| 1 | (Supply Part ) of 11 KV HT Line |
| 2 | Prov.RCC Muff with concrete filling |
| 3 | Prov. Cross Arm: (Channel Iron(100x50x6 mm), Length (1070) mm for Single Pole Str. |
| 4 | Prov.Knee bracing of Angle Iron (50x50x6mm), Length (2x750) mm for Single Pole Str. |
| 5 | Prov.Pole Top Bracket |
| 6 | Prov.11 KV Pin Insulators (Porcelain,12 KV.10 KN) for Single Pole |
| 7 | Prov.Belt Set-M.S Angle Iron: 50x50x6,Length (1500 mm 2 No) for X-bracing |
| 8 | Prov.X-Bracing Set-M.S Angle Iron: 50x50x6, Length (2700 mmx2 No) |
| 9 | Prov. X-Arm (Horizental)- M.S Channel Iron: 100x50x6, Length (2400) mm x2 No) |
| 10 | Prov.Disc.Insulator Sets on Dead End Structure (Comprising 1 No Disc.(Porcelain,BS, 12 KV,90 KN) including Dead End Clamp etc) x (3 No.Conductors) x ( 2 No.Sides) |
| 11 | Prov.11 KV Pin Insulators (Porcelain,12 KV.10 KN) for double pole Str. |
| 12 | Prov.H.T.Stay Set Complete in all respects |
| 13 | Prov.Stay Wire (7/3.15 mm) (6.0 Kg Per Stay Set) |
| 14 | Prov.H.T.Earthing Set Complete |
| 15 | Prov.Single Continous Earth Wire ( G.I. 8 SWG) |
| 16 | Prov, Eye hook for earth wire |
| 17 | Prov.Earth Wire Clamp |
| 18 | Prov. Half clamp. |
| 19 | Prov.Full clamp clamp. |
| 20 | Prov.Danger Plate (250x200x1.6 mm) |
| 21 | Prov.Nuts & Bolts of various Sizes(Galvanised)/Coated) 16 mm F or more ( With flat and spring washer) |
| 22 | Prov.Barbed Wire |
| 23 | Prov.Alluminium Paint |
| 24 | Prov..X-Arm (Channel Iron (100x50X6 mm),Length 2800 mm x 2 Nos for Top at Tapping |
| 25 | Prov..X-Arm (Channel Iron (75x40X6 mm),Length 2800 mm x 4 Nos for Top at Tapping for G.O. Switch & D.O.Fuse |
| 26 | Prov.G.O.Switch Unit (11 KV,400 A,25 KA) |
| 27 | Prov.D.O.Fuse |
| 28 | Transportation & Manual Carriage of ST Pole 9 Mtr.long, RCC Muffs, X-Arm, X-Bracing Set, X-Belt Set ,HT Stay sets, GO Switch, DO Fuse Unit , Conductor , GI Wire & other misc. Complete fittings etc.(Av. Lead 1.0X0.242X46736=11310) |
| 29 | (Erection Part ) of 11 KV HT Line |
| 30 | Erection of ST Pole 9. 00 Mtr. Long(Double pole structure) with RCC Muffs including Digging of Pit,drilling of Holes inpoles,X- Bracing set, X-Arm,Fixing of pin/disc Insulators,X-Arm,X-Bracing Set,Fixing of barbed wire danger plate, filling of pit+ramming, painting of pole , fixing of nuts-bolts ,half/full clamps etc. complete in all respects. |
| 31 | Erection of ST Pole 9.00 Mtr. Long (Single pole structure) with RCC Muffs including Digging of Pit,drilling of Holes inpoles, X-Arm,Fixing of pin/disc Insulators,X-Arm, Knee Bracing set, Top clamp, Fixing of barbed wire danger plate, filling of pit+ramming, painting of pole , fixing of nuts-bolts ,half/full clamps etc. complete in all respects. |
| 32 | Erection of HT Stay sets comprising ofDigging of pit,fixing of stay rod,filling of pit,Nozzeling and tighting etc.complete in all respect |
| 33 | Erection of Earthingcomprising ofDigging of pit,Fixing of GI wire to earthSystem ,eye hook & filling of pit etc. complete in all respects. |
| 34 | Erection of GO Switch complete in all respects . |
| 35 | Erection of DO Fuse Unit complete in all respects . |
| 36 | Laying, stringing, sagging & bindingof AAAC Cond.7/4.26 mm complete in all respects |
| 37 | Laying, stringing, sagging & bindingof GI Wire6 SWG complete in all respects. |
| 38 | (Supply Part ) of Reconductoring of 11 KV HT Line |
| 39 | Prov.RCC Muff with concrete filling |
| 40 | Prov. Cross Arm: (Channel Iron(100x50x6 mm), Length (1070) mm for Single Pole Str. |
| 41 | Prov.Knee bracing of Angle Iron (50x50x6mm), Length (2x750) mm for Single Pole Str. |
| 42 | Prov.Pole Top Bracket |
| 43 | Prov.11 KV Pin Insulators (Porcelain,12 KV.10 KN) for Single Pole |
| 44 | Prov.Belt Set-M.S Angle Iron: 50x50x6,Length (1500 mm 2 No) for X-bracing |
| 45 | Prov.X-Bracing Set-M.S Angle Iron: 50x50x6, Length (2125 mmx2 No) |
| 46 | Prov. X-Arm (Horizental)- M.S Channel Iron: 100x50x6, Length (2140) mm x2 No) |
| 47 | Prov.Disc.Insulator Sets on Dead End Structure (Comprising 1 No Disc.(Porcelain,BS, 12 KV,90 KN) including Dead End Clamp etc) x (3 No.Conductors) x ( 2 No.Sides) |
| 48 | Prov.11 KV Pin Insulators (Porcelain,12 KV.10 KN) for double pole Str. |
| 49 | Prov.H.T.Stay Set Complete in all respects |
| 50 | Prov.Stay Wire (7/3.15 mm) (6.0 Kg Per Stay Set) |
| 51 | Prov.H.T.Earthing Set Complete |
| 52 | Prov, Eye hook for earth wire |
| 53 | Prov.Earth Wire Clamp |
| 54 | Prov. Half clamp. |
| 55 | Prov.Full clamp clamp. |
| 56 | Prov.Danger Plate (250x200x1.6 mm) |
| 57 | Prov.Nuts & Bolts of various Sizes(Galvanised)/Coated) 16 mm F or more ( With flat and spring washer) |
| 58 | Prov.Barbed Wire |
| 59 | Prov.Alluminium Paint |
| 60 | Prov..Dead End clamp AAAC 7/4.26 mm |
| 61 | Add Transporation Chargesnew & dismantled material. |
| 62 | Manual carriage of new material , dismantled conductor site of work to road head, ST Pole 9 Mtr.long, RCC Muffs, X-Arm, X-Bracing Set, X-Belt Set ,HT Stay sets, GO Switch, DO Fuse Unit , Conductor , GI Wire & other misc. Complete fittings etc.(As per estimate) |
| 63 | (Erection Part ) Re-conductoring of 11 KV H.T.Line |
| 64 | Erection of ST Pole 9. 00 Mtr. Long(Double pole structure) with RCC Muffs including Digging of Pit,drilling of Holes inpoles,X- Bracing set, X-Arm,Fixing of pin/disc Insulators,X-Arm,X-Bracing Set,Fixing of barbed wire danger plate, filling of pit+ramming, painting of pole , fixing of nuts-bolts ,half/full clamps etc. complete in all respects. |
| 65 | Erection of ST Pole 9.00 Mtr. Long (Single pole structure) with RCC Muffs including Digging of Pit,drilling of Holes inpoles, X-Arm,Fixing of pin/disc Insulators,X-Arm, Knee Bracing set, Top clamp, Fixing of barbed wire danger plate, filling of pit+ramming, painting of pole , fixing of nuts-bolts ,half/full clamps etc. complete in all respects. |
| 66 | Erection of HT Stay sets comprising ofDigging of pit,fixing of stay rod,filling of pit,Nozzeling and tighting etc.complete in all respect |
| 67 | Erection of Earthingcomprising ofDigging of pit,Fixing of GI wire to earthSystem ,eye hook & filling of pit etc. complete in all respects. |
| 68 | Dismantling of ACSR 6/1/2.11 mm conductor.complete in all respects |
| 69 | Laying, stringing, sagging & bindingof AAAC Cond.7/4.26 mm complete in all respects |
| 70 | (Supply Part ) 400 kVA DTR |
| 71 | Prov.Distribution Transformer (Ordinary) 11/0.4KV, 400 KVA |
| 72 | Prov.R.C.C.Muff with Concrete filling |
| 73 | Prov.X-Arm (Channel Iron (100x50x6 mm),Length:2800 mmx 2 Nos) |
| 74 | Prov.X-Arm (Channel Iron (75x40x6 mm),Length:2800 mmx 4 Nos) for Supporting D.O.fuse Unit & G.O.Switch |
| 75 | Prov.M.S Angle Iron (50x50x6 mm),Length:2800 mmx( 1 Nos for LA\"s) |
| 76 | Prov.G.O. AB Switch Unit (11 KV,400 A,25 KA)complete in all respect |
| 77 | Prov.D.O.Fuse Unit complete in all respect |
| 78 | Prov.Surge Arrestor, 9 KV Station Class (Porcelain Type) |
| 79 | Prov.Disc.Insulator Sets (Comprising 1 No Disc. (Porcelain, BS, 12 KV ,90 KN) including Dead End Clamps etc.) |
| 80 | Prov.Stay Set Complete |
| 81 | Prov.Stay Wire (7/3.15 mm) (6.0 Kg Per Stay Set) |
| 82 | Prov.Pipe Earthing Set |
| 83 | Prov.L.T.Distribution Panel Box With ACB (630A, 50 kA, 4 P 1 No) and SFU (100 A, 8 No., rewirable) |
| 84 | Prov.Half Clamp ( M.S Flat 50x6 mm) |
| 85 | Prov.Nuts & Bolts of various Sizes(Galvanised)/Coated) 16 mm F or more ( With flat and spring washer) |
| 86 | Prov.Alluminium Thimble |
| 87 | Prov.Alluminium Thimble |
| 88 | Prov.Danger Plate |
| 89 | Prov.Alluminium Paint |
| 90 | Add Transporation Charges |
| 91 | (Erection Part ) 400 kVA Distribution Transformer |
| 92 | Digging of pit forpole & Earthing ( 2 Nos for Poles & 3 Nos for Earth) , Drilling of holes in X arm , Preparation of plate form str. Member CI, AI, i.e X arm and Knee Bracing set. Erection of Double structure , Concreting of RCC Muff, Erection ofplate form, Erection of X-Arm, Drop out, Lightening Arrestors, MCCB, Switch L.T.Box, Energy Meter ,Erection of 400 kVA Transformer, Providing earthing to G.O.Switch, Transformer Lightening Arrestor , Erection of two No staysets. Erection of Jumpers, Erection of L.T.Cable and Fixing of barbed wire and painting. Complete in all respect as directed by the Engineer-In-Charge including all types of risk & incedental at site. |
| 93 | (Supply Part ) CT/PT METERING UNIT |
| 94 | Prov. PVC multistrand 4 mm2 copper wire with 1 inch GI pipe for concealing. |
| 95 | Prov. RCC muff with muffing |
| 96 | Prov. C.I. X-Arms (100x50x6 mm) length 2800 mm x 4 Nos. |
| 97 | Prov. C.I. X-Arms (75x40x6 mm) length 2800 mm x 4 Nos. for supporting of DO fuse unit & GO switch. |
| 98 | Prov. C.I. X-Arms 460x100x50x6 mm for supporting of main channel of CT/PT unit.(2 Nos.) |
| 99 | Prov.M.S Angle Iron (50x50x5 mm),Length:2800 mmx(2 Nos for LA\"s) |
| 100 | CT-PT Unit belting & Knee bracing. |
| 101 | Prov.M.S Angle Iron (50x50x6 mm),Length:2800 mm x 4 Nos |
| 102 | Prov.M.S Angle Iron (50x50x6 mm),Length:460 mm x 2 Nos |
| 103 | Prov.G.O. AB Switch Unit (11 KV,400 A,25 KA) |
| 104 | Prov.D.O.Fuse Unit |
| 105 | Prov.Surge Arrestor, 9 KV Station Class (Porcelain Type) |
| 106 | Prov.Disc.Insulator Sets (Comprising 1 No Disc. (Porcelain, BS, 12 KV ,90 KN) including Dead End Clamps etc.) |
| 107 | Prov.Stay Set Complete |
| 108 | Prov.Stay Wire (7/3.15 mm) (6.0 Kg Per Stay Set) |
| 109 | Prov.Pipe Earthing Set |
| 110 | Prov.Half Clamp ( M.S Flat 50x6 mm) |
| 111 | Prov.Full Clamp ( M.S Flat 50x6 mm) |
| 112 | Prov.Nuts & Bolts of various Sizes(Galvanised)/Coated) 16 mm F or more ( With flat and spring washer) |
| 113 | Prov.Alluminium Thimble |
| 114 | Prov.Alluminium Thimble |
| 115 | Prov.Danger Plate |
| 116 | Prov.Barbed Wire |
| 117 | Prov. XLPE cable (3 core) 95 mm2 |
| 118 | Prov. Cable termination kit complete |
| 119 | Prov. Alluminium Paint |
| 120 | Add Transporation Charges |
| 121 | (ErectionPart ) CT/PT METERING UNIT |
| 122 | Digging of pit forpole & Earthing ( 2 Nos for Poles & 2 Nos for Earth) , Drilling of holes in X arm , Preparation of plate form str. Member CI, AI, i.e X arm and Knee Bracing set. Erection of Double structure , Concreting of RCC Muff, Erection ofplate form, Erection of X-Arm, Drop out, Lightening Arrestors, Erection of CT/PT combined unit, Energy Meter, Providing earthing to G.O.Switch,CT/PT unit Lightening Arrestor, Erection of two No staysets. sagging of conductor, Erection of Jumpers, and Fixing of barbed wire and painting. Complete in all respect as directed by the Engineer-In-Charge including all types of risk & incedental at site. |