| 1 | Excavation for roadwork in soil withhydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m As Per Specification No.301(3.60) The Rate of Including Labour Cess |
| 2 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. As Per Specification No. 305(3.16) The Rate of Including Labour Cess |
| 3 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. As Per Specification No. 305(3.17)The Rate of Including Labour Cess |
| 4 | Construction of Granular sub base by providing coarse graded material, spreading in uniform layer with motor grader on prepared surface mixing by mix in place method with rotavator at OMC and compacting with vibtatory roller to achive the desired density complete as per clause 401. The Rate of Including Labour Cess |
| 5 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not less than 150 kg per cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. The Rate of Including Labour Cess |
| 6 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 310 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing The Rate of Including Labour Cess |
| 7 | Construction of embankment with approved material obtained from borrow pits with all lift and leads transporting to site, spreading, grading to required slope and compacting to the meet requirement of table 300-2as per MORT&H Specification. The Rate of Including Labour Cess |
| 8 | Construction of 1000 mm dia, 600 mm dia Hume pipe Culvert and U-Drain workExcavation in foundation in B.C soil including lift up to 15 meterand lead upto 30 m (100 ft) and including filling, watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 Mfrom the foundation trenches.(S.I.No. 251) The Rate of Including Labour Cess |
| 9 | Sand filling in plinth including supply of necessaryquantityof sandfrom adistance not exceeding 8 Kmfrom the site of work & including watering, dressing etc. Rate to include cost of all materials, labour and tools & plants etc. required for proper completion of the work. (S.I.No. 255) The Rate of Including Labour Cess |
| 10 | Cement concrete with 4cm (1/2\"\") gauge approved stone ballast, approved coarse sand. cement in the proportion 1:4:8 including supply of all materials,labour and tools and plants etc. required for proper completion of the work.The Rate of Including Labour Cess |
| 11 | Class-150 brick work in 1:4 cement and fine sand of 1.25 fineness modulus mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. Required for proper completion of the work. The Rate of Including Labour Cess |
| 12 | Providing and laying reinforced concrete pipe NP3 in single row for culverts on \"Type A\" (Concrete cradle) bedding with M 15 grade cement concrete including fixing coller with cement mortar 1:2 but excuding excavation protrction work, backfilling, concrete and masonary works in head walls and parapets clause 1106 as per Data Book item No. 9.3 (B) 1000 mm Dai Hume Pipe. The Rate of Including Labour Cess |
| 13 | Providing and laying reinforced concrete pipe NP3 in single row for culverts on \"Type A\" (Concrete cradle) bedding with M 15 grade cement concrete including fixing coller with cement mortar 1:2 but excuding excavation protrction work, backfilling, concrete and masonary works in head walls and parapets clause 1106 as per Data Book item No. 9.3 (B) 600 mm Dai Hume Pipe. The Rate of Including Labour Cess |
| 14 | 12mm thick plaster on brick work minimum thickness not less than 10mm with 1part of cement and 4 part of find sand of 1.25 fineness modulus. As per SI. No.-584 The Rate of Including Labour Cess |
| 15 | Cement concrete with 2cm gauge approved stone ballast, approved coarse sand. cement in the proportion 1:2:4 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. The Rate of Including Labour Cess |
| 16 | Mild steel or iron wirk in plain work such as reinforced. Concrete or brick work (When not included in an over all rates) Wrought to required shape as necessary including binding for proper completion of the work and including supply of all steel wastage and over laping and hooks. The Rate of Including Labour Cess |
| 17 | RCC work with cementapproved coarse sand and 2cm. (3/4\"\") gauge approved stone ballast in the proportion 1:2:4 in lintels of doors and windows, excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.I wire.and including necessary cantering and suttering etc and also including supply of all materials,labour and tools and plants etc. required for proper completion of the work. binding wire to be supplied by the contractor free of cost. As in Item (283) above but in RCC 1:1.5:3 Slab As Per SI No. 288 The Rate of Including Labour Cess |