}

Supplying Of Materials, Tools , Plants And Skilled And Unskilled Man Power For Repairing And Maintenance Of Existing Structure And Fitting, Fixing All Works With Operation & Maintenance The Entire Works During Shrawani Mela -2022 At Dumma Boarder To, deoghar-Jharkhand

Government Departments has published Supplying Of Materials, Tools , Plants And Skilled And Unskilled Man Power For Repairing And Maintenance Of Existing Structure And Fitting, Fixing All Works With Operation & Maintenance The Entire Works During Shrawani Mela -2022 At Dumma Boarder To. Submission Date for this Tender is 02-06-2022. Man Power Supply Tenders in deoghar Jharkhand. Bidders can get complete Tender details and download the document.




Tender Notice

32408351
Supplying Of Materials, Tools , Plants And Skilled And Unskilled Man Power For Repairing And Maintenance Of Existing Structure And Fitting, Fixing All Works With Operation & Maintenance The Entire Works During Shrawani Mela -2022 At Dumma Boarder To
Open Tender
Indian
Jharkhand
Deoghar
02-06-2022

Tender Details

Supplying Of Materials, Tools , Plants And Skilled And Unskilled Man Power For Repairing And Maintenance Of Existing Structure And Fitting, Fixing All Works With Operation & Maintenance The Entire Works During Shrawani Mela -2022 At Dumma Boarder To Nearsaheb Yadaw ( Plant No.-01Near Plant No.- 03 ) Under D.W & S. Division , Deoghar For The Year 2022-23Group No. Sm-D-01- 1 A. Water Supply & Sanitation 2 Jungal Clearence Including Weeding Out Shrubs And Small Trees Up To 150 Mm Dia Girth And There Removalas Per Specification And Direction Of E / I. 3 Dismantling Patent Stone Flooring Including Stacking Serviceable Materials In Countable Stacks Within 15 M Lead And Disposal Of Unserviceable Materials With All Leads All Complete As Per Direction Of E / I. 4 Providing 25 Mm Thick First Class Patent Stone Flooring ( 1:2:4 ) With Stone Chips, In Two Layers, Bottom Layer 19 Mm Thick ( 1:2:4 ) With 12 Mm To 6 Mm Size Graded Stone Chips And Top Layer 6 Mm Thick ( 1:2 ) With 6 Mm Down Stone Chips In Panels, Including Cost Of Curing, Finishing The Surface Smooth By Rubbing With Carborun-Dum Stone, Taxes And Royalty All Complete As Per Building Specification And Direction Of E / I. 5 Providing 12 Mm, Cement Plaster ( 1:6 ) With Clean Coarse Sand Of F.M 1-5 Including Screening, Curing With All Leads And Lifts Of Water, Scaffolding Taxes And Royalty All Complete As Per Building Specification And Direction E / I. 6 Providing Designation 75 A Brick Work In C.M. ( 1:4 ) In Foundation And Plinth With Approved Quality Of Clean Coarse Sand Of F.M. 2 To 2.5 Including Providing 10 Mm Think Mortar Joints, Cost Of Screening Materials, Raking Out Joints Of 15Mm Depth, Curing Taxes And Royalty All Complete As Per Building Specification And Direction Of E / I 7 Supplying All Materials, Labour, Writing Name Of Department, Male & Female Directionon The Wall After Making Box By Good Quality Of Paint As Per Direction Of E / I. 160 Mm High Letter 8 Cost Towards Painting And Writing Slogan On Board 4’ X 3’ Size With Good Quality Paint Carrying And Fitting Fixing On Each Site Including Minor Repair Of Board Taking Back After Mela As Per Direction Of E / I. ( 150 Mm High Letter ) 9 Cost Towards Transportation Ofsubmersible Pump, Pipe Fittings Etc. From Store To Work Site Including Carriage Water Tank Etc. All Complete. 10 Cost Towards Fitting & Fixing Submersible Pump With Clamp Etc. All Complete Including Lowering Of Pvc Pipe. 2H.P To 7.5H.P And Taking Out After Ending Mela And Deposited In Departmental Store Deoghar. 11 Cost Towards Dismantling After Mela And Taking Back To Work Site From Store Including Carriage Of All Materials And Pump, Water Tank Etc. All Complete. 12 Earth Work In Excavation For Laying Of Pipe So As To Give One Meter ( Avg. ) Cover Over The Socket Of Pipe And Back Filling The Trenches After Laying Of Pipe, Again A / W In Excavation And Taking Out The Laid Pipeand Back Filling The Same After The End Ofshrawani Mela. 13 Earth Work In Back Filling The Trenches Fatter Laying Different Types And Size Of Pipes With Earth Removed During Excavation Within Initial Lead And Lift As Per Specification And Direction E / I. 14 Laying Of Pvc Pipes Of Approved Make In Trenches With Red Lead And Yarn With Socket And Screw Joints And Cutting Pipe So Size And Threading Ends Where Necessary Etc. All Complete As Per Specification And Direction E / I. ( Pipes To Be Supplied Departmentally Free Of Cost ) ( I ) 32 Mm Dia Pvc Pipe. 15 ( I ) 25 Mm Dia Pvc Pipe. 16 Laying Of Pvc Pipes Of Approved Make On Walland Roofwith Red Lead And Yarn With Socket And Screw Joints And Cutting Pipe So Size And Threading Ends Where Necessary Etc. All Complete In Wallas Per Specification And Direction E / I. ( Pipes To Be Supplied Departmentally Free Of Cost ) ( I ) 15 Mm Dia Pvc Pipe 17 ( I ) 20 Mm Dia Pvc Pipe 18 ( Ii ) 25 Mm Dia Dia Pvc Pipe 19 Cost Towards Engaging Pump Operatarcum Water Spreader On Laid Sand For Operating And Spreading Water On Sand Etc.All Complete Job. Grade -Ii 20 Cost Towardscleaning The Rcc Water Storage Tank Over Pump House Having Size 3 M X 3 M X 2 M Including The Cost Of Bleaching Powder, Jute, Sacfolding Etc. All Complete. 21 Cost Towards Engagingplumber Andelectric Mistryduring Mela Periodincluding Contractor Profit. Plumbergr.-Ii 22 Electric Mistry Gr.-Ii 23 Cost Towards Extra Materials Due To Damages During Taking Out Damage Cut Pieces Including Laboaur Cost As Per Direction Of E / I. In Walls / Trenches32 Mm Dia Pvc Pipe . ( Rate Of Pvc Pipe + Laying Cost Charge ) 24 25 Mm Diapvc Pipe . ( Rate Of Pvc Pipe + Laying Cost Charge ) 25 15 Mm Diapvcpipe . ( Rate Of Pvc Pipe + Laying Cost Charge ) 26 32 Mm Dia Pvc Elbow 27 25 Mm Dia Pvcelbow 28 15 Mm Dia Pvc Elbow 29 32 Mm Dia U / S Pvc 30 25 Mm Dia U / S Pvc 31 25 X 25 X 15 Mm Dia Reducing Tee Pvc 32 32 Mm Dia Pvc Fta 33 25 Mm Dia Pvc Fta 34 15 Mm Dia Pvc Fta 35 15 Mm Dia Pvc Coupler 36 25 Mm Diapvc Coupler 37 32 Mm Diapvc Coupler 38 15 Mm Pvc Shower 39 15 Mm P.V.C Bib Cock 40 32 X 32 X 25 Mm Dia Tee Pvc 41 Providing Two Coats Of Snowcem Of Approved Shade And Make Over Old Surface Including Washing, Cleaning, Sand Papering The Wall, Scaffolding, Curing And Taxes All Complete As Per Building Specification & Direction Of E / I. 42 Providing And F / Fixing Water Supply Arrangement From Gi Hdpe Tank To Bathing Palatform As Per Site Condition Including Required Fittings And Pvc Pipe All Completeincluding Installation Ofhdpe Water Storage Tank Including Carriage Of Tank From Departmental Store To Work Site. ( Hdpe Water Storage Tank Will Be Supplied Free Of Cost Departmentally ) 43 B. Sanitary Installation 44 Providing 12 Mm, Cement Plaster ( 1:6 ) With Clean Coarse Sand Of F.M 1.5 Including Screening, Curing With All Leads And Lifts Of Water, Scaffolding Taxes And Royalty All Complete As Per Building Specification And Direction E / I. 45 Providing Designation 75 A Brick Work In C. M. ( 1:6 ) In Different Places In Sewer Line With Approved Quality Of Clean Coarse Sand Of F. M. 2 To 2.5 Including Do…..Do…….All Complete As Per Building Specification And Direction Of E / I. 46 Labour For Scrapping Old Paint With Paint Remoter And Below Lamp As Required On Wooden Or Steel Surface Including Cost Of All Labour And Materials And Scaffolding All Complete As Per Balding Specification And Direction Of E / I. 47 Providing One Coat Of Painting With Ready Mixed Paint Of Approved Shade And Make Over Steel Surface Including Cleaning The Surface Toughly, Scaffolding And Taxes All Complete As Per Building Specification And Direction Of E / I. 48 Providing Supplying, Fitting And Fixing Of The Followingmaterials In Connection Of Latrine Room ( Wall ) 25 Mm Dia Pvc Pipe . ( Rate Of Pvc Pipe + Laying Cost Charge ) 49 15 Mm Diapvc Pipe. ( Rate Of Pvc Pipe + Laying Cost Charge ) 50 25 X 25 X 15 Mm Pvc Tee 51 25 Mm Dia Pvc Coupler 52 15 Mm Dia Pvc Coupler 53 25 Mm Dia Pvc U / Socket 54 25 Mm Dia Fta 55 15 Mm Dia Fta 56 25 Mm Dia Pvc Elbow 57 15 Mm Diapvc Elbow 58 Providing And Fixing 15 Mm Dia Male Ended C.I. Bodybrass Spindle Valve And Seat Bib Clock Of Approved Quality ( Wt- Not Less Than 400 Gms. ) With Extra Socket All Complete As Per Specification And Direction E / I. 59 Providing Onecoat Of Oil Bound Distemper Of Approved Shade And Make Over Old Surface Including Washing, Cleaning And Papering The Walls, Scaffolding, Washing Of Floors And Taxes All Complete As Per Building Specification And Direction Of E / I. 60 Supplying Of Following Materialsmug 61 Plasticbucket 62 Providing Designation 75 A Brick Work In C.M. ( 1:6 ) In Foundation And Plinth With Approved Quality Of Clean Coarse Sand Of F.M. 2 To 2.5 Including Providing 10Mm Think Mortar Joints, Cost Of Screening Materials, Raking Out Joints Of 15Mm Depth, Curing Taxes And Royalty All Complete As Per Building Specification And Direction Of E / I 63 Supplying Labour Tools And Fitting Fixing Steel Door In Toilet Complex All Complete. 64 Supplying, Fitting And Fixing 20 Gauge G.C.I Sheet Gate Fitted On M.S Angle Frame Of Size60*60*6 Mm Including Cost Of Fabrication, Providing Necessary Locking Arrangement With Haskal And Domny Duly Fixed In C / C ( 1:2:4 ) Blocks Of Required Size, Applying A Priming Red Lead Paint Over Steel Work, Taxes All Complete As Per Drawing Specification And Direction Of E / I 65 Earth Work In Excavation For Laying Of Pipe So As To Give One Meter ( Avg. ) Cover Over The Socket Of Pipe And Back Filling The Trenches After Laying Of Pipe, Again A / W In Excavation And Taking Out The Laid Pipeand Back Filling The Same After The End Ofshrawani Mela 66 Earth Work In Back Filling The Trenches Fatter Laying Different Types And Size Of Pipes With Earth Removed During Excavation Within Initial Lead And Lift As Per Specification And Direction E / I. 67 Laying Of 32 Mm Dia Gi / Pvc Pipe In Trenches And Taking Out The Same 68 Supplying Of 32 Mm Dia Pvc Pipe With Socket In 3 M Length Do-Do All Complete. 69 Laying & Jointing Gi / Pvc Pipe In Hanging Position Ovar Support And Taking Out The Same After And Of Shrawani Mela ( Pipe Supplied Departmentally Free Of Cost ) A. 32 Mm Dia. Pipe 70 B.25 Mm Dia. Pipe 71 Supplying And Fixing Gifittings Of Approved Make All Complete As Per Specification And Direction E / I.. 32 Mm U / S 72 25 Mm Socket 73 32 X 25 R.S. 74 32 X 25 Elbow 75 25 Mm U / S 76 32 Mm Tee 77 Electric Welding Of 15 Mm Dianipple In 25 Mm Dia Gi Pipe After Making Hole Of 20 Mm Dia Including Cost Ofnipple. In 32 Mm Dia. Pipe 78 In 15 Mm Dia. Gi Nipple 79 Cost Of 15 Mm Dia. Gi. Socket 80 Providing Pump Operator Cum Water Spreaderfor Operating Motor And Spreading Water On Laid Sand. ( 1 Nox 9:0Am To 5:00Pm ) Gr.-Ii 81 Cost Towards Fitting & Fixing Submersible Pump With Clamp Etc. All Complete Including Lowering Of Pvc Pipe. 2H.P To 7.5H.P And Taking Out After Ending Mela And Deposited In Departmental Store Deoghar. 82 D. Peyaoo 83 Providing Two Coats Of Oil Bound Distemper Of Approved Shade And Make Over Old Surface Including Washing, Cleaning And Prepairing The Wall, Scaffolding Washing Of Floors And Taxes All Complete As Per Building Specification And Direction Of E / I. 84 Providing One Coat Of Plastic Emulsion Paint Of Approved Shade And Make Over Old Surface Including Washing, Cleaning And Preparing The Walls, Scaffolding, Washing For Floor And Taxes All Complete As Per Building Specification And Direction Of E / I. 85 Providing Two Coats Of Snowcem Of Approved Shade And Make Over Old Surface Including Washing, Cleaning, Sand Papering The Wall, Scaffolding, Curing And Taxes All Complete As Per Building Specification & Direction Of E / I. 86 Providing And F / Fixing Water Supply Arrangement From Gi / Hdpe Tank To Peyaoo Andbathing Palatform As Per Site Condition Including Required Fittings And Pipe All Complete Including Installation Of Hdpe Water Storage Tank Including Carriage Of Tank From Departmental Store To Work Site. ( Hdpe Water Storage Tank Will Be Supplied Free Of Cost Departmentally ) 87 E. Spreading Water Over Laid Sand 88 Providing Labour Tool And Equipmentfor Spreading Water Over Laid Sand At Kanwariya Path During Shrawani Mela. A ) Cost Of Flexible Pvc Pipe 89 B ) Labour Charge For 1 Place X 30 Dasys ( Unskiled Labour ) 90 Carriage Ofall Materials From Store To Work Site And Return Back To Work Site To Departmental Store Within A Distance Of 15Km . 91 Cost Towards Electric Consumption Charge For To Be Paid To Electricity Board During Shrawani Mela .Payable Jseb 92 Carriage Of Materials Fromkiln Site Or Quarry Site To Work Site Including Contractor Profit, Loading, Unloading, Transportation, Etc. All Complete.Bricks Up To 15 K.M. 93 Sand Up To 15 K.M. 94 Stone Chips Up To 15 K.M. 95 Cement Up To 15 K.M. 96 Add Gst @ 12% 97 Add 1 % Labour Cess

Key Value

Document Fees
INR 1250 /-
EMD
INR 10500.0 /-
Tender Value
INR 5.01 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail