E-Quotation For Seeking Firm Rates For Non-Schedule Items For Preparing Estimates. Repair And Replacement Of Plumbing Fixtures, Cleaning Of Toilet And Bathroom Of Inter Ward, Icu Ward, Staff Room, Female Ward, W.W. Ward, D.B. Ward, Duty Room, Main Office Building, A. Ward, Opd, Drug Store Etc. And Repairing Of Submersible Pump Set, , 10 Hp C / F Pump Set , Cost For Complete Rewinding Of 10 H.P Sq. Cage Induction Motor Operated On 415V, 3 Phase, 50 C / S 1460 Rpm With Supply Fitting Of Super Enameled Copper Wire And Other Required Insulation Materials, Heating Assembly Of The Motor And Testing On Load ( Wt Of Burnt Coil 5.5 Kg ) , Cost For Dismantling Of 10 H.P C / F Pump Checking And Changing Of Its Damaged Parts Such As Pump Shaft Of En-9 Materials -01 No. Key-02 Nos. Gland Tightner -2 Sets, Gland Tightner Stud-4 Nos. C.I Bearing Housing With Cap -2 Sets, Ball Bearing 6306 ( Skf ) -2 Nos. Casing Stud- 16 Mm Sq. X 80 Mm Long With Nut -8 Nos. Packing Paper. Grease, Gland Packing Etc All Complete And Testing On Load. , Cost For Supply And Fitting Of 3 Dia Tyre Coupling Complete Set With Nut, Bolt & Tyre. All Complete. , Cost For Supply And Fitting Of 4 Dia G.M Flap Tyre Foot Valve With Packing And Nut & Bolt -4 Nos. Etc All Complete. , Cost For Supply And Fitting Of 3 Dia Cidf Heavy Duty Sluice Valve, Isi Marked , Cost For Overhauling And Repairing Of Motor Control Panel And Changing Of Its Damaged Parts Such As Contactor ( Ml-4 ) - 3 Nos., Vm-02 Nos., Am-01, Selector Switch -2 Nos, 100 Amp Mccb – 1 No, Etc All Complete And Testing On Load. , 3 H.P. Submersible P / Set , Providing All Labour, Tools, Tackles And Technicians For Taking Out 3 H.P. Submersible Pump Set With Column Pipe For Bore Well , Cost Towards For Rewinding And Repairing Of 3 H.P Submersible Motor With S / F Suitable Winding Wire, Bronze Bush Etc. All Complete After The Deduction Of Cost Of Scrape Materials. , Cost Towards Repairing Of 3 H.P. Submersible Pump With S / F Bronze Impeller As Per Size And Sample, Bush, Thrust Plate, Pump Shaft Etc. All Complete After The Deduction Of Cost Of Scrape Materials. , Cost Towards Replacement Of Damaged Submersible Cable By Supplying And Fitting 2.5 Mm2x 3 Core Flat Submersible Cable Including Cable Jointing All Complete For Both Set. Jsor Cb 1-3 After The Deduction Of Cost Of Scrape Materials. , Cost Towards Supplying Fitting, Changing 2” Dia G.I. Column Pipe With Heavy Duty Socket ( Make Zindal / Tata ) Jsor 9K Vi After The Deduction Of Cost Of Scrape Materials. , Cost Towards Supplying And Fitting ( 1 ) 2 Dia G.M. Full Way Valve – 1 No ( 2 ) 2 Dia Nr Valve – 1 No ( 3 ) 2 Dia G.I. Bend 2 Nos. ( 4 ) 2” Dia M.S. Clamp With Nut Bolt 2 Pair After The Deduction Of Cost Of Scrape Materials. , Providing All Labour, Tools Tackles And Technicians For Lowering Of 3 H.P Submersible Pump Set With All Accessories In The Bore Well , Providing All Labour, Tools Tackles And Technicians For Lowering 3 H.P.Submersible Pump Set With All Accessories In The Bore Well , 5 H.P. / 7.5 H.P. Submersible P / Set , Providing All Labour, Tools, Tackles And Technicians For Taking Out 5 H.P. Submersible Pump Set With Column Pipe ( 280 ) From Bore Well , Cost Towards For Rewinding And Repairing Of5 Hp Submersible Motor With S / F 1.0 Swg Round Copper Winding Wire 24 Slot, Gun Metal Bush, Thrust Plate, Thrust Bearing, Diapharm, Oil Seal, Etc With Lathe Work. All Complete. After The Deduction Of Cost Of Scrape Materials. , Cost Towards Repairing Of 5 Hp Submersible Pump With S / F Noryl Impeller As Per Size And Sample, Diffuser, S.S. Shaft, S.S. Coupling, S.S. Sleeve, Nut, C.I Nrv Etc. All Complete ( 23 Stage ) After The Deduction Of Cost Of Scrape Materials. , Cost Towards Replacement Of Damaged Submersible Cable By Supplying And Fitting 4 Mm2x 3 Core Flat Submersible Cable Including Cable Jointing All Complete. After The Deduction Of Cost Of Scrape Materials. , Cost Towards Supplying Fitting, Changing 2” Dia G.I. Column Pipe With Heavy Duty Socket ( Make Zindal / Tata ) After The Deduction Of Cost Of Scrape Materials. , Cost Towards Supplying And Fitting ( 1 ) 50 Mm Dia G.M. Full Way Valve – 2 No ( 2 ) 50 Mm Dia Nr Valve – 1 No ( 3 ) 50 Mm Dia G.I. Bend ( 4 ) 2” Dia M.S. Clamp With Nut Bolt – 2 Pair After The Deduction Of Cost Of Scrape Materials. , Supplying And Laying Ground And On Wall 10 Swg, G.I. Wire For Doing Continuous Earthing For All Electrical Equipments , Providing All Labour, Tools Tackles And Technicians For Lowering ( 280 ) Of 5 H.P.Submersible Pump Set With All Accessories In The Bore Well , Supplying And Installation Suitable Size Panel Board For 5 H.P. Submersible Pump Including Fixing On Wall Comparising Of Following Points Such As ( 1 ) D.O.L Starter – 1 No. ( 2 ) Hrc Fuse – 3 No. ( 3 ) Volt Meter With Selector Witch -1 Set ( 4 ) Ammeter With Selection Switch – 1 Set ( 5 ) Zindicating Neon Lamp – 3 No. Etc. All Complete After The Deduction Of Cost Of Scrape Materials. , Supplying Of Plumber & Sweeper For Engaged To Maintenance Of Water Supply, Cleaning Of Toilet And Bathroom, Sewer Line Etc. Operating Of Pump, F.W.V Fro Interrupted Water Supply Etc. All Complete As Per Direction Of E / I. ( Including Contractor Profit ) . Period From 01.04.2022 To 31.03.2023 ( I ) ( Plumber ) 12 Month X 26 Days X 1 Nos. = 312 Nos. , ( Ii ) Sweeper 12 Month X 26 Days X 1 Nos. = 312 Nos. , Provision Leake Repairing Of Different And Size Of Upvc Sch- 80 Pipe In Place Of Existing / Cracked And Damaged Pipe Of Isi Approved Make Or Equivalent Make Damaged Pipe In Trenchage And Replacement Of Pipe And Fitting So As To Give. I M Average Cover Over The Socket Of Pipes With Disposal Of Excavated Earth Within Initial Lead And Lift And Necessary Fitting And Earth Work In Backfilling And Cutting Pipe To Size Etc. All Complete As Per Specification And Direction Of E / I. Leakage In 50 Mm Dia Upvc Pipe , Leakage In 40 Mm Dia Upvc Pipe , Leakage In 32 Mm Dia Upvc Pipe , Leakage In 25 Mm Dia Upvc Pipe , Leakage In 20 Mm Dia Upvc Pipe , Provision Leake Repairing Of Different And Size Of Upvc Sch- 80 Pipe In Place Of Existing / Cracked And Damaged Pipe With Red Lead And Yarn Of Following Nominal Bore Screwed And Socketed Joints On Wall, Ceiling And Floor Including Supplying And Fitting On Wall Hooks Or Pipe Clamp Wooden Plugs, Cutting Pipe To Size And Threading Ends Where Necessary Etc. All Complete As Per Specification And Direction Of E / I. Leakage In 50 Mm Dia Upvc Pipe , Leakage In 40 Mm Dia Upvc Pipe , Leakage In 32 Mm Dia Upvc Pipe , Leakage In 25 Mm Dia Upvc Pipe , Leakage In 20 Mm Dia Upvc Pipe , Supplying And Flaxing U-Pvc Ball Valve Of Approved Make All Complete As Per Direction Of E / I. 50 Mm Dia U-Pvc Ball Valve , 40 Mm Dia U-Pvc Ball Valve , 32 Mm Dia U-Pvc Ball Valve , 25 Mm Dia U-Pvc Ball Valve , 20 Mm Dia U-Pvc Ball Valve , Supplying Of Material For Consumption To Day To Day Works Direction Of E / I. ( A ) Hydrochloric Acid ( 500 Ml ) , ( B ) Bleaching Powder ( 25 Kg Bag ) , ( C ) Phenyl Liquid ( 1 Ltr. ) , ( D ) Harpic Liquid ( 1 Ltr. ) , ( E ) Surf ( 1 Kg ) , ( F ) Nariyal Broom , ( G ) Pochha Broom , ( H ) Safi , ( I ) Dettol ( 500Ml ) , ( J ) Phenyl Goli ( Pkt ) , ( K ) Odonil , ( L ) Room Freshner , ( M ) Phooll Broom , ( N ) Lizol ( 500 Ml ) , ( O ) Plastic Bucket ( 10 L ) , ( P ) Plastic Mug ( 1 L ) , Supplying Of Materials For C.P. Bathroom Fitting ( As Per Schedule Rate ) To Consumrtion Day To Day Work. 15Mm Dia C.P. Bib Cock ( Long Thread ) , 15Mm Dia C.P. Pillar Cock ( Long Thread ) , 15Mm Dia C.P. Angular Stop Cock ( Long Thread ) , 15Mm Dia Cp Basin Mixture , 15Mm Dia Cp Wall Mixture , Jet Sprey , Health Faucet , Bib Cock Spindle , A ) Medium Size , B ) Large Size , Mirror , Towel Rail , Soap Dish , 32Mm Dia Cp Waste :- , 32Mm Dia Pvc Waste Pipe 750Mm Long With Coupling :- , 100Mm Dia C.P. Jali :- , 15Mm Dia And 45Cm Long Pvc Connection Pipe :- , Sink Waste , Cistern Ball Cock , Cistern Handle , Pvc Water Storage Tank Cover ( 2000 / 1000 L ) , 25Mm Dia Ball Cock Set For Pvc Tank , Cammod Cover , M Seal , Waste Pipe Bundla , 10 Lit Pvc L / D Cistern , Flush Bend , Basin , Supplying All Materials, Labours, Tools And Equipment For The Fitting And Fixing Cp Bathroom Fittings In Vip Fittings Including All Accessories Etc. All Complete As Per Specification And Direction Of E / I. A ) Sink Mixture Flr5309n Jaquar , B ) Wall Mixture 3-In-1 With Wall Flange Flr5281n Jaquar , C ) Central Hole Basin Mixture With Popup Waste System 450Mm Long Braided Houses ( Con-169Knb ) Jaquar , D ) Pillar Cock Flr5011n Jaquar , E ) Bib Cock With Flange Flr – 5053N Jaquar , F ) Cp Bib Cock 2 In 1 Angular Stop Cock Flr 5041N Jaquar , G ) Angular Stop Cock With Flange Flr 5053N Jaquar , H ) Health Faucet Ald 577 Jaquar , I ) Over Head Shower With Arm Ohs 1999 Jaquar , J ) Glass Shelf 22 ( Aqn-7771 ) Jaquar , K ) Towel Rail ( Akp-35711Ps ) Jaquar , L ) Towel Ring ( Akp-35721P ) Jaquar , M ) Soap Dish Holder Akp 35731P Jaquar , N ) Cp Liquid Soap Dispenser With Mettalic Bottle Acn1137n Jaquar , Supplying, Fitting And Fixing Pvc Pipes Of Approved Make Including Supplying Nails, Clips And Pvc Washer Cement & Yarn For Making Plumber Joints Properly Cutting Pipe To Sizes Including Earth Work Of Scaffolding Etc. Where Necessary Etc. All Complete As Per Specification And Direction Of E / I. 100Mm Dia Pvc Sewer Pipe - , 75Mm Dia Pvc Sewer Pipe , Supplying And Fixing Pvc Fitting Of Approved Make Confirming To Isi Including Supplying Nails And Bobbins From Making Solvent Cement Solution Or Gasket Joints Including Earth Work Or Providing Scaffolding As The Case May Be All Complete As Per Specification And Direction Of E / I. 110Mm Swr Nahani Trap - , 110Mm Swr Plain Bend - , 110Mm Swr Door Bend , 110Mm Swr Plain Tee - , 110Mm Swr Door Tee , 75Mm Swr Plain Bend - , 75Mm Swr Door Bend - , 75Mm Swr Plain Tee - , 75Mm Swr Door Tee - , Providing All Material, Equipment And Wash Out And Cleaning Of 2000 / 1000 Litre Pvc Water Storage Tank Including Rubbing The Wall Of Tank By The Help Of Coconut, Rushi And Bleaching Powder Their Washing By Clean Water All Complete As Per Direction Of E / I. 3000 Litre Capacity Hdpe W / S / Tank 2 Time X 3000 Liter X 2 Nos. = 12000.00 Liter 2000 Litre Capacity Hdpe W / S / Tank 2 Time X 2000 Liter X 88 Nos. = 372000.00 Liter 1000 Litre Capacity Hdpe W / S / Tank 2 Time X 1000 Liter X 9 Nos. = 18000.00 Liter Total = 402000.00 Liter