The Work Of Under Ground 33 Kv And 11 Kv Cable Fault Locator And 60 Fault 33 Kv And 135 Fault 11 Kv Under Edd-I / Ii / Iii Loni.- 1 Providing & Fixingstraight Through Joint Of 33 Kv Cable Of Verious Size. Safe Isolation Of 33 Kv Cable, Unfastening Of Cable Joints As Required, Testing Of Cable Section Wise To Detect Fault, Pin Pointing Of Fault, Lowering Of Cable As Required The Work Also Included Digging Of Earth Pit Of Sufficent Size And Depth To Accommodate Preparation Of Stragiht Throughjoint And Filling Earth Pit. Preparation Of Joint By Cutting Of Cable, Heat Shrinking Of Sleeves & Resistance Testing Of Prepared Joint And Reconnection Of Repaired Cable As Required.All Necessary Work For Proper Completion Of Work Has To Carried Out By The Agency. 2 Fixingstraight Through Joint Of 33 Kv Cable Of Verious Size. Safe Isolation Of 33 Kv Cable, Unfastening Of Cable Joints As Required, Testing Of Cable Section Wise To Detect Fault, Pin Pointing Of Fault, Lowering Of Cable As Required The Work Also Included Digging Of Earth Pit Of Sufficent Size And Depth To Accommodate Preparation Of Stragiht Throughjoint And Filling Earth Pit. Preparation Of Joint By Cutting Of Cable, Heat Shrinking Of Sleeves & Resistance Testing Of Prepared Joint And Reconnection Of Repaired Cable As Required. All Necessary Work For Proper Completion Of Work Has To Carried Out By The Agency. 3 Providing & Fixing Of Indoor / Outdoor Cable Box And 33 Kv Cable Of Verious Size. Safe Isolation Of 33 Kv Cable, Unfastening Of Cable Joints As Required, Testing Of Cable Section Wise To Detect Fault, Pin Pointing Of Fault, Lowering Of Cable As Required Preparation Of Joint By Cutting Of Cable, Heat Shrinking Of Sleeves & Resistance Testing Of Prepared Joint Of Work Also Included Reconnection Of Repaired Cable As Required. All Necessary Work For Proper Completion Of Work Has To Carried Out By The Agency. 4 Fixing Ofindoor / Outdoor Cable Box And 33 Kv Cable Of Verious Size. Safe Isolation Of 33 Kv Cable, Unfastening Of Cable Joints As Required, Testing Of Cable Section Wise To Detect Fault, Pin Pointing Of Fault, Lowering Of Cable As Required Preparation Of Joint By Cutting Of Cable, Heat Shrinking Of Sleeves & Resistance Testing Of Prepared Joint Of Work Also Included Reconnection Of Repaired Cable As Required. All Necessary Work For Proper Completion Of Work Has To Carried Out By The Agency. 5 Providing & Fixingstraight Throughjoint Of 11 Kv Cable Of Verious Size. Safe Isolation Of 11 Kv Cable, Unfastening Of Cable Joints As Required, Testing Of Cable Section Wise To Detect Fault, Pin Pointing Of Fault, Lowering Of Cable As Required The Work Also Included Digging Of Earth Pit Of Sufficent Size And Depth To Accommodate Preparation Of Stragiht Through Joint And Filling Earth Pit. Preparation Of Joint By Cutting Of Cable, Heat Shrinking Of Sleeves & Resistance Testing Of Prepared Joint And Reconnection Of Repaired Cable As Required. All Necessary Work For Proper Completion Of Work Has To Carried Out By The Agency. 6 Fixingstraight Throughjoint Of 11 Kv Cable Of Verious Size. Safe Isolation Of 11 Kv Cable, Unfastening Of Cable Joints As Required, Testing Of Cable Section Wise To Detect Fault, Pin Pointing Of Fault, Lowering Of Cable As Required The Work Also Included Digging Of Earth Pit Of Sufficent Size And Depth To Accommodate Preparation Of Stragiht Throughjoint And Filling Earth Pit. Preparation Of Joint By Cutting Of Cable, Heat Shrinking Of Sleeves & Resistance Testing Of Prepared Joint And Reconnection Of Repaired Cable As Required. All Necessary Work For Proper Completion Of Work Has To Carried Out By The Agency. 7 Providing & Fixing Of Indoor / Outdoor Cable Box And 11 Kv Cable Of Verious Size. Safe Isolation Of 11 Kv Cable, Unfastening Of Cable Joints As Required, Testing Of Cable Section Wise To Detect Fault, Pin Pointing Of Fault, Lowering Of Cable As Required Preparation Of Joint By Cutting Of Cable, Heat Shrinking Of Sleeves & Resistance Testing Of Prepared Joint Of Work Also Included Reconnection Of Repaired Cable As Required. All Necessary Work For Proper Completion Of Work Has To Carried Out By The Agency. 8 Fixing Of Indoor / Outdoor Cable Box And 11 Kv Cable Of Verious Size. Safe Isolation Of 11 Kv Cable, Unfastening Of Cable Joints As Required, Testing Of Cable Section Wise To Detect Fault, Pin Pointing Of Fault, Lowering Of Cable As Required Preparation Of Joint By Cutting Of Cable, Heat Shrinking Of Sleeves & Resistance Testing Of Prepared Joint Of Work Also Included Reconnection Of Repaired Cable As Required. All Necessary Work For Proper Completion Of Work Has To Carried Out By The Agency.