Supply Of Material Under The Work Of Sr To Conservation Of Afsah Wala Ki Mosque And Tomb Situated Outside The West Gate Of Humayuns Tomb As Specified In The Boq Supply Of Material Under The Work Of Sr To Conservation Of Afsah Wala Ki Mosque And Tomb Situated Outside The West Gate Of Humayuns Tomb As Specified In The Boq , Conservation Work , D.Q Stone , Lime , Brick Agg. 20Mm To 25Mm Nominal , Molasses , Corse Sand , Surkhi , Belgiri , Gur , Gum , B.P.Sand , F.P.S Brick Class Designation 7.5 , Cement Bag , Malba , Pvc Pan ( Tasla ) , Iron Chisel 4, 6, 8 , Spade With Handle , Narial Rope 25Mm , Sisal Rope 25Mm , Nylon Rope 1 / 2 , Iron Pully 6Dia , Pvc Bucket Big Size , Safety Net 30Feet X 10Feet , Safety Belt Isi , Pvc Helmet , Hammer 1Kg With Handle , Hammer Big Size 5 Lbs , Signage Board For Work In Progress , Wire & Coir Brush , Cane Basket , Pvc Fabric Polythene Sheet , Hassion Cloth , Agro Shed Net Cloth ( Green ) , Pvc Water Tank 500 Ltr , Gum Boot Pvc , Pvc Pipe 1, 2 , Wooden Handle ( Fawra, Hammer ) , First Aid Box With Medicine , Red Oxide Primer , Paint ( Red Colour ) , Diesel , Sal Wood Planks ( Size 3X0.25X0.05 ) , Charges Of Detailed Drawings & Documentaion , Provision For Repairing Of The Grinding Mixer Machine , Providing Corrugated G.S. Sheet Roofing Including Vertical / Curved Surface Fixed With Polymer Coated J Or L Hooks, Bolts And Nuts 8Mm Diameter With Bitumen And G.I Limpet Washers Or With G.I Limpet Washers Filled With White Lead, Including A Coat Of Approved Steel Primer And Two Coats Ofapproved Paint On Overlapping Of Sheets Complete ( Up To Any Pitch In Horizontal / Vertical Of Curved Surfaces ) , Excluding The Cost Of Purlins, Rafters And Trusses And Including Cutting To Size And Shape Wherever Required. 1.00Mm Thick With Zinc Coating Not Less Than 275 Gm / Sqm. , Provision For Purchasing Poles ( Vertically & Horizontal ) For Supporting Of Teen Shed For Lime Slacking Unit And Store. 4Mtr. Pale 80 Mm ( Vertically ) , 6 Mtr. Pale 60Mm ( Horizontally ) , 7 Mtr Pale 60Mm ( Horizontally ) , Providing And Fixing Double Scaffolding System ( Cup Lock Type ) On The Exterior Side, Up To Seven Story Height Made With 40 Mm Dia M.S. Tube 1.5 M Centre To Centre, Horizontal & Vertical Tubes Joining With Cup & Lock System With M.S. Tubes, M.S. Tube Challies, M.S. Clamps And M.S. Staircase System In The Scaffolding For Working Platform Etc. And Maintaining It In A Serviceable Condition For The Required Duration As Approved And Removing It Thereafter .The Scaffolding System Shall Be Stiffened With Bracings, Runners, Connection With The Building Etc Wherever Required For Inspection Of Work At Required Locations With Essential Safety Features For The Workmen Etc. Complete As Per Directions And Approval Of Engineer In-Charge .The Elevational Area Of The Scaffolding Shall Be Measured For Payment Purpose .The Payment Will Be Made Once Irrespective Of Duration Of Scaffolding.