| 1 | Excavation in soil (any type) using hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m, complete in all respects. |
| 2 | Rehandling of recently deposited earth work with a combined lead up to 30 mtrs, complete in all respects. |
| 3 | Plain Cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days, complete in all respects. |
| 4 | Laying Plain Cement Concrete Grade M-15 in open foundation complete as per drawing & technical specifications including vibrating the concrete in Flooring & Coping, complete in all respects. |
| 5 | Brick Masonary Work in 1:3 in Substructure complete excluding pointing & plastering as per drawing & technical specifications, complete in all respects. |
| 6 | Laying 20 mm thick cement plaster 1:4 in two coat work, complete in all respects |
| 7 | Providing and lowering in trench to correct gradient and alignment, jointing with tytone rubber joint and cutting of RCC S/S pipes having inside HDPE, lining ISI Marked as per ISI code IS 458:2003 into trenches for all depth and laying out the same to correct alignment, gradient, levels etc. cutting of concrete bed and joints holes, supporting the pipes and special in correct position in a suitable rigid manner while the same are being jointed and until the surrounding benchings, haunches and envelops are completed. the pipe shall rest on the beds at all joints through lengths and to ensure this, testing the pipe for leakage and making good the same leakage and all defects to the entire satisfaction of the engineer in charge including all cartage etc complete in all respects (RCC NP 3) 2400 mm dia. |
| 8 | Plain/ Reinforced cement concrete in sub-structure complete as per drawing and Technical specifications RCC Grade M20 Height upto 5 m, complete in all respects. |
| 9 | Cold Twisted deformed (Ribbed/Tor Steel ISI Marked) bars Fe-500 grade as per IS 1786-1985 for RCC works where not included in the complete rate of RCC including bending, binding & placing in position, complete in all respects. |
| 10 | Providing, running and maintenance of pumping set 8 H.P./Generator set for dewatering arrangements, complete in all respects. |
| 11 | Supply of Boulder Stone as per departmental specifications including carriage of material and lead upto 142 Km upto stack yard including Ist 2.0 Km river bed Katcha, interstate taxes, loading, unloading & stacking at site complete in all respects |
| 12 | Filling of Boulder Stone in wire crates of size 10\" x 8\" x 4\" complete, complete in all respects. |
| 13 | Weaving wire netting for wire crates including binding sides and partitions to make crates of 15 cm x 15 cm mesh complete in all respects |
| 14 | Providing and laying, jointing, fixing, testingISI Marked G.I. Pipe (as per IS 1239) B Class,including cost of Specials such astees, bends, sockets elbow etc., cutting,threading and testing in trenches in theground complete in all respects. (80 mm i/d) |
| 15 | Wall painting with plastic emulsion paint of approved brand and manufaturers to give an even shade (two or more coats), complete in all respects. |
| 16 | Dressing of Earthwork, complete in all respects. |
| 17 | Excavation in soil (any type) using hydraulic Excavator and hydraulictractor trolly and transporting to the embankement location with all lift and leads upto 2 Km ( for obstruction and diverting water) Complete in all respects |