| 1 | COST FOR O&M OF CHS & RRLS |
| 2 | \",,The fixed cost for the mentioned line item includes the cost of manpower involved for Operation and maintenance of Conveyor System including Housekeeping of the complete system and periphery, Housekeeping of RRLS & connected Railway Track, Mobilisation of JCB, tractor-trolley etc. for removal of coke spilled during loading operation, and the cost of Spares, Consumables, Tools & tackles etc. required for Operation and Maintenance of Conveyor System. |
| 3 | \",,The cost for the mentioned line item includes Cost per Metric Tonne of Pet coke loading either into Rail wagon or Trucks by using the RRLS facility at IOCL Paradip Refinery. |
| 4 | \",,The cost for the mentioned line item includes Cost per Metric Tonne of Pet coke loading either into Trucks or Over Ground Hopper by using Pay Loader in Coke Yard at IOCL Paradip Refinery. |
| 5 | The cost of line item includes emergency evacuation of coke from DCU to coke yard as per instruction from EIC. |
| 6 | \",,The cost of line item includes Operation and Maintenance of Conveyor system in third shift during extreme emergency as per instruction from EIC. |
| 7 | CAMC of Rapid Rail Loading System |
| 8 | \",,The cost for the mentioned line item includes Comprehensive Annual Maintenance Contract (CAMC) for Rapid Rail Loading System (RRLS) from OEM or OEM authorized service provider or other reputed party (as decided by EIC) by the contractor .All the spares required for continuous and trouble free operation of these package items shall be in the scope of contractor. Details of CAMC have been mentioned in Clause 3.18 in scope of work in SCC. |
| 9 | CAMC of Inmotion Weigh Bridge |
| 10 | \",,The cost for the mentioned line item includes Comprehensive Annual Maintenance Contract (CAMC) for In Motion Weigh Bridge from OEM or OEM authorized service provider or other reputed party (as decided by EIC) by the contractor. All the spares required for continuous and trouble free operation of these package items shall be in the scope of contractor. Details of CAMC have been mentioned in Clause 3.18 in scope of work in SCC. |
| 11 | CAMC of Fire Detection & Annuniciation S |
| 12 | \",,The cost for the mentioned line item includes Comprehensive Annual Maintenance Contract (CAMC) for Fire Detection & Annunciation System from OEM or OEM authorized service provider or other reputed party (as decided by EIC) by the contractor. All the spares required for continuous and trouble free operation of these package items shall be in the scope of contractor. Details of CAMC have been mentioned in Clause 3.18 in scope of work in SCC. |
| 13 | CPWAMC Charges for Elevator( Two Nos) |
| 14 | \",,The cost for the mentioned line item includes Comprehensive Annual Maintenance Contract (CAMC) for Elevators from OEM or OEM authorized service provider or other reputed party (as decided by EIC) by the contractor. All the spares required for continuous and trouble free operation of these package items shall be in the scope of contractor. Details of CAMC have been mentioned in Clause 3.18 in scope of work in SCC. |
| 15 | Liasioning for Stamping for In-Motion we |
| 16 | \",,The cost of line item includes the expenses like charges payable to Legal metrology department and all other incidental charges / expenses including liasoning & coordination with railways, W&M departments for completion of certification job. |