|
| 1 | Excavation in trenches not exc 1.50 m wide and not exc 1.50 m deep for foundation, laying of pipe or for shafts, wells cesspits,man holes etc not exc 10 Sqm on plan and n exc 1.5m in depth and getting out in soft / loose soil complete all as specified and as directed. |
| 2 | Returning, filling, inincluding spreading, levelling, watering and well ramming in layers n.exc. 25cm thick complete all as specified and as directed. |
| 3 | Removing excavated soil to distance not exc. 50 m and depositing where directed at a level not exc. 1.5 m above the starting point etc complete all as specified and as directed. |
| 4 | Taking up or down, steel water tubing, 100 mm bore from trenches/wall,ceiling or floors including all fittings complete all as specified and as directed. |
| 5 | Taking up or down, steel water tubing, 80 mm bore from trenches/wall,ceiling or floors including all fittings complete all as specified and as directed. |
| 6 | Taking up or down, steel water tubing, 50 mm bore from trenches/wall,ceiling or floors including all fittings complete all as specified and as directed. |
| 7 | Taking up or down, steel water tubing, 40 mm bore from trenches/wall,ceiling or floors including all fittings complete all as specified and as directed. |
| 8 | Taking up or down, steel water tubing, 25 mm bore from trenches/wall,ceiling or floors including all fittings complete all as specified and as directed. |
| 9 | Taking up or down, steel water tubing, 20 mm bore from trenches/wall,ceiling or floors including all fittings complete all as specified and as directed. |
| 10 | S & F GI tubing 100 mm bore, medium grade with all fittings, laid in trenches complete all as specified and as directed. |
| 11 | S & F GI tubing 80 mm bore, medium grade with all fittings, laid in trenches complete all as specified and as directed. |
| 12 | S & F GI tubing 50 mm bore, medium grade with all fittings, laid in trenches complete all as specified and as directed. |
| 13 | S & F GI tubing 40 mm bore, medium grade with all fittings, laid in trenches complete all as specified and as directed. |
| 14 | S & F GI tubing 25 mm bore, medium grade with all fittings, laid in trenches complete all as specified and as directed. |
| 15 | S & F GI tubing 20 mm bore, medium grade with all fittings, laid in trenches complete all as specified and as directed. |
| 16 | Relaying old serviceable 100 mm bore steel tubingand connections as obtained from taking down including provision of new fittings, in new or old position laid in trenches after cleaning by suitable chemical complete all as specified and as directed. |
| 17 | Relaying old serviceable 80 mm bore steel tubingand connections as obtained from taking down including provision of new fittings, in new or old position laid in trenches after cleaning by suitable chemical complete all as specified and as directed. |
| 18 | Relaying old serviceable 50 mm bore steel tubingand connections as obtained from taking down including provision of new fittings, in new or old position laid in trenches after cleaning by suitable chemical complete all as specified and as directed. |
| 19 | Relaying old serviceable 40 mm bore steel tubingand connections as obtained from taking down including provision of new fittings, in new or old position laid in trenches after cleaning by suitable chemical complete all as specified and as directed. |
| 20 | Relaying old serviceable 25 mm bore steel tubingand connections as obtained from taking down including provision of new fittings, in new or old position laid in trenches after cleaning by suitable chemical complete all as specified and as directed. |
| 21 | Relaying old serviceable 20 mm bore steel tubingand connections as obtained from taking down including provision of new fittings, in new or old position laid in trenches after cleaning by suitable chemical complete all as specified and as directed. |
| 22 | Taking up 150mm bore CI/DI water main including all fittings with any type of joint from trenches complete all as specified and as directed. |
| 23 | Taking up 80mm bore CI/DI water main including all fittings with any type of joint from trenches complete all as specified and as directed. |
| 24 | Supply, laying, testing 150mm cast iron pipes with spigot and socket end centrifugally cast conforming to IS 1536 : 1989 Class A,in any length,laid in trenches including making good disturbed surfaces of road /pavement/PCC surface as required complete all as specified and as directed. |
| 25 | Relaying old serviceable 150mm bore cast/ductileiron pipesand connections as obtained from taking down including provision of new/oldfittings,in new or old position laid in trenches after cleaning by suitable chemical complete all as specified and as directed.Note : New fittings shall be measured and paid separately. |
| 26 | Supply, laying, testing 80mm cast iron pipes with spigot and socket end centrifugally cast conforming to IS 1536 : 1989 Class A,in any length,laid in trenches including making good disturbed surfaces of road /pavement/PCC surface as required complete all as specified and as directed. |
| 27 | Relaying old serviceable 80mm bore cast/ductileiron pipesand connections as obtained from taking down including provision of new/oldfittings,in new or old position laid in trenches after cleaning by suitable chemical complete all as specified and as directed.Note : New fittings shall be measured and paid separately. |
| 28 | M & L for run lead joint for 100mm bore cast ironpipe complete all as specified and as directed. |
| 29 | M & L for run lead joint for 80mm bore cast ironpipe complete all as specified and as directed. |
| 30 | M & L for Cast iron fittings for spigot and socket pipes of size upto 150mm boresuch as bends(any type,radius and angle) tapers any type (straight, bend, increasing,decreasing or double socket, etc), Tee pieces single branch, \"Y\"junction, double branch, cross(all sockets or socket and spigot), collars caps and plugs complete all as specified and as directed. |
| 31 | Cutting CI/DI pipes of 150 mm bore and reducing to required length before laying, in position for insertion of new tees, branches, etc complete all as specified and as directed. |
| 32 | Cutting CI/DI pipes of 100 mm/80mmbore and reducing to required length before laying, in position for insertion of new tees, branches, etc complete all as specified and as directed. |
| 33 | S & F in repairs, 50mm bore, gun metal, globe or gate valves, with iron wheel head, screwed both ends for iron pipe or for union complete all as specified and directed. |
| 34 | S & F in repairs, 25mm bore, gun metal, globe or gate valves, with iron wheel head, screwed both ends for iron pipe or for union complete all as specified and directed. |
| 35 | S & F in repairs, 20mm bore, gun metal, globe or gate valves, with iron wheel head, screwed both ends for iron pipe or for union complete all as specified and directed. |
| 36 | S&F in repairs, sluice valve (heavy duty) with stainless steel spindle heavy duty conforming to IS 14846 (2000) both end flanged class PN 1.6 of size 150 mm dia including necessary nuts,bolts washers and gasket complete all as specified and as directed. |
| 37 | S&F in repairs, sluice valve (heavy duty) with stainless steel spindle heavy duty conforming to IS 14846 (2000) both end flanged class PN 1.6 of size 100 mm dia including necessary nuts,bolts washers and gasket complete all as specified and as directed. |
| 38 | S&F in repairs, sluice valve (heavy duty) with stainless steel spindle heavy duty conforming to IS 14846 (2000) both end flanged class PN 1.6 of size 80 mm dia including necessary nuts,bolts washers and gasket complete all as specified and as directed. |