| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30cm in depth 1.5mtrs in width as well as 10sqm on plan) including disposal of excavated earthlead upto 50M and lift upto 1.50 M, disposal earth to be levelled and neatly dressedas per the directions of Engineer Incharge complete. |
| 2 | P/L of dry stone soling 75 mm nominal size duly hand packed with ramming, dressing, watering and compacting all inclusive leads, lifts, loading, un-loading,cost and carriage of material involved complete. |
| 3 | P/L, in position cement concrete of specified grade excluding the cost of centering & shuttering. All work up to plinth level in 1:4:8 (1cement: 4 coarse, sand: 8 graded stone aggregate of 40 mm Nominal size (Crushed) complete. |
| 4 | P/L, in position reinforced cement concrete of specified grade excluding the cost of centering & shuttering. in 1:1.5:3 (1cement: 1.5 coarse sand: 3 graded stone aggregate of 20 mm Nominal size in Walls (any thickness) incl. attached Pilasters, buttresses, plinth and String courses, fillets, columns, pillars, piers, abutments, posts & struts upto floor V-Level incl. curing complete. |
| 5 | Reinforcement for RCC work including straightening ,cutting ,bending, placing in position and binding all complete (Thermo Mechanically treated bars). |
| 6 | Centering and shuttering incld. strutting ,propping etc. and removal of form work for foundation, footings etc complete. |
| 7 | Supply and filling of 2nd class stones duly hand packing in wire crates including tipping and cost of stones incl. wire crates and carriage of material Incl cost of crates. |
| 8 | Supply, stacking and laying ofNaturally occurring gravel close graded maximum aggregate size range 75mm granular sub base course nallahincluding sorting, spreading to template, watering and consolidation to required gradient and camber with 80-100KN road roller all inclusive leads, lifts, loading, unloading carriage of materials from nearest source to site of work complete. Finished work to be measured. |
| 9 | Carriage of Materials:- |
| 10 | Stone agg. For avg lead of 20 Kms |
| 11 | Sand for an average lead of 20 Kms |