Shed Facility Dismantling Of Brick / Masonry Wall, Lintels, Etc. Using Diamond Cutting Wheel And Portable Heavy-Duty Concrete Breaker Machine Including Cutting Of Re-Bars Using Grinder / Gas Cutter & Removing Of All Debris Generated. The Dismantled Item Must Be Disposed To The Disposal Yard Within A Distance Of 500M. Details Boq Clause Number 1, Annexure -V 2 2 Shed Facility Providing And Laying In Position Plain Cement Concrete Mix 1:2:4 ( 1 Cement, 2 Coarse Sand And 4 Graded Broken Stone Aggregate 20-12Mm Nominal Size ) For Floor Concrete Repair Work, Damaged Pit, Bunds Etc., After Ramming Of Existing Earth, Well Compacted, Finishing Smooth To A Fair Face At All Levels, Curing Etc., Complete. 3 3 Shed Facility Providing & Laying Reinforced Cement Concrete 1:1.5:3 Mix ( 1 Cement, 11 / 2 Coarse Sand And 3 Graded Broken Stone Aggregate 10-20Mm Nominal Size ) For Column Foundation, Collection Pit, Flooring, Hump / Bund, Precast Slab, Etc., Properly Vibrated Using Mechanical Vibrators, Consolidated To Proper Lines & Levels And Finished Smooth At The Top Using Trowel. Water Curing Must Be Given For The Required Period. 4 4 Shed Facility Labour Charges For Fixing Reinforcement High Yield Strength Deformed Bars, Cutting To Required Size, Bending & Placing In Position, Binding With 18 / 20 Gauge Black Annealed / Gi Tying Wire, Including Lead, Lift Of Reinforcement Form Our Stores To Site, Laying As Per Drawing And As Directed By Engineer-In-Charge ( Weight Of Steel Bar Shall Be Taken As Per Relevant Is Standard ) . 5 5 Shed Facility Providing Shuttering / Formwork For Rcc Works Such As Column Footings, Collection Pit, Flooring, Bund Etc. Using Plywood With Sufficient Wooden Runners Or Ms Sheets With Enough Strength To Withstand The Load Of Mechanical Vibrator During Compaction Of Concrete. 6 6 Shed Facility Providing Masonry Work In Cm 1:5, Using Concrete Block / Brick Of Required Size Including Raking Out Joints, Finishing To Proper Lines & Levels, Chipping The Existing Floor Concrete Surface For Necessary Bonding, Curing Etc., Complete At All Levels. 7 7 Shed Facility Plastering In Cm 1:4, 10 Mm Average Thick, Using Good Quality M-Sand, One Coat Floated Hard And Trowelled Smooth And Curing Etc., Complete. 8 8 Shed Facility Fabrication & Erection Of Ms Structural Supports Such As Columns, Rafters, Purlins And Other Supports Etc., Including Straightening, Cutting, Fixing In Position, Welding, Bolting At Required Places, Painting The Steel Surface With One Coat Of Epoxy Primer & One Coat Of Epoxy Finish Paint After Thorough Surface Preparation To Carry Out The Complete Work. 9 9 Shed Facility Labour Charges For Laying Ac / Non-Ac / Polycarbonate / Upvc Roof Sheets Including Curve Sheets & Side Cladding, Shall Be Fixed Using Gi Bolts Of J / L 8Mm Dia Polymer Coated With Nuts, Plate And Washers, Caps Etc., And Apply Weather Proof Silicon Sealant Over The Exposed Top Portion Of The Bolt & Nut And Make The Roof Leak Proof. The Holes For Fixing Roof Bolts Into Roof Sheets Shall Be Drilled Using Portable Drilling Machine.