supply of foundation bolts, grouting materials, counter flanges(WNRF) and commissioning spares as per specifications.Q-2486 M3/Hr,H-302 MCL
3
Case Wear Ring
4
Impeller Wear Ring
5
Impeller (Full Dia)
6
Pump Shaft
7
Throat Bush
8
Rolling Element/Hydrodynamic – Radial and Thrust Bearing
9
Bearing Pads only (Hydrodynamic -Radial &Thrust) if applicable
10
Shaft Sleeve
11
Impeller Key
12
Coupling Key
13
Rotary & Stationary Inserts for Mechanical Seal
14
Pump Casing Gasket & any other Gaskets/O-Rings required
15
Set of \"O\" Rings/ Gaskets for Mechanical Seal
16
Complete Mechanical Seal (DE+NDE)
17
Hydraulic Torque Wrench with suitable Power Unit (Electric Operated-Explosion Proof Or Pneumatic Operated along with Two Sets of repair Kits) for Pump Casing Bolts
18
Bearings (DE & NDE) for motor
19
Cooling fan for motor
20
Pump Bearing RTD
21
Pump Casing RTD
22
Motor Bearing RTD
23
Vibration Probe along with Transmitter for Pump (1 No Probe and Transmitter of each type)
24
Vibration Probe along with Transmitter for Motor (1 No Probe and Transmitter of each type)
25
Speed Sensor & Converter/Transmitter
26
DPLT/LS (Seal lekage system)
27
Service charges for pre-commissioning check, installation & commissioning personnel including all expenses e.g. Air/Rail Fare, Local Transport, accommodation etc.for pumping units as per techincal specification.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.