}

Renovation Of Re Chloride Shed Lump Sum Charges For Pumping Of Accumulation Of Rain Water Inside The Storage Shed Using Suitable Pump With Hose To Nearby Collection Pit, Scrubbing, Cleaning Of Waste Material Lying On The Floor Surface Using Mopping Brus, Udyogmandal-Kerala

Boards / Undertakings / PSU has published Renovation Of Re Chloride Shed Lump Sum Charges For Pumping Of Accumulation Of Rain Water Inside The Storage Shed Using Suitable Pump With Hose To Nearby Collection Pit, Scrubbing, Cleaning Of Waste Material Lying On The Floor Surface Using Mopping Brus. Submission Date for this Tender is 16-04-2022. Coats and Jackets Tenders in Udyogmandal Kerala. Bidders can get complete Tender details and download the document.




Tender Notice

31690554
Renovation Of Re Chloride Shed Lump Sum Charges For Pumping Of Accumulation Of Rain Water Inside The Storage Shed Using Suitable Pump With Hose To Nearby Collection Pit, Scrubbing, Cleaning Of Waste Material Lying On The Floor Surface Using Mopping Brus
Open Tender
Indian
Kerala
Udyogmandal
16-04-2022

Tender Details

Renovation Of Re Chloride Shed Lump Sum Charges For Pumping Of Accumulation Of Rain Water Inside The Storage Shed Using Suitable Pump With Hose To Nearby Collection Pit, Scrubbing, Cleaning Of Waste Material Lying On The Floor Surface Using Mopping Brush & Collecting Into The Gunny Bags And Shifted To Slurry Plant Or Trenches As Directed By Engineer-In-Charge. ( Approx Floor Area 650M2 ) . The Rate Shall Include Labour Charges & Cost Of All Materials, Hire Charges Of Tools & Consumables Required For The Work, Scaffolding Charges, Etc., To Carryout Complete Work. For Details Refer Annexure- V, Si.No.1. 2 2 Renovation Of Re Chloride Shed Dismantling Of Masonry Wall, Brick Bunds, Damaged Floor Concrete, Old Footings Etc. Using Portable Electrically Operated Heavy-Duty Breaker Machine, Including Cutting Of Re-Bars Using Grinder / Gas Cutter, Operator Charges, Labour Charges For Cleaning And Shifting The Debris Generated Into Our Scrap Yard, Hire Charges Of The Machine Etc., For Carryout The Work.The Rate Shall Include Labour Charges & Cost Of All Materials, Hire Charges Of Tools Required For The Work, Consumables Etc., Scaffolding Charges, Safety Ladder, Working Platform, Ties Etc., For Carrying Out The Complete Work. For Details Refer Annexure- V, Si.No.2. 3 3 Renovation Of Re Chloride Shed Decontamination Of Masonry Wall, Columns & Floor Surface Which Includes Thorough Cleaning Using Scrapper / Wire Brushetc., & Collecting All Loose Particles, Dirt, Dusts Etc. In Gunny / Jumbo Bags After Directing / Mopping The Waste.The Waste Bags Filled Shall Be Then Disposed Into Slurrying Plant Or Trenches At The Disposal Yard As Per The Direction Of The Engineer-In-Charge.Thereafter High-Pressure Jet Pump Shall Be Used In Two Or More Passes For Effective Washing & Cleaning The Floor / Wall To Remove The Complete Contaminants To The Possible Extent. For Details Refer Annexure- V, Si.No.3. 4 4 Renovation Of Re Chloride Shed Supply Of Structural Steel, Fabrication & Erection Of Roof Structural Members Such As Columns, Rafters, Trusses, Side Cladding Supports, Cleats, Bracings, Gussets, Stiffeners And Other Supports Including Welding, Bolting, Jointing For Replacement Of Damaged / Worn-Out / Corroded Structural Members In Existing Ms Trusses, Purlins, Bracings, Columns Etc., Either Partially Or Full Members After Taking Actual Site Measurements To Suit Existing Site Condition And Roof Setup Wherever Required In Storage Sheds To Complete The Work As Directed By Engineer-In-Charge. For Details Refer Annexure- V, Si.No.4. 5 5 Renovation Of Re Chloride Shed Dismantling Of Ms Structural Members By Appropriate Cutting Method ( Cold Cutting / Gas Cutting Etc. ) The Work Includes Cutting, Removal Of Roof Structural Like Columns, Beams, Trusses, Gussets, Stiffeners, Bracing, Platform, Staircase Etc. And Dispose The Dismantled Items In To The Scrap Yard.The Rate Shall Include Labour Charges, Cost Of Consumables, Hire Charges Of Tools, Gas Cutting Equipment, Vehicles Required For Transportation Etc, For Completion Of The Work In All Respects. For Details Refer Annexure- V, Si.No.5. 6 6 Renovation Of Re Chloride Shed Supply & Laying Of Colour Coated Zincalume ( Aluminium-Zinc Alloy ) Roof Sheet Of Make ( Tata Bluescope Or Equivalent ) Of Thickness 0.6Mm For Roofing, Ridge, Trafford Profile, Grey Colour ( Matt Or Glossy Finish ) , Including Fixing With Polymer Coated J / L Bolts Of 8Mm Dia Suitable For Existing Purlins, Making The Roof Leak Proof By Applying Weather Resistant Silicon Sealant Over The Bolts & Joints, Cutting Of Sheets To Required Shape / Length Etc., Make The Roof Leak Proof As Required To Suit The Existing Site Conditions. For Details Refer Annexure- V, Si.No.6. 7 7 Renovation Of Re Chloride Shed Supply & Laying Polycarbonate Roof Sheet 1.50 Mm Thick Or Nearest, Trafford Type, Make: Tuflite / Everest / Aerolite / Lotus Fixing As Per Manufactures Specification In Required Area To Suit The Zincalume Roofing Sheet Profile, Required Shape / Length For Lighting Purpose, Including Supply & Fixing Of Polymer Coated J / L Bolts Of 8Mm Dia Suitable For Purlin, Making The Roof Leak Proof By Applying Weather Resistant Silicon Sealant Over The Roof Bolts & Joints, Cutting Of Sheets To Required Shape / Length Etc., Make The Roof Leak Proof As Required To Suit The Existing Site Conditions. For Details Refer Annexure- V, Si.No.7. 8 8 Renovation Of Re Chloride Shed Supply And Painting Of Ms Structural Roof Trusses, Rafters, Purlins, Bracings, Stiffeners, Joint Plates, Columns And Other Roof Supports Accessories Etc., With One Coat Of Epoxy Primer ( Zinc Phosphate ) And Two Coats Of Chemical Resistant Epoxy Finish Paint ( Make: Asian / Berger / Nerolac / Sika / Basf / Fosroc / Grandpolycoats ) After Thorough Surface Preparation Using Wire Brush, Scrapper, Chisel, Cup Brush Fitted With Angle Grinder Wherever Suit To Site Condition And Thereafter Removal Of Dust And Particles Using Cotton Cloth From The Surface Including Scaffolding Charges, Cost Of Paint Brushes, Wire Brush Etc., For Carrying Out The Complete Work. For Details Refer Annexure- V, Si.No.8. 9 9 Renovation Of Re Chloride Shed Providing Masonry Work In Cm 1:5 Mix Using Standard Size Concrete Blocks Of Good Quality Including Racking Out Of Joints, Finishing To Proper Lines And Levels, Chipping The Existing Column / Wall Surface For Necessary Bonding, Curing Etc, And Disposing The Waste Generated During The Work In To Disposal Yard Within A Distance Of 500M Inside The Company Premises.For Details Refer Annexure- V, Si.No.9. 10 10 Renovation Of Re Chloride Shed Providing & Fixing Reinforcement With High Yield Strength Deformed ( Hysd ) Fe500 Bars Conforming To Is 1786, Make: Vizag / Sail / Tata / Jsw / Essar, Cutting To Required Size, Bending & Placing In Position, Binding With 18 / 20 Gauge Black Annealed / Gi Tying Wire, Including Cost Of All Materials, Conveyance, Lead, Lift Of All Materials, Labour, Etc., For All Rcc Works As Directed By Engineer-In-Charge. ( Weight Of Steel Bar Shall Be Taken As Per Relevant Is Standard ) . For Details Refer Annexure- V, Si.No.10. 11 11 Renovation Of Re Chloride Shed Providing And Laying Rcc M25 Grade Concrete Mix For Repair Of Damaged Rcc Structural Elements Such As Beam & Columns, Column Footing After Dismantling Of Damaged Portion Etc., With A Minimum Cement Content Of 380 Kg / M3 Of Concrete By Using 12Mm Downgraded Stones, Mechanically Vibrated, Consolidated, Curing, Including Usage Of Quality Material As Approved, Cost, Conveyance, Lead, Lift Of All Materials, Labour, Necessary Shuttering / Formwork To Carry Out The Complete Work.For Details Refer Annexure- V, Si.No.11. 12 12 Renovation Of Re Chloride Shed Providing And Laying In Position Plain Cement Concrete Mix 1:3:6 ( 1Cement, 3 Coarse Sand And 6 Graded Broken Stone Aggregate 20 -10Mm Nominal Size ) Machine Mixed After Leveling The Existing Earth Surface, Removal Roots Of Tress, Site Clearing By Engaging Jcb, Thickness Of 75-100 Mm Including Ramming, Cost And Conveyance Of All Materials, Curing, Labour Etc., Complete As Directed By Engineer In Charge. For Details Refer Annexure- V, Si.No.12. 13 13 Renovation Of Re Chloride Shed Providing And Laying M 30 Grade Ready Mix Concrete For Flooring With Minimum Cement Of 350 Kg Pure Opc 53 Grade Using Suitable Bonding Agent, Non-Metallic Dry Shake Floor Hardener As Per Manufacturer Specification & Recommendations, Power Trowel Finish, Groove Cut At Standard Interval Of 10M And Making Groove Filling With Bitumen Or Equivalent. For Details Refer Annexure- V, Si.No.13. 14 14 Renovation Of Re Chloride Shed Providing Plastering In Cm 1:5 Mixing & Application Of Mortar, Finishing Smooth To Proper Line & Level For Masonry Wall, 10Mm Average Thick, Using Good Quality M-Sand, One Coat Floated Hard And Trowelled Smooth, Curing, Scaffolding, Staging Etc., Complete. For Details Refer Annexure- V, Si.No.14. 15 15 Renovation Of Re Chloride Shed Supply & Painting The Masonry Parts ( Wall, Columns, Beams ) Interior Surface With One Coat Of Water Based Primer & Two Coats Of Water Based Finish Paint Using Premium Grade Acrylic Emulsion Of Make : Asian / Berger / Nerolac / Indigo, After Thorough Surface Preparation Which Includes Removing Loose Old Paint Layer Thoroughly, Dirt, Grease Etc., By Using Emery Paper, Cleaning The Surfaces Using High Pressure Jet Pump, Sand / Wire Brushes / Scrapper, Cleaning Etc For Details Refer Annexure- V, Si.No.15. 16 16 Renovation Of Re Chloride Shed Supply And Fixing Of Frp Valley Gutter Using Ms Sheet Of Thickness 3Mm ( Trapezoidal Shape ) As Suit To Site Conditions With Necessary Supports And Providing 3 Layers Of Chopped Strand Matt Of 450 Gsm And One Layer Of Surface Matt Using Isophthalic Resin In Each Layer For Binding With Overall Thickness Of 6Mm, Providing Necessary Stiffeners At Regular Interval To Prevent Sagging, Fixing Just Below The Edge Of Roof Sheet, Providing Sufficient Slope Towards Both Ends Into The Drain Pipe, Each Gutter Of Length 4M To 6M Approx, Proper Overlapping At Joints Shall Be Given. For Details Refer Annexure- V, Si.No.16. 17 17 Renovation Of Re Chloride Shed Supply & Fixing Pvc Pipe Of 6? Dia Or Nearest For Rain Water Down Take From Roof Gutter Of 4 Kg / Cm2 Pressure Rating, Including Suitable Specials Such As Bends, Tees, Elbows Etc., Required For The Work Suit To Site Setup, Placing At Site In Position With Necessary Jointing To Proof Leak, Slopping To Drain Etc., Accessories For The Roof Set-Up And Sealing Them, Necessary Anchoring, Clamping, Grouting To The Masonry Structure After Removal Of Damaged Pipes Etc. Complete All Required For The Completion Of Work And As Directed By Engineer-In-Charge With Prior Approval For All Fittings.For Details Refer Annexure- V, Si.No.17. 18 18 Renovation Of Re Chloride Shed Providing Frp Lining In Existing Roof Gutters ( Rcc / Frp ) Using One Layer Of Chopped Strand Matt Of 450 Gsm And One Layer Of Surface Mat With Pigment Coating In Isophthalic Resin Including Cost Of All Materials, Labour Charges For Cleaning, Laying, Cutting Etc., Scaffolding, Working Implements Etc., Complete. Proper Surface Preparation Shall Be Done Before Carrying Out The Lining Work. For Details Refer Annexure- V, Si.No.18.

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail