| 1 | Earth work in in hard soil or gravelly soilwithin 50M initial lead and 1.5m intial lift including rough and breaking clods to maximum 5cm to 7cm. and laying in layers not exceeding 0.3M in depth etc complete as per directetion of the Engineer – in – Charge. |
| 2 | Supplying filling in foundation and plinth with sand including watering ramming, in 22.5 cm thick in layer includincost, conveyance, royalties and allmaterials and cost of labour with T & P required for the work etc. |
| 3 | Cement concrete (1:3:6) in foundation and floors i.e., below the base course of terrazzo flooring using 4 cm (1 ½ “) size black hard crusher broken granite stone metals of approved quality from approved quarry including lowering laying concrete watering and curing etc. complete to required levels laid in layers not exceeding 0” – 6” thick including cost, conveyance, royalties and all materials and cost of all labour with T & P required for the work complete. |
| 4 | Fly ash brick masonry in cement mortar (1:6) in Foundation & plinthusing fly ash bricks of23cmx11cmx8cm size having a crushing strength of not less than 75 kg/cm2 with dimensional tolerance ± 8% including splays cutting circular moulding chamfering and corbelling and similar such type of works with all necessary projections watering and curing after immersing the bricks in water at least for six hours before use including cost, conveyance, royalties of all materials with all labour and T&P required for the work complete in all respect in all floors as per specification and direction ofEngineer-in-charge |
| 5 | R.C.C. work of Grade-M20 in work using20mm size & down graded hard black crusher broken granite stone chips of approved quality from approved quarry in specified proportion including hoisting, lowering, laying and compacting concrete, watering and curing, centering, shuttering and finishing the exposed surfaces smooth with cost, conveyance, royalties, & all of materials with all labour and T&P required for the work etc. complete in all respect but excluding the cost and conveyance of M.S. rods or Tor steel and binding wire of 18 to 20 gauge and labour charges for straightening, cutting, bending, binding and tying the grills and placing in proper position. |
| 6 | Footing |
| 7 | Plinth beam / Tie beam |
| 8 | Column and beam |
| 9 | Lintel band and Cap band |
| 10 | Slab |
| 11 | Straightening bent up or coiled M.S. rod or HYSD steel (Fe-415 / Fe-500), cutting, bending, cranking, hooking, welding or jointing (if required), the M.S. rod or HYSD steel and binding, tying the grills, hoisting, lowering and placing in proper position as per drawing & design required for R.C.C. works including cost, conveyance and taxes of M.S. rod or HYSD steel and binding wires of 18 to 20 gauge and labour with all T&P required for the work etc. complete in all floors |
| 12 | Fly ash brick masonry in cement mortar (1:6) in Superstructureusing fly ash bricks of23Cmx11cmx8cm size having a crushing strength of not less than 75 kg/cm2 with dimensional tolerance ± 8% including splays cutting circular moulding chamfering and corbelling and similar such type of works with all necessary projections watering and curing after immersing the bricks in water at least for six hours before use including cost, conveyance, royalties and all materials with all labour and T&P required for the work complete in all respect in all floors as per specification and direction ofEngineer-in-charge |
| 13 | 12mm (½”) thick cement plaster (1:6) in finished smooth tobrick walls after racking out joints including watering and curing etc. complete with cost, conveyance, royalties,and cost of all materials and cost of all labour with T & P required for the work complete. |
| 14 | 16mm (5/8”) thick cement plaster (1:6) in finishing smooth to inside rough surface of 10” thick brick walls after racking out the joints including watering and curing with cost, conveyance, royalty,of all materials and cost of all labour with T & P required for the work etc. complete |
| 15 | Priming one coat to wall surface with water bound cement primer including cost of the primer with cost, conveyance and all materials and labour with T&P required for the work etc. complete in all respect. |
| 16 | Painting with two coats of WEATHER SEAL COAT (I.S.I.) of approved shade by means of brush / sprayers to outside surface of walls after cleaning the surface etc. complete in all floors including the cost, conveyance, & cost of all labour with T&P required for the work etc. complete in all respects |
| 17 | Supplying filling in foundation with excavated materials including watering ramming, includining cost, conveyance, royalties and allmaterials and cost of labour with T & P required for the work etc. as per direction of EIC. |
| 18 | Supplying fitting fixing of M.S. grill of approved design and drawing as directed by Executive-in-chargeincluding the cost, conveyance, all materials & cost of all labour with T&P required for the work etc. complete in all respects |
| 19 | Finishing wall surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffodling staging charges with cost of all materials, taxes, labour, T&P etc. complete |
| 20 | Painting two coats with any approved synthetic enamel paint of approved quality shade and make to new wood work / iron work including cost of the primer and paint, sand papering polishing the surface with cost, conveyance and taxes |