Tender For Various Type Repair Jobs For Maintenance Of Plant And Machinery On Contract Basis.- 1 Dismantling, Fabrication And Erection Of M.S. Plate Job ( Tank, Gutter, Chute, Pipe Rolling& M.S. Structure Plat Farm ) Upto 12 Mm Thickness Plate. 2 I ) Dismantling 3 Ii ) Fabrication 4 Iii ) Erection 5 Dismantling, Fabrication & Erection Of M.S., G.I. Pipe Line ( 1’’ To 12’’ ) 6 I ) Dismantling 7 Ii ) Fabrication 8 Ii ) Erection 9 Dismantling, Fabrication And Erection Of Pipe Accessories ( Bend, Reducer, Flanges, Blind, Nipple, Tee, Etc. ) ( 1’’ To 12’’ ) 10 I ) Dismantling 11 Ii ) Fabrication 12 Iii ) Erection 13 Dismantling Of Valves / Nrv 14 I ) Upto 6” Dia 15 Ii ) 7” Dia To 12” Dia 16 Erection Of Valves / Nrv 17 I ) Upto 6” Dia 18 Ii ) 7” Dia To 12” Dia 19 Dismantling And Erection Of Angle / Sluice / Nrv Valve 16” – 36” 20 I ) Dismantling 21 Ii ) Erection 22 Dismantling, Fabrication & Erection Ofhand Railing 23 I ) Dismantling 24 Ii ) Fabrication & Erection 25 Dismantling & Erection Of S.S. Pipe. 26 I ) Dismantling 27 Ii ) Erection 28 Dismantling & Erection Of Seamless Pipe. 29 I ) Dismantling 30 Ii ) Erection 31 Dismantling & Erection Of Seem Less Pipes Accessories ( Bend, Reducer Blind Nipple, Tee, Flange ) 32 I ) Dismantling 33 Ii ) Fabrication 34 Iii ) Erection 35 Dismantling, Fabrication & Erection Ofm.S. Pipe ( 12” Dia To28’’ Dia ) 36 I ) Dismantling 37 Ii ) Fabrication 38 Iii ) Erection 39 Dismantling Fabrication Erection Pipe Accessories ( Bend, Reducer, Tee, Nipple, Flange Blind ) 12” Dia To 28’’ Dia ) 40 I ) Dismantling 41 Ii ) Fabrication 42 Iii ) Erection 43 Dismantling Fabrication Erection Pipe Accessories ( Bend, Reducer, Tee, Nipple, Flange Blind ) 28” Dia & Above 44 I ) Dismantling 45 Ii ) Fabrication 46 Iii ) Erection 47 Dismantling And Erection Ofvapour / Exhaust Pipe 48 Dismantling / Fabriction And Erection Ofvapour / Exhaust Pipe Bend. 49 I ) Dismantling 50 Ii ) Fabrication 51 Iii ) Erection 52 Dismantling, Fabrication & Erection Of M.S. Coil 53 I ) Dismantling 54 Ii ) Fabrication 55 Iii ) Erection 56 Repair / Replacement Of Worn Out Boiler Ducting 57 Welding Of Pan Shell From Inside At The Joint Of Shelland Cone. 58 Dismantling Fabrication, Repair & Erection Of Semikestner / Vapour-Cell Save All 59 I ) Dismantling 60 Ii ) Fabrication 61 Iii ) Erection 62 Iv ) Repair 63 Dismantling Fabrication, Repair & Erection Of Quad Body Save All 64 I ) Dismantling 65 Ii ) Fabrication 66 Iii ) Erection 67 Iv ) Repair 68 Dismantling Fabrication And Erection Of Pan Umbrella Made From 6 Mm Thick Plate. 69 Dismantling Fabrication And Erection Ofevaporator Body Umbrella. 70 Dismantling Of Old Tubes & Fitting Of New Ss Tube Of Juice Heater With Hydraulic Testing. ( Retubing Of Body ) 71 Dismantling Of Old Tubes & Fitting Of New Ss Tubes Of Quad Body With Hydrolic Testing ( Retubing Of Body ) 72 Welding Of Exhaust / Vapour Joints. 73 Dismantling & Fabrication And Erection Ofboiler Expansion Joint. 74 Dismantling Fabrication And Erection Of Juice Sulphiter So2 Coils 75 Dismantling Fabrication & Erection Of So2furnace Primary Cooler 76 Dismantling / Fabrication And Erection Of After Burner 77 Dismantling & Refitting And Expanding Of Air Heater Tubes And Trial. 78 Dismantling Fabrication And Erection Of Down Take Of Pan. 79 Cutting & Refitting Shell Of Quad / Pan Save -All For Checking / Cleaning. 80 Dismantling, Fabrication & Erection Of Juice Sulphitor So2 Box 81 Replacement Of Worn Out Perforated Plates Of Steam Entry At Quad Bodies 82 Cutting Ofportionof Calenderia Shell & Its Refitting For Cleaning Ofcalenderia Of Quad / Juice Heater. 83 Replacement Of Worn Out So2 Furnace Cooler Pipes With Dismantling & Erection Of Cover. 84 Replacement Of Side Plates / Bend Plates / Boxof Dsm Screen 85 Replacement Of Worn Out M.S. Channel Runner, Box Made Out From M.S. Plate And Chanell Etc For Rack Carrier & Bagasse Carrier Etc. 86 S.S. Lining Of Inter Rack Carrier Trough / Fibrizer Side Plates Or Any Other Part. 87 Replacement Of Worn Out Portion Of Rack Carrier / Bagasse Carrier Trough 88 Dismantling Of Old Gear & Erection Of New Planetary Gear Of Crystallizers. 89 Fabrication And Erection Of M.S. Grating For Plate Forms Made From M.S. Angle 25X25x6 Mm And M.S. Flat 25 X6 Mm. 90 Dismantling, Fabrication & Erection Of So2 Furnace Cooler Shell 91 Erection Of M.S. Plates 3Mm To Side Wall Of Boilers With Proper Strengthening With M.S. Angles. 92 Fabrication Of 6’’ M.S. Cross From Seamless Pipe 93 I ) Dismantling 94 Ii ) Fabrication 95 Iii ) Erection 96 Dismantling Fabrication & Erection Of Condensate Box Of Quad / Pan 97 Replacement Of Worn Out Steam Jacket Of Quad Body. 98 Replacement Of Weak Portion Ofpan Bottom Saucer. 99 Dismantling, Repair And Erection Of Pan Body Save All 100 I ) Dismantling 101 Ii ) Erection 102 Iii ) Repair 103 Iv ) Fabrication 104 Replacement Ofbottom Of Syrup Receiving Tank. 105 Dismantling, Fabrication And Errection Ofsteam Jacket Ofpan 106 Strenghting / Replacement / Repair Of Syrup Tank Bottom At Pan Floor. 107 Dismantling And Replacement Of Overhead Tank Bottom. 108 Dismantling And Replacement Of Sides Plates About 1 Meter Height Of Over Head Tank. 109 Replacement Of Worn Out Side Plates Of Fibrizer. 110 Fabrication Of Mill Roller Gear Guard. 111 Fabrication Ofmotor Pump Beds From M.S. Channel / Angles. 112 Replacement Ofj Pipe Ofquad / Pan / Evp. Body 113 Dismantling, Fabrication & Erection Of Heavy & Light Tank Vacuum Filter 114 Dismantling, Fabrication & Erection Of Vacuum Filter Tray 115 Dismantling, Fabrication & Erection Of Agitatorof Vacuum Filter 116 Replacement Of Side Plate Of Cane Carrier 117 Strengthning Of Mini Cooling Tower & Fabrication & Errection Of02 No. M.S. Tank. 118 Strengthning Of Both Molasses Storage Tank. 119 Replacement Of Fd Fan Damper. 120 Fabrication Of Cover Mill Bearing. 121 Fabrication & Erection Of Mill House Boot ( Donga ) 122 Dismantling , Fabrication & Erection Of Expansion Joint Of Economizer At Boiler. 123 Replacement Of Shaft & Arms Etc Ofcrystallizer. 124 Dismantling, Fabrication & Erection Of Transit Heater With Hydraulic Testing. 125 Replacement Gutter Any Station 126 Replacement Of Top Cone Of Syrup Sulphiter With Replacement Ofportion Of Its Shell. 127 Fixing Of M.S. Ring In The Bottom Of Pans To Strengthen The Bottom With Shell. 128 Replacement Of Worn Out Body Of Magma Mixture. 129 Dismantling, Fabrication & Erection Ofjuice Tank At Mill House. 130 Dismantling Of Syrup Receiving Tank For Boiling House 131 Fabrication Erection Of Motor Gear Box Of Main Rack Carrier For Double Drive Arrangement. 132 Fabrication Erection Of Motor Reduction Gear Box Extend Of Platform Of Double Drive Of Rbc. 133 Removal Of 3 Nos Sulphited Juice Receiving Tank Andfabrication Erection Of New Tank Of Approx Size ( 2.5Mtr Dia X3mtr Height ) . 134 Dismantling Fabrication Erection Of Syrup / B Heavy Tanks Approximate Size ( 2Mtr X 5Mtr X 3Mtr ) . 135 Patching Work At Any Vassele / Tanks Etc. 136 Fabrication And Erection Of Platform At Apposite Side Of Bagasse Carrier Existing Platform. 137 Replacement Of Wornout Arms Of Crystallizer. 138 Dismantling Fabrication Repair And Erection Of Sugar Melter As Per Existing Size. 139 Dismantling Fabrication And Erection Of Underground Filtrate Juice Tank At Oliver. ( Underground Tank Will Be Of S.S Material ) 140 Repairing And Strengthening Of Final Molasses Line Support Column. 141 Modification In Condensate Bottles Of Semikestnor And Vapor Cell With Connecting Pipe Line And Valves Etc. 142 Repairing Strengthening And Plastering ( Civil Work ) Of Boiling House Equipment Columns. 143 Replacement Of Worn Out Columns Of Vacuum Filter.