Laying 475 M 11 Lk Ug Cable Along Lal Salam Road And Installing 100 Kva Transformer Under Es Vyttila Laying 475 M 11 Lk Ug Cable Along Lal Salam Road And Installing 100 Kva Transformer Under Es Vyttila, ernakulam-Kerala

Kerala State Electricity Board-KSEB has published Laying 475 M 11 Lk Ug Cable Along Lal Salam Road And Installing 100 Kva Transformer Under Es Vyttila Laying 475 M 11 Lk Ug Cable Along Lal Salam Road And Installing 100 Kva Transformer Under Es Vyttila. Submission Date for this Tender is 26-02-2022. Road Work Tenders in ernakulam Kerala. Bidders can get complete Tender details and download the document.




Tender Notice

31019809
Corrigendum : Laying 475 M 11 Lk Ug Cable Along Lal Salam Road And Installing 100 Kva Transformer Under Es Vyttila Laying 475 M 11 Lk Ug Cable Along Lal Salam Road And Installing 100 Kva Transformer Under Es Vyttila
Open Tender
Indian
Kerala
ernakulam
26-02-2022

Tender Details

Laying 475 M 11 Lk Ug Cable Along Lal Salam Road And Installing 100 Kva Transformer Under Es Vyttila Laying 475 M 11 Lk Ug Cable Along Lal Salam Road And Installing 100 Kva Transformer Under Es Vyttila

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 22-Feb-2022 DATE CORRIGENDUM1 Date 26-02-2022

Key Value

Document Fees
INR 5900 /-
EMD
INR 16400.0 /-
Tender Value
INR 10.89 Lakhs /-

BOQ Items

Name of Work:LAYING 475m 11 KV UG CABLE ALONG LAL SALAM ROAD AND INSTALLING 100 KVA TRANSFORMERUNDER ELECTRICAL SECTION VYTTILA
Sl. No. Item Description
1Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle).
2Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading.
3Transporting Transformers by hired vehicle upto 5km and upto 2 No. of 63 to 250kVA Transformers / RMUs excluding loading & unloading.
4Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite.
5Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads.
6Fitting 6 channel cross arms, AB switch, DO fuse, LA, HT & LT connections on existing DP, 3 LT fuses.
7Installing one DTR meter with box on existing channel/angle cross-arm on DPstructure and giving connections including conveyance
8Providingone Earth using earth pipe incl.digging separate pit at standard distance away from the pole/structure & backfilling
9Drilling hole of various sizes on existing Channel/Cross Arm.
10Erecting one 100kVA Transformer to existing DP and giving connections, incl. loading & unloading, excluding transportation.
11Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite.
12Fitting one Additional V cross arm in existing single pole incl. conveyance of materials.
13Fitting one additional HT pin with insulator
14Fitting one additional F top bracket
15Fitting one LT 4 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line.
16Fitting one additional Fuse unit and giving connection from Transformer to fuse and DB to LT OH line.
17Supplying and laying 11kV 3x300Sq mm Aluminium XLPE UG cableby horizontal directional drilling methodalong/ across roads,supplying and pulling 110mm HDPE pipe duct drawing 11kV 3x300Sq mm Aluminium XLPE UG cable through the ductincluding surveying the site for collecting information about under ground utility installations and other obstructions using suitable modern sensing equipments, restoring the damages occurred if any,pit making, pilot drilling, pre reaming, closing of pits with normal soil/filled sand/crusher sand and consolidation to the satisfaction of the road ownerand traffic policeas they insist, taking the cable to the open trenches, RMUs, transformer yardsetc., mounting the cable after providing loop at 1.2m depth , putting HDPE(PE-63,4Kg/sq cm) at rising point(0.5 m below ground level and 1.5m above ground level) making RCC jointing chambers for straight joints if any, testing commissioning, placing route markers at 100m interval, writing identification name ,date of laying ,date of commissioning etc. legibly on the cable risingusing polyurathane paint etc. as per the direction of departmental officers, providing with as built laminated cable route drawing, marking the HDD pits, distance of pits from the boundary of the road, length of the cable bit etc. including the cost of all materials, labour and hire charges, conveyanceetc. complete except the cost of 3 core 300 mm2 XLPE UG cable.
18Doing straight joint on cables of sizes beyond3x185sqmm and upto and incl. 3x300 sq mm using the cable jointing kit supplied departmentally as per specification.
19Doing one cable end termination on cables of sizes beyond3x185 sqmm and upto and incl. 3x300 sq mm using the cable jointing kit supplied departmentally.
20Mounting the cable ends of all sizes upto and incl. 3x300 sq mm with special type cable clamps incl. cost of extra materials if needed and giving necessary connections.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail