3rd Phase (Modified) of Campus Wifi and CCTV Surveillance System for University of North Bengal. -Wifi And Cctv Surveillance System For University Of North Bengal , Description , Core Switch , Access Switch - 24 Port , Access Switch - 8 Port , 10G Single Mode Module , 1G Single Mode Module , Wireless Controller High Availability Box , License For 86 Access Points , 1 Ap Ad License , High Density Access Points , Low Density Access Points , Network Management For 86 Licenses , Industrial Grade 8 +2 Port Lan Switch , 6 Core Sm Fiber Optic Cable ( Armoured ) , 24 Core Sm Fiber Optic Cable ( Armoured ) , 12 Port Sm Lc Type Loaded Rack Mount Liu , 24 Port Sm Lc Type Loaded Rack Mount Liu , Lc, Single Mode Pigtail, 1.5 Mtrs , Lc - Lc Duplex Single Mode Fiber Patch Cord - 2 Mtr , 4 Pair Cat 6 Utp Cable - ( Box Of 305 Mtr ) , 4 Pair Cat 6 Stp Cable - ( Box Of 305 Mtr ) , Cat 6 Loaded Panel , Cat 6 Information Outlet , Single Port Face Plate , Pvc Back Box 3 X 3 , Cat 6 Utp Patch Cord - 1 Mtr ( Both Side Rack, Camera & Ap End ) , Supply Of 1080P Ip Weather-Proof Ir Bullet Camera , Supply Of 1080P Ip Weather-Proof Ir Dome Camera , Sitc Of 64Ch Quad Core Embedded Linux , Client Workstation , 600 Va Ups , Sitc Of Ul Listed Fire Suppression System , Sitc Of Seamless Pipes , Sitc Of 4-Zone Conventional Gas Release Panel , Sitc Of Conventional Multisensor Detector , Sitc Of Below Equipment , Sitc Of Autodialer , Camc For 1 Year After 1 Year Dlp , Installation, Configuration, Testing & Training Of All Active Components , Installation, Configuration, Testing & Training Of All Cctv Components , Laying Of 6 Core Optical Fiber Cable Through Hdpe Pipe , Laying Of 24 Core Optical Fiber Cable Through Hdpe Pipe , Installation Of Lius ( 48, 24 & 12 Ports ) In Racks , Splicing Of Optical Fiber Cable Per Core , Fiber Testing With Otdr Per Core & Site Certification , Laying Of 4 Pair Utp Cable Through Pvc Conduit / Flexible Pipe , Laying Of 4 Pair Stp Cable Through Pvc Conduit / Flexible Pipe , Fixing & Termination Ofcat6 Loaded Jack Panel , Termination Of Information Outlets , Fixing Of Back Box & Face Plate , Utp Nodes Testing ( Penta Scanning ) & Site Certification , Installation Of 9U Wall Mounting Rack With Anchor Fastener Bolt , 600 Va Ups , Hard Soil Trenching & Back Filling - 1 Mtr Depth As Per Std. Specification , Soft Soil Trenching & Back Filling - 1 Mtr Depth As Per Standard Specification , Laying Of Gi Pipe , Laying Of Hdpe Pipe , Fixing Of Route Marker , 1M X 1M X 1M Manhole Supply With Installation , Boring , Utm , 3 Years Subscription , Utm Type 2 ( Spec. ) , 3 Years Subscription , 19 9U Wall Mount Rack , Pvc Flexible Pipe 1.25 Dia , Pvc Flexible Pipe 1 Dia , Sitc Of Surveillance 4Tb Hdds , Sitc Of 43 Size Commercial Led Monitor , Sitc Of 3 Core Armoured 1.5 Sq. Mm. Power Cable , Sitc Of 10 M Octagonal Pole , Sitc Of Ip 66 Enclosure Pole Mount => Limited