Supply Of Fired Heaters Supply Of Fired Heaters , Heater Package Works For Cdw Unit Of Epcm ( P-25 ) Project On Lumpsum Turnkey Basis With Single Point Responsibility Including But Not Limited To The Following Activities Of Works: Scope Of Supply And Work: Design, Engineering, Equipment, Refractory, Platform & Ladders, Support Structures, Piping, Instrumentation & Control, Materials, Procurement, Fabrication, Insulation, Fire Proofing, Painting, Inspection, Testing, Third Party Inspection, Supply Of Commissioning Spares, Mandatory Spares, Special Tool & Tackles, Preservation, Packing, Preparation For Shipment, Transport To Site, Documentation, Erection, Pre-Commissioning & Commissioning And Demonstrating Performance Guarantee Test Run Including Final Acceptance Of The Heater Packages” And Operator Training. Vendor Scope Includes Five Years Annual Maintenance Contractor Analyser Package. Scope Of Work Shall Be, But Not Limited To Project Management, Design And Detailed Engineering, Procurement, Third Party Inspection, Supply, Route Survey For Odc Consignment ( If Any ) Upto The Place Of Installation, Transportation, Storage Of All Material Including Security And Preservation, Fabrication, Erection At Site, Onsite Inspection, Expediting And Testing, All Structural ( Excluding Civil Work Such As Piling & Foundation ) , Piping, Electrical & Instrumentation Works, Painting & Insulation, Fire Proofing Obtaining All Statutory Approvals ( Fired Heater Vendors Scope Is To Obtain Only Ibr Clearance And For All Other Statutory Clearances Like, Dgca, Ccoe, Oisd Peso, Pollution Control Boards Etc., Heater Vendor Shall Only Be Required To Provide Documentary Assistance ) , Supply Of Spares ( Mandatory & Commissioning ) , Supply Of Special Tools / Tackles, Supply Of Consumables ( Chemicals And Lubricants ) , Mechanical Completion, Precommissioning / Startup; Commissioning And Demonstrating Performance Guarantee Test, Final Handing Over Of The Facilities Along With Final And “As Built” Drawing / Documentation, Project Data And Information Handing Over Specification In Accordance With The Bidding Documents. Vendor Scope Includes Five Years Annual Maintenance Contractor Analyser Package. , Sp-1 ( Supply Portion ) - Fired Heaters ( 413-H-01, 413-H-02, 413-H-03 ) , Sp-1 ( Supply Portion ) - Fired Heaters ( 413-H-01, 413-H-02, 413-H-03 ) : Lumpsum Price For Supply Portion For Completion Of Scope Of Work As Per Bidding Document ( Except Custom Duty, Sws, And Igst / Cgst& Sgst Andits Related Cess If Any. ) , Sp-1 ( Supply Portion ) - Fired Heaters ( 413-H-01, 413-H-02, 413-H-03 ) : Lumpsum Price For Supply Portion For Completion Of Scope Of Work As Per Bidding Document ( Except Custom Duty, Sws, And Igst / Cgst& Sgst Andits Related Cess If Any. ) , Sp-2 ( Services Portion ) - Fired Heaters ( 413-H-01, 413-H-02, 413-H-03 ) : Residual Design & Engineering, Detail Engineering, 3D Modelling, Preparation & Submission Of Engineering Drawings And Related Documentation Including As-Built Documentation And Field Engineering As Per The Tender Specifications. , Sp-2 ( Services Portion - Design & Engineering ) - Fired Heaters ( 413-H-01, 413-H-02, 413-H-03 ) : In Foreign Currency ( Except Igst / Cgst& Sgst And Its Related Cess, If Any ) , Sp-2 ( Services Portion- Design & Engineering ) - Fired Heaters ( 413-H-01, 413-H-02, 413-H-03 ) : In Indian Currency ( Except Igst / Cgst& Sgst And Its Related Cess, If Any ) , Sp-2 ( Services Portion ) - Fired Heaters ( 413-H-01, 413-H-02, 413-H-03 ) : Lumpsum Price For Constructionand Installation Portion As Per Requirements Detailed Out In Various Sections Of Bidding Document. , Sp-2 ( Services Portion - Construction & Installation ) - Fired Heaters ( 413-H-01, 413-H-02, 413-H-03 ) : In Foreign Currency ( Except Igst / Cgst& Sgst And Its Related Cess, If Any ) , Sp-2 ( Services Portion - Construction & Installation ) - Fired Heaters ( 413-H-01, 413-H-02, 413-H-03 ) : In Indian Currency ( Except Igst / Cgst& Sgst And Its Related Cess, If Any ) , Sp-7 ( Pwcamc ) - Fired Heaters ( 413-H-01, 413-H-02, 413-H-03 ) : Lumpsum Charges For Five Years Comprehensive Post Warranty Maintenance For Analysers And Analyser Systems As Per Requirements Detailed Out In Various Sections Of Bidding Document. , Sp-7 ( Pwcamc ) - Fired Heaters ( 413-H-01, 413-H-02, 413-H-03 ) : In Foreign Currency ( Except Igst / Cgst& Sgst And Its Related Cess, If Any ) , Sp-7 ( Pwcamc ) - Fired Heaters ( 413-H-01, 413-H-02, 413-H-03 ) : In Indian Currency ( Except Igst / Cgst& Sgst And Its Related Cess, If Any ) , Sp-0 ( Total Of Sp-1, Sp-2 & Sp-7 ) - Fired Heaters ( 413-H-01, 413-H-02, 413-H-03 ) , Sp-0 ( Total Of Sp-1, Sp-2 & Sp-7 ) - Fired Heaters ( 413-H-01, 413-H-02, 413-H-03 )