| 1 | Dismantling, fabrication and erection of M.S. plate job (tank,gutter, chute, pipe rolling& M.S. Structure plat farm) upto 12 mm thickness plate. |
| 2 | i) Dismantling |
| 3 | ii) Fabrication |
| 4 | iii) Erection |
| 5 | Dismantling, fabrication & erection of M.S., G.I. pipe line (1’’ to 12’’) |
| 6 | i)Dismantling |
| 7 | ii) Fabrication |
| 8 | ii) Erection |
| 9 | Dismantling, fabrication and erection of pipe accessories (bend,reducer,flanges,blind,nipple,Tee, etc.)(1’’ to 12’’) |
| 10 | i) Dismantling |
| 11 | ii) Fabrication |
| 12 | iii) Erection |
| 13 | Dismantling of valves/NRV |
| 14 | i) Upto 6” dia |
| 15 | ii) 7” dia to 12” dia |
| 16 | Erection of valves/NRV |
| 17 | i) Upto 6” dia |
| 18 | ii) 7” dia to 12” dia |
| 19 | Dismantling and erection of angle/Sluice/NRV valve 16” – 36” |
| 20 | i) Dismantling |
| 21 | ii) Erection |
| 22 | Dismantling, fabrication & erection ofhand railing |
| 23 | i)Dismantling |
| 24 | ii) Fabrication & Erection |
| 25 | Dismantling & erection of S.S. pipe. |
| 26 | i) Dismantling |
| 27 | ii) Erection |
| 28 | Dismantling & erection of Seamless pipe. |
| 29 | i) Dismantling |
| 30 | ii) Erection |
| 31 | Dismantling & erection of seem less pipes Accessories (bend, reducer blind nipple,Tee, Flange) |
| 32 | i) Dismantling |
| 33 | ii) Fabrication |
| 34 | iii) Erection |
| 35 | Dismantling, fabrication & erection ofM.S. pipe (12” dia to28’’ dia) |
| 36 | i) Dismantling |
| 37 | ii) Fabrication |
| 38 | iii) Erection |
| 39 | Dismantling fabrication erection pipe accessories (Bend, Reducer, Tee, Nipple, Flange Blind) 12” dia to 28’’ dia) |
| 40 | i) Dismantling |
| 41 | ii) Fabrication |
| 42 | iii) Erection |
| 43 | Dismantling fabrication erection pipe accessories (Bend, Reducer, Tee, Nipple, Flange Blind) 28” dia & above |
| 44 | i) Dismantling |
| 45 | ii) Fabrication |
| 46 | iii) Erection |
| 47 | Dismantling and erection ofvapour/Exhaust pipe |
| 48 | Dismantling/fabriction and erection ofvapour/Exhaust Pipe bend. |
| 49 | i) Dismantling |
| 50 | ii) Fabrication |
| 51 | iii) Erection |
| 52 | Dismantling, fabrication & erection of M.S. coil |
| 53 | i) Dismantling |
| 54 | ii) Fabrication |
| 55 | iii) Erection |
| 56 | Repair/replacement of worn out boiler ducting |
| 57 | Welding of pan shell from inside at the joint of shelland cone. |
| 58 | Dismantling fabrication, repair & erection of Semikestner/Vapour-cell save all |
| 59 | i) Dismantling |
| 60 | ii) Fabrication |
| 61 | iii) Erection |
| 62 | iv) Repair |
| 63 | Dismantling fabrication, repair & erection of quad body save all |
| 64 | i) Dismantling |
| 65 | ii) Fabrication |
| 66 | iii) Erection |
| 67 | iv) Repair |
| 68 | Dismantling fabrication and erection of pan umbrella made from 6 mm thick plate. |
| 69 | Dismantling fabrication and erection ofEvaporator Body umbrella. |
| 70 | Dismantling of old tubes & fitting of new SS tube of Juice heater with hydraulic testing. (Retubing of Body) |
| 71 | Dismantling of old tubes & fitting of new SS tubes of Quad body with Hydrolic testing (Retubing of Body) |
| 72 | Welding of exhaust/vapour joints. |
| 73 | Dismantling & fabrication and erection ofboiler Expansion joint. |
| 74 | Dismantling fabrication and erection of juice Sulphiter So2 coils |
| 75 | Dismantling fabrication & erection of So2furnace primary cooler |
| 76 | Dismantling/ fabrication and erection of after burner |
| 77 | Dismantling & refitting and expanding of air heater tubes and trial. |
| 78 | Dismantling fabrication and erection of down take of pan. |
| 79 | Cutting & refitting shell of Quad /Pan save -all for checking/cleaning. |
| 80 | Dismantling,fabrication & erection of juice sulphitor SO2 Box |
| 81 | Replacement of worn out perforated plates of Steam entry at quad bodies |
| 82 | Cutting ofportionof calenderia shell & its refitting for cleaning ofcalenderia of quad/juice heater. |
| 83 | Replacement of worn out SO2 furnace Cooler pipes with dismantling & erection of cover. |
| 84 | Replacement of side plates/bend plates/boxof DSM screen |
| 85 | Replacement of worn out M.S. channel runner, Box made out from M.S. Plate and Chanell etc for rack carrier & Bagasse carrier etc. |
| 86 | S.S. lining of inter rack carrier trough / Fibrizer side plates or any other part. |
| 87 | Replacement of worn out portion of rack carrier/bagasse Carrier trough |
| 88 | Dismantling of old gear & erection of new planetary gear of crystallizers. |
| 89 | Fabrication and erection of M.S. grating for plate forms made From M.S. angle 25x25x6 mm and M.S. flat 25 x6 mm. |
| 90 | Dismantling, fabrication & erection of SO2 furnace cooler shell |
| 91 | Erection of M.S. plates 3mm to side wall of boilers with proper strengthening with M.S. angles. |
| 92 | Fabrication of 6’’ M.S. cross from seamless pipe |
| 93 | i) Dismantling |
| 94 | ii) Fabrication |
| 95 | iii) Erection |
| 96 | Dismantling fabrication & erection of condensate box of quad /pan |
| 97 | Replacement of worn out steam jacket of Quad body. |
| 98 | Replacement of weak portion ofpan bottom saucer. |
| 99 | Dismantling, repair and erection of pan body save all |
| 100 | i) Dismantling |
| 101 | ii)Erection |
| 102 | iii) Repair |
| 103 | iv) Fabrication |
| 104 | Replacement ofbottom of syrup receiving tank. |
| 105 | Dismantling, fabrication and errection ofsteam jacket ofPan |
| 106 | Strenghting/ replacement / repair of syrup tank bottom at Pan floor. |
| 107 | Dismantling and replacement of overhead tank bottom. |
| 108 | Dismantling and replacement of sides plates about 1 meter height of over head tank. |
| 109 | Replacement of worn out side plates of fibrizer. |
| 110 | Fabrication of mill roller gear guard. |
| 111 | Fabrication ofmotor pump beds from M.S. channel/ Angles. |
| 112 | Replacement ofJ pipe ofQuad/ Pan/ Evp. Body |
| 113 | Dismantling, fabrication & erection of Heavy & Light tank Vacuum filter |
| 114 | Dismantling, fabrication & erection of Vacuum filter tray |
| 115 | Dismantling, fabrication & erection of Agitatorof vacuum filter |
| 116 | Replacement of side plate of cane carrier |
| 117 | Strengthning of mini cooling tower & fabrication & errection of02 no. M.S. Tank. |
| 118 | Strengthning of both molasses storage tank. |
| 119 | Replacement of FD fan damper. |
| 120 | Fabrication of cover mill bearing. |
| 121 | Fabrication & erection of Mill house Boot (Donga) |
| 122 | Dismantling ,fabrication & erection of expansion joint of economizer at boiler. |
| 123 | Replacement of shaft & arms etc ofCrystallizer. |
| 124 | Dismantling, fabrication & erection of transit heater with hydraulic testing. |
| 125 | Replacement gutter any station |
| 126 | Replacement of top cone of syrup sulphiter with replacement ofportion of its shell. |
| 127 | Fixing of M.S. ring in the bottom of pans to strengthen the bottom with shell. |
| 128 | Replacement of worn out body of magma mixture. |
| 129 | Dismantling, fabrication & erection ofJuice Tank at Mill house. |
| 130 | Dismantling of syrup receiving tank for Boiling House |
| 131 | Fabrication Erection of motor gear box of main rack carrier for double drive arrangement. |
| 132 | Fabrication Erection of motor reduction gear box extend of platform of double drive of RBC. |
| 133 | Removal of 3 Nos Sulphited Juice receiving tank andfabrication erection of new tank of approx size(2.5mtr dia x3mtr height). |
| 134 | Dismantling fabrication erection of syrup/B heavy tanks approximate size(2mtr x 5mtr x 3mtr). |
| 135 | Patching work at any vassele/tanks etc. |
| 136 | Fabrication and erection of platform at apposite side of bagasse carrier existing platform. |
| 137 | Replacement of wornout arms of crystallizer. |
| 138 | Dismantling fabrication repair and erection of Sugar melter as per existing size. |
| 139 | Dismantling fabrication and erection of underground Filtrate juice tank at Oliver. (Underground tank Will be of S.S material) |
| 140 | Repairing and Strengthening of final molasses line support column. |
| 141 | Modification in condensate bottles of semikestnor and Vapor cell with connecting pipe line and valves etc. |
| 142 | Repairing Strengthening and plastering (civil work) of Boiling house equipment columns. |
| 143 | Replacement of worn out columns of vacuum filter. |