|
| 1 | M&L for preparation of plastered or un plastered old decorated surfaces of walls by Vacuum based sanding machine, removal of nails etc & filling cracks/hole by applying wall careputty (multipurpose mixer shall be used for uniform and proper mixing of putty) and applying one coat oil emulsion distemper white or colouredby auto rollercomplete all as specified & directed. |
| 2 | M&L for complete removal of existing treatment from old decorated plastered surfaces of walls by Vacuum based sanding machine, removal of nails etc & filling cracks/hole with putty, applying wall careputty upto 1mm thick as required (multipurpose mixer shall be used for uniform and proper mixing of putty) and applying two coats of oil bound distemper white or coloured over a coat of approved primerby auto rollercomplete all as specified & directed by Engineer-in-Charge. |
| 3 | M&L for preparation of plastered or un plastered old decorated surfaces of ceiling by Vacuum based sanding machine,filling cracks/hole by applying wall careputty (multipurpose mixer shall be used for uniform and proper mixing of putty) and applying one coat of oil emulsion distemper white or colouredby auto rollercomplete all as specified & directed. |
| 4 | M&L for preparation of old painted surfaces of wood & wood based surfaceof any description not otherwise described over 10 cm width & girth and applying one coat of synthetic enamel paint complete all as specified and directed. |
| 5 | M&L for preparation of old painted surfaces of steel & steel based surfaceof any description not otherwise described over 10 cm width & girth and applying one coat of synthetic enamel paint complete all as specified and directed. |
| 6 | M&L for preparationold decorated surfaces of walls and cornices, spoiled bysmoke soot, moulds, moss and efflorescent salts and tradingoily and greasy spots by scraping and washing with water and applying one coat of cement base paint complete all asspecifiedand directed. |
| 7 | M&L for preparation of plastered or un plastered old decorated surfaces of walls by Vacuum based sanding machine,removal of nails etc & filling cracks/hole by applying wall careputty (multipurpose mixer shall be used for uniform and proper mixing of putty) and applying one coat of exterior emulsion paint 100% acrilic of approved white or colouredby auto rollercomplete all as specified & directed. |
| 8 | M&L for preparation for old treated plastered or unplastered wall surfaces by brooming down or steel wire brushes, scraping down, smoke spots etc and applying one coat of white wash complete all as specified and directed. |
| 9 | M&L for preparation for old treated plastered or unplastered ceiling surfaces by brooming down or steel wire brushes, scraping down, smoke spots etc and applying one coat of white wash complete all as specified and directed. |
| 10 | Taking down cementplaster of any description on brick or stone walls etc including raking out joints hacking for key scrubbing down with water etc. complete all as specified and directed. |
| 11 | M&L for rendering 15mm thickin cement mortar 1:4 on fair faces of brick work or concrete surfaces, finishing even and fair without using extra cement incl. necessary scafolding upto four story bldg complete all as specified and directed. |
| 12 | M&L forrendering 15mm thickin cement mortar 1:6 on other than fair faces of brick work or concrete surfaces finishing even and fair without using extra cement incl. necessary scafolding upto four story bldg complete all as specified and directed |
| 13 | M&L for rendering 10 mm thickin cement mortar 1:4 on concrete ceiling surfaces finishing even and fair without using extra cement incl. necessary scafolding complete all as specified and directed |
| 14 | M&L for preparation for newly plastered surface of ceiling and applying two coat of oil bound distemper over a coat of primer complete all as specified and directed. |
| 15 | M&L for preparation for newly plastered surface of wall and applying two coat of cement base paintover a coat of primer on walls complete all as specified and as directed by Engineer-In-Charge. |
| 16 | M&L for preparation of newly plastered surfaces of walls, applying wall careputty1-2mm thick as required (multipurpose mixer shall be used for uniform and proper mixing of putty) and applying two coats of exterior emulsion paint 100% acrilic of approved white or coloured over a coat of approved primerby auto rollercomplete all as specified & directed by Engineer-in-Charge. |
| 17 | M&L for preparation of newly plastered surfaces of walls, applying wall careputty upto 1mm thick as required (multipurpose mixer shall be used for uniform and proper mixing of putty) and applying two coats oil emulsion distemper white or coloured over a coat of approved primerby auto rollercomplete all as specified & directed. |
| 18 | M&L for thefollowing works to be carried out in 0.5 lacks Gallon or above RCC OHT of15 mtr column height including necessary scaffolding in areacomplete all as specified & directed by Engineer-in-Charge.(i) Two coat of exterior emulsion paint on all external surfaces of RCC tank. (ii)Two coat of white wash on dome of OHT. (iii) Two coats of synthetic emulsion paint on all steel surface internal and external. (iv). Letter writting60cm hight in two coat of synthetic enamel paint (0.5 Lakh Gallon Capacity). (v) Two coats of synthetic enamel paint on all CI pipe. (vi) Minor leackage to be repaired with epoxy injection. (vii) Minor repair of external cement plaster in cement mortar 1:4 with water proofing compound(appx 20 Sqm Area). |
| 19 | Taking down500 Ltrs PVC tank from roof, including disconnection from exinsting GI tubing and float valves and cleaning the tank (removal of silt and other particals) and refix the tank in same position complete all as specified and directed. |
| 20 | Taking down1000 Ltrs PVC tank from roof, including disconnection from exinsting GI tubing and float valves and cleaning the tank (removal of silt and other particals) and refix the tank in same position complete all as specified and directed. |
| 21 | Note :- 1. The preparation and painting work shall be executed by authorized applicator of paint manufacturer only. 2. Contractor shall submit the MOU letter from paint manufacturer within 15 days of commencement of work.3. Contractor shall procure the paint after approval of make from GE in three equal parts, 1st part within 15 days of commancement and rest 2nd parts at equal intervals or earlier if required and to be kept in users custody under intimation to Engr-in-charge as per HQ CESC policy letter No210007/131/155/E2 (Wks) Army dated 26 Apr 2020 on periodical services.4. Periodical work shall be completed within 7 days after handover of key of new allotted qtrs, in case of delay panality @ Rs 1000/- per day per qtrs shall be impose on the contractor and the same shall be deducted from the contractor\"s dues or becoming dues.5. Necessary cleaning of painting/distemper marks from floor, doors, window, cleaning of furniture and window panes, pelmet box, Pelmet box/Dropery rod shall be deemed to be inclusive of rate quoted by the contractor. Non cleaning of the same a recovery @ Rs 1000/- per qtr shall be made from the contractor. 6. Contractor shall procure/brought to site the sanding machine, auto roller, paint mixing machine and other specified T&P within 15 days from the date of commancement.7. Electric meter during welcome maintenance will be born by contractor at the rate as specified in CA, initial and final meter reading shall be recorded in handing taking notes. |