}

1.20 H.P. Solar Pump, Vfd, Solar Panel Set And 2. 10 H.P. Dc Solar Pump, Solar Panel, Steel Structure Supplying, Installation And Commissioning For Lift Irrigation Scheme At Bardeva, Block - Padma, District- Hazaribag 1.20 H.P. Solar Pump, Vfd, Solar Pane, hazaribag-Jharkhand

Water Resources Department has published 1.20 H.P. Solar Pump, Vfd, Solar Panel Set And 2. 10 H.P. Dc Solar Pump, Solar Panel, Steel Structure Supplying, Installation And Commissioning For Lift Irrigation Scheme At Bardeva, Block - Padma, District- Hazaribag 1.20 H.P. Solar Pump, Vfd, Solar Pane. Submission Date for this Tender is 14-02-2022. Bolts Tenders in hazaribag Jharkhand. Bidders can get complete Tender details and download the document.




Tender Notice

31019107
1.20 H.P. Solar Pump, Vfd, Solar Panel Set And 2. 10 H.P. Dc Solar Pump, Solar Panel, Steel Structure Supplying, Installation And Commissioning For Lift Irrigation Scheme At Bardeva, Block - Padma, District- Hazaribag 1.20 H.P. Solar Pump, Vfd, Solar Pane
Open Tender
NCB
Jharkhand
Hazaribag
14-02-2022

Tender Details

1.20 H.P. Solar Pump, Vfd, Solar Panel Set And 2. 10 H.P. Dc Solar Pump, Solar Panel, Steel Structure Supplying, Installation And Commissioning For Lift Irrigation Scheme At Bardeva, Block - Padma, District- Hazaribag 1.20 H.P. Solar Pump, Vfd, Solar Panel Set And 2. 10 H.P. Dc Solar Pump, Solar Panel, Steel Structure Supplying, Installation And Commissioning For Lift Irrigation Scheme At Bardeva, Block - Padma, District- Hazaribag , For 20 Hp Spv Ac Surface Pump , Solar Module Mounting (Galvanised Steel) Surface Structure (For 50 Kw) Having Hot Deep Galvanised Ofzinc Thickness 80Micron And As Per Is4759 With C Channel $ Anti Theft With Nut Bolt Of Grade Ss304,Which Should Also Withstand High Wind Velocity Upto 150Km/Hr Or As Per Mnre. , 50Kwp Spv Module Of 330Wp Or Higher Rating, Which Must Have Specification As Per Is 14286/Iec 61215 .The Module Must Have To Quilifyis/Iec 61730 Part I $ Ii (Or Having Mechanical Load Test Of 5400Pa) For Safety Purpose.Module To Module Wattage Mismatch In Spv Array Shall Be +/-3% And To Qualify Iec Ts 62804-:2015 For The Detection Of Potential Induced Degradation And Warranted For Output Wattage Not Less Than 90% In 10Yrs And 80% At The End Of 25Yrs As Per Mnre. , Spv Controller/Vfd Integrated With Gprs,Having Mppt ,Protection Ip 65 Or Above As Per Mnre. , Solar Cable 4 Mm2usedas Per Is 694 Or As Per Mnre. , Copper Cable 95 Mm2 Used As Per Is 694 Or As Per Mnre. , Arrangement Of Lightening Arrestor Excluding Earthing , 20 H.P. A.C. Solar Pump Set Ofhaving Performance With Respect To Total Head,Maximum Current,Capacity, Voltage Range Etc As Per Mnre Guidelines. , Array Junction Box (Ip 65 Or Above ) As Per Mnre , Miscllaneous Accessories For Installation Of 20H.P. Solar Pump , Supplying,Installation And Commissioning Charge Of Module $ Structure , Maintenance For Atleast 5 Years Or As Per Mnre Guidelines , For 10 Hp Spv Dc Surface Pump , Solar Module Mounting (Galvanised Steel) Surface Structure For 50 Kw Having Hot Deep Galvanised Ofzinc Thickness 80Micron And As Per Is4759 With C Channel $ Anti Theft With Nut Bolt Of Grade Ss304which Should Also Withstand High Wind Velocity Upto 150Km/Hr Or As Per Mnre. , 50 Kwp Spv Module 330Wp Or Higher Which Must Have Specification As Per Is 14286/Iec 61215 .The Module Must Have To Quilifyis/Iec 61730 Part I $ Ii (Or Having Mechanical Load Test Of 5400Pa) For Safety Purpose.Module To Module Wattage Mismatch In Spv Array Shall Be +/-3% And To Qualify Iec Ts 62804-:2015 For The Detection Of Potential Induced Degradation And Warranted For Output Wattage Not Less Than 90% In 10Yrs And 80% At The End Of 25Yrs As Per Mnre. , Spv Controller/Vfd Integrated With Gprs,Having Mppt ,Protection Ip 65 Or Above As Per Mnre. , Solar Cable Of 4Mm2 Used As Per Is 694 Or As Per Mnre , Copper Cable 25Mm2 Used As Per Is 694 Or As Per Mnre. , Arrangement Of Lightening Arrestor Excluding Earthingas Per Mnre. , 10 H.P. D.C. (Pmsm/Bldc/Srm) Solar Pump Set Ofhaving Performance With Respect To Total Head, Maximum Current,Capacity,Voltage Range Etc As Per Mnre Guidelines. , Array Junction Box (Ip 65 Or Above) As Per Mnre , Miscllaneous Accessories For Installation Of 10 H.P. Solar Pump , Supplying,Installation And Commissioning Charge Of Module And Structure , Maintenance For Atleast 5 Years Or As Per Mnre Guidelines

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail