Dismantling Fabrication Erection Jobs- 1 Dismantling, Fabrication & Erection Jobs 2 Dismantling Of Ms / Ci / Gi Pipe Line Upto 12 3 Erection Of Ms / Ci / Gi Pipe Line Upto 12 4 Dismantling Of Ms / Gi / Cipipe Line, Flanges, Nipples, Bends, Reducers Allsizes. 5 Erection Of Ms / Ci / Gi Pipe Line, Flanges, Nipples, Bends, Reducers Allsizes. 6 Fabrication Of Bends, Nipples, Reducer, Tee Of All Sizes. 7 Fabrication Of M.S. Blinds Of All Sizes 8 Dismantling Of S.S. Pipe Line Upto 12 9 Erection Of S.S. Pipe Line Upto 12 10 Dismantling Of S.S.Bends , Nipple, Reducer, Tee Etc 11 Erection Of S.S. Bends, Nipplem Reducer, Tee Etc 12 Dismantling Of S.S. Pipe Line Above 12 13 Erection Of S.S. Pipe Line Above 12 14 Fabrication Of S.S. Pipe Line Above 12 15 Fabrication Of S.S.Bends , Nipple, Reducer, Tee Above 12 16 Erection Of S.S. Bends, Nipplem Reducer, Tee Above12 17 Dismantling Of All Types Ofcocks / Valves Of All Sizes. 18 Erection Of All Types Of Cocks / Valves Of All Sizes. 19 Dismantling And Erection Of M.S. Plateform. 20 Fabrication Of M.S. Plateform. 21 M.S. Patch Work 22 Dismantling & Erection Of Manhole Of All Sizes Including Nipple, Blind Etc. 23 Replacement Of S.S. / Brass Tubes Of All Evaporators, Juice Heater, Semikestner, Vapour Cell & Pans During Season And Off Season As Per Requirement. 24 Pluging Of Tubes Of Juice Heater, Semikestner, Vapour Cell, Evaporator Bodies, Pans. 25 Fabrcation And Erection Of Lquidation Tray For Both Mud Lime Of Dorr And Its Outlet Pipes To Be Put In Mud Receiving Tank Of Rvf. 26 All Welding Works / Joints. 27 Fabrication And Erection Of Ss Rubber Seated Valve Of All Sizes. 28 Fabrication & Erection Ofgrit Catcher Of Pumps. 29 Fabrication & Erection Ofstrainer Of Pumps. 30 Dismantling And Erection Of Ms Flat / T.Iron / Runners Of Carriers 31 Fabrication Of Inter And Secondary Carrier Racks 32 Dismantling, Fabrication & Erection Ofhood Of Chopper / Leveler / Fibrizer And Id Fan. 33 Repair Of Donelly Chute I.E. Replacement Of Wornout Plates. 34 Fabrication & Erection Of Shed For Electric Motors, Panel Boards And Any Other Machinery Parts. 35 Strengthening Of Structure Of Cane Unloader No. 1 / 2 / 3. 36 Dismantling, Fabrication & Erection Of Dampers In Discharge Chutes Pan. 37 Straighteningof Ms Old Plates To Be Used As Platform. 38 Replacement Of Wornout Portion Of Bagacillo Jacket Of Bagasse Elevator. 39 Trough Of Rbc Chain. 40 Dismantling, Fabrication And Erection Of All Wornout Beam Channel, Angles Etc In Boiling House As Per Required. 41 Cutting Of Ss / Brass Tubes Of Pans / Evaporator Bodies / Juice Heaters Etc. 42 Dismantling, Fabrication And Erection Of All Sugar Grader Chutes Complete. 43 Dismantling & Erection Of Air Compressor With Motor And Bed. 44 Dismantling, Fabrication & Erection Ofmud Tray Of Rvf. 45 Dismantling, Fabrication & Erection Of Vapour Vent Coil Of Juice Heater / Semikestner / Vapour Cell / Quad Bodies / Pan. 46 Replacement Of Wornout Ms Partition Plates Including Ms Strips Complete Ofjuice Heatertop Portion Complete 47 Repair Of Ms Of Squarber For Holding Of Rubber Strips Of Juice Heaters Of Top And Bottom Portion. 48 Virbo Screen At Lime Station Or Melter. Erection 49 Dismantling, Fabrication & Erection Ofprimary Cooler With Water Spray Coil Complete In All Respect 50 Dismantling, Fabrication & Erection Of C. Secondary Cooler With Water Spray Coil Complete In All Respect 51 Replacement Of Wornout Juice Chamber Of Dorr Including Top. 52 Dismantling, Fabrication And Erection Of Save All With Baffles Of Quad Bodies / Pan. 53 Repair Of Internal Water Pipe Nipple Ss Nozzle Box Etc. Of Pan / Quad Condensers. 54 Dismantling, Fabrication And Erection Of Vacuum Cryt. Complete In All Respect With Shaft And Arm With Trail. 55 Replacement Of Wornout Bottom Round Portion Of Cryst, 56 Dismantling, Fabrication And Erection Of Plain Hopper With Satisfactory Trial. 57 Dismantling, Fabrication And Erection Of Tray Pieces Of Multi Tray Hopper. 58 Replacement Of Both Scrappers Of Etp Secondary Clarifier. 59 Repair Work Of Wornout Top Roof Of Final Molasses Tank By Carpeting 3 Mm / 4 Mm Ms Plate. 60 Dismantling And Fitting Of Sight Glass Frame Compete As Required. 61 Dismantling & Erection Of Driving Portion Of Sugar Hopper.