Bids Are Invited For Underwater Package1 - Carry Out Chemical Cleaning And Pressure Testing Of Stern Tube Hydraulic System Pipes Of Port And Stbd Side (Pipe Dia: 40 Mm, Length: 30 Mtr Each Side, Wp: 2 Bar). Mat-Seamless Steel Pipe Astm A53/ 106 Gr.A Sch. 40. Material – Firm Supply. , Steering Gear2 - Renew Hydraulic Oil In The Entire System After Cleaning And Flushing System. Hydraulic Oil Cg Supply. Oil -Cg Supply. Material – Firm Supply. , Bow Thruster, Pac Firm(M/S Kongsberg) Type: Ulstein Aquamarine, Model: Tcnc73/50-180, Qty: 01, Location: Bt Room3 - Bt Motor Cooler And Gear Box Cooler To Be Chemically Cleaned And Pressure Tested. In-Way Jobs Such As Replacement Of Worn-Out Fasteners, Drain Plug, Joints And Anodes Firm Supply.Spares-Cg Supply. , Under Water Valves4 - Following Under Water Butterfly Valves To Be Removed, Overhauled, Pressure Tested And Refitted. Overhauling Includes Replacement Of Valve Seat, Stem Seal/Packing, Stem Bushing/Bearings, Gasket And O-Ring To Sustain For One Operational Cycle. (Test Pressure 1.5 Times Of Working Pressure). Spares -Firm Supply . Material – Firm Supply. Sea Trunk(Mer & Dgr)300 Dn-2 Nos Sea Trunk(Mer & Dgr) 350 Dn -2 Nosmain S/W Pp 200 Dn -2 Nosaux S/W Pp 200 Dn -2 Noscentral Cooler 150 Dn -4 Nosfire & Gs Pump 150 Dn- 2 Nosbilge & Fire Pump 125 Dn -1 Nosballast Pump 150 Dn-1 Nosballast Pump 125 Dn- 1 Nosemergency Fire Pump 125 Dn -1 Nosa/C Sw Pump 150 Dn -2 Nosa/C Sw Pump 125 Dn -1 Nosro Plant 50 Dn- 1 Noshdg 65 Dn -1 Noshdg 65 Dn -1 Nosbilgesystem -125 Dn 1 Nosemergency Fire Pump -25 Dn 1 Nosoro 150 Dn -2 Noseductor No. 1 To 6 80 Dn -6 Noswhr Plant Sw Pump 80 Dn -4 Nosmagazine Flooding Valve 150 Dn -1 Nos , Under Water Valves5 - 02 Nos Under Water Fi-Fi Pump Suction Valves (Type: Butter Fly, Motorized, Size- 400 Dn) To Be Removed, Overhauled, Pressure Tested And Refitted. Overhauling Includes Replacement Of Valve Seat, Stem, Seal/Packing, Stem Bushing/Bearings, Gasket And O-Ring To Sustain For One Operational Cycle. (Test Pressure 1.5 Times Of Working Pressure). Spares -Firm Supply . , Equipment/System6 - Following Under Water Stop Valves/ Stop Nrv Valves Of Various Systems To Be Removed, Overhauled, Pressure Tested And Refitted. Overhauling Includes Replacement Of Valve Seat, Valve Lid, Gland Packing And Fasteners (Mat-Ss), To Sustain For One Operational Cycle. (Test Pressure 1.5 Times Of Working Pressure). Spares -Firm Supply Ref. Sw Pump 32 Dn - 1 Nosref. Sw Pump 40 Dn - 1 Nosobw Separator 40 Dn - 1 Nosro Plant 40 Dn - 3 Nosfi-Fi Pump 50 Dn - 2 Nosfire Pump 50 Dn - 2 Nosmagazine Flooding 200 Dn - 1 Nos , Location/System7 - Following Remote Operated Sea Trunk Under Water Valves With Pneumatic Actuator To Be Removed, Overhauled, Pressure Tested And Refitted. Overhauling Includes Replacement Of Valve Seat, Stem, Seal/Packing, Stem Bushing/Bearings, Gasket And O-Ring To Sustain For One Operational Cycle. Manual And Remote Operation Of Valves From Solenoid Valve Cabinets To Be Proved. (Test Pressure 1.5 Times Of Working Pressure). Spares -Firm Supply Sea Trunk(Mer & Dgr)300 Dn – 2 Nossea Trunk(Mer & Dgr) 350 Dn – 2 Nosfire/ Bilge Pump 125 Dn – 1 No , Location/System8 - Following Under Water Nr Flap Valves To Be Removed, Overhauled, Pressure Tested And Refitted. Overhauling Includes Replacement Of Valve Seat, Stem, Seal/Packing, Stem Bushing/Bearings, Gasket And O-Ring To Sustain For One Operational Cycle. Worn-Out Parts To Be Renewed. (Test Pressure 1.5 Times Of Working Pressure). Spares -Firm Supply Whr S/W 80 Dn – 2 Noshdg S/W 65 Dn – 1 Noscentral Cooler 150 Dn – 4 Nosa/C Sw System 125 Dn – 1 Nosballast Pump 125 Dn – 1 Nosbilge Pump 125 Dn – 1 Nos , Location/System9 - Following Sea Trunk Under Water Air Blowing (Stop) And Vent (Butterfly) Valves To Be Removed, Overhauled, Pressure Tested And Proved In The System. Overhauling Includes Replacement Of Valve Seat, Stem, Seal, Valve Lid, Packing, Stem Bushing/Bearings, Gasket And O-Ring To Sustain For One Operational Cycle. Worn-Out Parts To Be Renewed. (Test Pressure 1.5 Times Of Working Pressure). Spares -Firm Supply Sea Trunk(Dgr & Mer) 65 Dn – 4 Nosemer Fire Pump 50 Dn – 1 Nosfi-Fi Sea Chest 100 Dn – 2 Nosballast Pump 80 Dn – 1 Nossea Trunk(Dgr & Mer) 15 Dn – 4 Nos Sea Trunk(Dgr & Mer) 15 Dn – 4 Nosfi-Fi Sea Chest 35 Dn – 2 Nosfi-Fi Sea Chest 35 Dn- 2 Nossea Trunk(Dgr & Mer) 25 Dn – 2 Nos , Shafting For Main Propulsion, Pac Firm (M/S Kongsberg) : Make: Kamewa Ulstein, Model: 1500Aghc-Kp560, Qty: 02 Nos.10 - Chemically Clean And Pressure Test Plummer Block F/W Cooling System Pipes And Bearing Housing Cooling Chamber. Pipe Dia: 32Mm, Length: 20 Mtrs. In-Way Jobs Such As Replacement Of Adaptors, Couplings And Fasteners By Firm. (Test Pressure 1.5 Times Of Working Pressure). Firm To Undertake Cleaning And Pressure Testing Pipeline Only. Material Of Pipe- Seamless Precision Steel Pipe St.37.4 .Working Pressure-4 Bar. Material – Firm Supply. , Shafting For Main Propulsion, Pac Firm (M/S Kongsberg) : Make: Kamewa Ulstein, Model: 1500Aghc-Kp560, Qty: 02 Nos.11 - Clean And Pressure Test Pneumatic Air System Pipes. Length-20 Mtr, Dia-20 Mm Mat: Gi. Overhaul Air System Pneumatic Valves (Size-20 Mm, Qty-02 Nos). Air System Air Reducer Cum Lubricator (07/03 Bar) To Be Renewed. Qty-02 Nos. (Test Pressure 1.5 Times Of Working Pressure). Spares- Firm Supply . Material – Firm Supply. Material For Pipe -Seamless Precision Steel Tubes Din 2391 Working Pressure-4 Bar , Shafting For Main Propulsion, Pac Firm (M/S Kongsberg) : Make: Kamewa Ulstein, Model: 1500Aghc-Kp560, Qty: 02 Nos.12 - Plummer Block F/W Cooling System Valves Not Holding During Operation. To Be Overhauled. Type-Sdnr Valve,Size: 32Mm, Nos-10 Nos. Overhauling Includes Replacement Of Valve Seat, Stem, Seal, Valve Lid, Packing. (Test Pressure 1.5 Times Of Working Pressure). Test Report To Be Provided. Spares- Firm Supply. Material – Firm Supply. , Main Engine: Make: Bergen Engines, Type: B32:40-L6p, Capacity-3000 Kw At 750 Rpm Qty: 02 Nos. Location:Mer13 - Cooling Water Pre-Heater Pump And Motor To Be Overhauled. Renewal Of Material/Spares Is Under Firm Scope Of Supply. , Main Engine: Make: Bergen Engines, Type: B32:40-L6p, Capacity-3000 Kw At 750 Rpm Qty: 02 Nos. Location:Mer14 - Main Engine Room Sea Trunk (Lower/High) Strainer Badly Corroded And Eroded. To Be Renewed As Per Sample. (Mat-Brass Size- Ø350mm X 500Mm Qty-04 Nos). Strainer -Firm Supply. Material – Firm Supply. , Main Engine: Make: Bergen Engines, Type: B32:40-L6p, Capacity-3000 Kw At 750 Rpm Qty: 02 Nos. Location:Mer15 - Fuel Oil Flow Meter Provided On Fuel Piping Inlet To Both Main Engine (Capacity:80-2000 Lph) Indicating Erratic Reading. Flow Meter To Be Calibrated And Test Certificate To Be Provided.Spares-Cg Supply. Material – Firm Supply. , Main Engine: Make: Bergen Engines, Type: B32:40-L6p, Capacity-3000 Kw At 750 Rpm Qty: 02 Nos. Location:Mer16 - Clean And Pressure Test Charge Air Cooler Of Both Main Engine (Qty-02 Nos). Test Pressure- 6.0 Bar. Test Report To Be Provided.Material – Firm Supply. , Main Engine: Make: Bergen Engines, Type: B32:40-L6p, Capacity-3000 Kw At 750 Rpm Qty: 02 Nos. Location:Mer17 - Both Main Centralized Cooler Sea Water System Pipe Lines To Be Removed Chemically Cleaned And Pressure Tested. Mat-Cu-Ni, Dia-150 Nb, Length-20 Mtr, Test Pressure-04 Bar. Corroded Pressure And Temperature Gauge/Sensor Pockets To Be Renewed. Mat Firm Supply. , Reduction Gearbox, Make: Kamewa Ulstein,Type:1500 Aghc-Kpc560,Capacity-5700 Kw.Qty-02 Nos18 - Chemically Clean And Pressure Test Both Gearbox Oil Coolers.Make: Blocksma Heat Exchanger, Type: Shell/Tube, Testing Pressure Oil / Water Side: 24/15 Bar. , Main Diesel Generators: Make: Caterpillar Saral, Type: 3512-B, Qty: 04, Location: Dgr19 - Chemically Clean And Pressure Test F/W Cooling System Pipes Pipe Line Of All 04 Das. Pipe Dia: 100Mm, Length: 30 Mtrs. In-Way Jobs Such As Replacement Of Fasteners, Pressure Gauge /Temperaturegauge Pockets By Firm. Material Of Pipe -Seamless Steel Pipe Astm A53/A105 Gr. Bworking Pressure – 3.5 Bartest Pressure – 07 Bar , Harbour Diesel Generator: Make: Caterpillar Saral, Type: 3412-C, Qty: 01, Location: Mer20 - Chemically Clean And Pressure Test F/W Cooler, L/O Cooler And Charge Air Cooler. Renew Sacrificial Anode. Carry Out External Painting Of Cooler. Testing Pressure 1.5 Times Of Working Pressure. , Harbour Diesel Generator: Make: Caterpillar Saral, Type: 3412-C, Qty: 01, Location: Mer21 - Chemically Clean And Pressure Test S/W Cooling System Pipes Pipe Line Of Harbour Da. Pipe Dia: 80Mm, Length: 10 Mtrs. In-Way Jobs Such As Replacement Of Fasteners, Pressure Gauge /Temperature Gauge Pockets By Firm. Material Of Pipe : Cu-Ni 90/10 Ns 2504Working Pressure -04 Bartest Pressure -07 Bar , Emergency Diesel Generator: Make: Caterpillar Saral, Type: C9,Capacity-185 Kw,C, Qty:01, Location: Eda Compartment22 - Chemically Clean And Pressure Test Radiator. Carry Out External Painting. Material – Firm Supply. , Main Hp Air Compressor: Make: J.P.Sauer & Sohn, Type:Wp45l,Capacity-55M3/H At 30 Bar, Qty: 02, Location: Mer & Aer23 - Carry Out The Following Refit Routines On The Both Hp Air Compressors. Materials Firm Supply And Spares-Cgsupply :(I) Replace Complete Valves.(Ii) Inspect Piston Rings.(Iii) Replace Gudgeon Pins / Gudgeon Pins Bearings.(Iv) Remove Coupling. Check Flexible Gear Rim Of The Coupling For Damage. , Main Hp Air Compressor: Make: J.P.Sauer & Sohn, Type:Wp45l,Capacity-55M3/H At 30 Bar, Qty: 02, Location: Mer & Aer24 - Cooling Fins Of Intercooler And After Cooler Damaged. To Be Repaired.Materials Firm Supply And Spares-Cgsupply : , Main Hp Air Compressor: Make: J.P.Sauer & Sohn, Type:Wp45l,Capacity-55M3/H At 30 Bar, Qty: 02, Location: Mer & Aer25 - Functional Test Of Both Stage Relief Valves To Be Carried Out. A) Relief Valve Tp 08 Bar - 2 Nosb) Relief Valve Tp 31 Bar - 2 Nos Materials Firm Supply And Spares-Cgsupply : , Emergency Air Compressor: Make: J.P.Sauer & Sohn, Type:Wp15l -300, Qty: 01, Location: Emergency Dg Compartment26 - Carry Out The Following Refit Routines On The Emergency Air Compressor. Materials Andspares Firm Supply:(I) Change The Oil.(Ii) Air Filter Cartridge Replacement, Check All The Valves And Clean Condensate Separator.(Iii) Check The Piston, Piston Ring, And Cylinder(Iv) Check The Coupling, Drive Bearing(V) Check The Valves And Condensate Separator Materials Firm Supply And Spares-Cgsupply : , Diesel Engine For Emergency Air Compressor: Make: Hatz Diesel, Type:1D81, Qty: 01, Location: Emergency Dg Compartment27 - Carry Out Top Overhaul Of Diesel Engine For Emergency Air Compressor.Materials Firm Supply And Spares-Cgsupply : , Service Air Compressor: Make Alup Screw Comp., Type::Sck22-10Ma50/2005, Qty: 01, Location: Mer28 - Carry Out The Refit Routine Of Service Air Compressor. Materials Firm Supply And Spares-Cgsupply :(I) Check The Safety Valve.(Ii) Lubricate The Motor.(Iii) Overhaul Compressor. Renew Defective Parts.(Iv) Service Air Compressor Air And Fluid Heat Exchanger To Be Cleaned. , Oily Bilge Water Separator: Make: Rwo Water Tech, Type : Skit/Debi, 0Lw15ppm, Qty: 01, Location : Mer29 - Carry Out Following Refit Routines On Oily Water Separator.Materials Firm Supply And Spares-Cgsupply :(I) Open The Hand Hole,Open The Ows And The Absorber.(Ii) Check If There Is Sediment Sludge, Remove And Clean.(Iii) Renew Absorber Element. Check The Inside Coating, Repaint If Necessary.(Iv) Check Gasket Of Position Valve (Qty: 06 Nos.)(V) Clean The Electrode. If There Is Any Damage, Replace It.(Vi) Check The Function Of Heating Coil. Materials Firm Supply And Spares-Cgsupply : , Air Conditioning Plant:Make: Heinen And Hopman Engg India, Type: 5H 120 – A194, Qty: 02, Compressor Make : Carrier, Model5h-120, Cap 94 Tr Each30 - Carry Out Refit Routines On Both Air Conditioning Plants Through Oem/Authorised Firm. .Materials Firm Supply And Spares-Cgsupply :Overhaul Both Compressors. Carryout Inspection Of Valve Seats, Cylinder Liners, Pistons, Gudgeon Pins, Gudgeon Pin Bearings, Piston & Oil Scraper Rings, Oil Pump, And Shaft Seal. Renew Worn Out Parts. , Air Conditioning Plant:Make: Heinen And Hopman Engg India, Type: 5H 120 – A194, Qty: 02, Compressor Make : Carrier, Model5h-120, Cap 94 Tr Each31 - Carry Out Refit Routinesthrough Oem/Authorised Firm. .Materials Firm Supply And Spares-Cgsupply On Both Air Conditioning Plants. Material And Spares Firm Supply. Clean And Overhaul Oil Separators. Renew Worn Outparts.(Qty:02) , Air Conditioning Plant:Make: Heinen And Hopman Engg India, Type: 5H 120 – A194, Qty: 02, Compressor Make : Carrier, Model5h-120, Cap 94 Tr Each32 - Check Functioning Of Expansion Valvesthrough Oem/Authorised Firm. .Materials Firm Supply And Spares-Cgsupplyand Prove For Proper Functioning. Qty: 02 Each , Air Conditioning Plant:Make: Heinen And Hopman Engg India, Type: 5H 120 – A194, Qty: 02, Compressor Make : Carrier, Model5h-120, Cap 94 Tr Each33 - Overhaul Gas System Valves And Replace All Teflon Valve Seats And Prove For Proper Operation.Materials Firm Supply And Spares-Cgsupply :(A)Globe Valve4 1/8 - 02 Nos(B)Globe Valve3 1/8 -02 Nos(C)Globe Valve1 1/6 - 01 Nos(D)Non Return Valve 3 1/8 -02 Nos(E)Solenoid Valve With Coil 40 (2-1/8) - 02 Nos(F)Globe Valve2 1/8 - 14 Nos , Air Conditioning Plant:Make: Heinen And Hopman Engg India, Type: 5H 120 – A194, Qty: 02, Compressor Make : Carrier, Model5h-120, Cap 94 Tr Each34 - Recover Gas From System. Carry Out Pressure And Vacuum Test Of Entire Gas System On Completion Of Repairs. System To Be Charged With Fresh Gas. Prove The Plant For Satisfactory Performance. Type Of Gas: Freon 22, Qty: 150 Kg. Freon And Nitrogen / Co2 For Pressure Testing Firm Supply.Materials Firm Supply And Spares-Cgsupply : , Air Conditioning Plant:Make: Heinen And Hopman Engg India, Type: 5H 120 – A194, Qty: 02, Compressor Make : Carrier, Model5h-120, Cap 94 Tr Each35 - Inspect Loading And Unloading Mechanismthrough Oem/Authorised Firm. .Materials Firm Supply And Spares-Cgsupply . Performance To Be Proved During Plant Trials. , Air Conditioning Plant:Make: Heinen And Hopman Engg India, Type: 5H 120 – A194, Qty: 02, Compressor Make : Carrier, Model5h-120, Cap 94 Tr Each36 - Carry Out Functional Checks Of Liquid Solenoid Valvethrough Oem/Authorised Firm. .Materials Firm Supply And Spares-Cgsupply . , Air Conditioning Plant:Make: Heinen And Hopman Engg India, Type: 5H 120 – A194, Qty: 02, Compressor Make : Carrier, Model5h-120, Cap 94 Tr Each37 - Clean Three Ahu Units Completely And Check For Corrosion, Wear And Tear Of The Equipment. Check All Three Fan Shaft For Straightness And Drive Sheaves Are Secured Correctly. In-Way Job Includes As Internal And External Painting By Firm.Materials Firm Supply And Spares-Cgsupply :Paint Firm Supply , Air Conditioning Plant:Make: Heinen And Hopman Engg India, Type: 5H 120 – A194, Qty: 02, Compressor Make : Carrier, Model5h-120, Cap 94 Tr Each38 - Chemically Clean Evaporator Coils Of No. 1, 2 And 3 Ahus And Pressure Test. Model: Zeco Zs-80. Capacity Of Each Unit: 33Tr, 28.8 Tr, 18 Trmaterials Firm Supply And Spares-Cgsupply : , Air Conditioning Plant:Make: Heinen And Hopman Engg India, Type: 5H 120 – A194, Qty: 02, Compressor Make : Carrier, Model5h-120, Cap 94 Tr Each39 - Clean And Overhaul 05 Nos. Fcus. (Capacity: 2.5 Tr- 03 Nos, 2 Tr- 02 Nos).In-Way Job Includes As Renewal Of Drain Pipes.Materials Firm Supply , Air Conditioning Plant:Make: Heinen And Hopman Engg India, Type: 5H 120 – A194, Qty: 02, Compressor Make : Carrier, Model5h-120, Cap 94 Tr Each40 - Chemically Clean And Pressure Test Condenser, Chiller& Receiver (Qty: 02 Each). Tp: 25 Bar. Renew Corrosion Piece (Black Steel Pipe) Fitted In The Sea Water System (Qty: 02 Nos). Materials Firm Supply , Air Conditioning Plant:Make: Heinen And Hopman Engg India, Type: 5H 120 – A194, Qty: 02, Compressor Make : Carrier, Model5h-120, Cap 94 Tr Each41 - Chemically Cleaned And Inspect The Chilled Water Expansion Tank. In-Way Job Includes As Internal And External Painting Of Drain Plugs By Firm Painting By Ship Staff.Materials Firm Supply , Air Conditioning Plant:Make: Heinen And Hopman Engg India, Type: 5H 120 – A194, Qty: 02, Compressor Make : Carrier, Model5h-120, Cap 94 Tr Each42 - Remove, Overhaul And Pressure Test Following Chilled Water System Valves. Performance To Be Proved. Materials Firm Supplydescription Sizeqry Drain Valve12nb – 13 Nos G M Ball Valve 20Nb – 10 Nos G M Ball Valve 18Nb – 2 Nos(D) G M Ball Valve28nb – 3 Nos Butterfly Valve65nb – 2 Nosbutterfly Valve80nb – 4 Nos Butterfly Valve125nb – 8 Nos , Air Conditioning Plant:Make: Heinen And Hopman Engg India, Type: 5H 120 – A194, Qty: 02, Compressor Make : Carrier, Model5h-120, Cap 94 Tr Each43 - Motorised 3 Way Mixing Valve Provided On All Three Ahu Chiller System To Be Removed, Overhauled And Refitted. Performance Of Valve To Be Proved During Plant Trial. Make: Honeywell, Model: Ml 7421 A1033, 405 Lbf,¾ Inches Stroke: 1.5 Min Nsr. Materials Firm Supply Valve Size: 65Nb1 Novalve Size: 80Nb2 Nos , Air Conditioning Plant:Make: Heinen And Hopman Engg India, Type: 5H 120 – A194, Qty: 02, Compressor Make : Carrier, Model5h-120, Cap 94 Tr Each44 - Ac Compressor No.1 & 2 Suction And Discharge Side Vibration Eliminator Observed Ruptured. To Be Renewed As Per Sample Along With Couplings. (Size-4” X 24”). Qty-04 Nos. In-Way Job Includes As Brazing Of Eliminator Coupling With Pipe. Materials Firm Supply And Spares & Vibration Eliminator - Cg Supply. , Air Conditioning Plant:Make: Heinen And Hopman Engg India, Type: 5H 120 – A194, Qty: 02, Compressor Make : Carrier, Model5h-120, Cap 94 Tr Each45 - A/C Plant Sea Water System Pipe Lines To Be Removed, Chemically Cleaned And Pressure Tested And Fitted Back. Mat-Cu Ni, 150 Nb, Length -30 Mtr. Test Pressure-07 Bar. Material Firm Supply , Air Conditioning Plant:Make: Heinen And Hopman Engg India, Type: 5H 120 – A194, Qty: 02, Compressor Make : Carrier, Model5h-120, Cap 94 Tr Each46 - A/C Plant Chilled Water System Pipe Lines To Be Removed, Chemically Cleaned And Pressure Tested And Fitted Back. Mat-Cu Ni. Test Pressure-07 Bar. In-Way Job Includes As Renewal Of Cold Lagging. Material Firm Supplya) Dia:80Mm, Length -100 Mtr.B) Dia-40Mm, Length-50 Mtr. , Refrigeration Plant : Make: Bitzer, Type: 4N.2, Qty: 02, Location: Ac Room47 - Carry Out Following Refit Routines On Both Refrigeration Plant. Materials Firm Supply And Spares - Cg Supply..Check Lub Oil Pump Bearings On Compressors, Renew If Required. , Refrigeration Plant : Make: Bitzer, Type: 4N.2, Qty: 02, Location: Ac Room48 - Check The Cylinders And Pistonsfor Scoring Marks ,Renew If Required Materials Firm Supply And Spares - Cg Supply , Refrigeration Plant : Make: Bitzer, Type: 4N.2, Qty: 02, Location: Ac Room49 - Check All Alarms, Safeties, Relays , Pressure Gauges/Switches Including Pumps Gauges (04 Nos),Renew If Required. Materials Firm Supply And Spares - Cg Supply , Refrigeration Plant : Make: Bitzer, Type: 4N.2, Qty: 02, Location: Ac Room50 - Chemically Clean The Condenser And Pressure Test. Zinc Anodes In The System To Be Renewed. (Qty: 02 Each). Testing Pressure: 25 Bar. Corrosion Pieces (02 Number) Fitted In System Pipe To Be Renewed. Dia 40 Mm , Length 30 Mm. Anode – Firm Supply. , Refrigeration Plant : Make: Bitzer, Type: 4N.2, Qty: 02, Location: Ac Room51 - Overhaul The Sea Water System Valve Fitted In The System. Materials Firm Supply Sdsl Valve (50 Mm) 02 Nossdnr Valve (50 Mm) 06 Nos , Refrigeration Plant : Make: Bitzer, Type: 4N.2, Qty: 02, Location: Ac Room52 - Overhaul Following Gas Valves And Replace The Teflon Seats And Prove For Proper Operation. Materials Firm Supply Safety Valve On Condenser ½ 02 Nosvalve On Condenser (Inlet/Outlet)½ 04 Nossafety Valve On Receiver ½ 01 Nos Globe Valve(Brassomatic) 5/8 06 Nos Angle Charging Valve 5/8 01 Nos Solenoid Valve 5/8 01 Nos Valve¼ 03 Nosvalve ½ 04 Nosnon Return Valve(Danfoss) 7/802 Nosnon Return Valve(Danfoss) 5/802 Nos Solenoid Valve(Danfoss)½ Evr -10 01 Nos Solenoid Valve (Danfoss)3/8 Evr -0603 Nosnon Return Valve(Danfoss)7/801 Nos Evaporator Pressure Regulator ½02Nosevaporator Pressure Regulator 3/8 01 Nosvalve 7/801 Nos Valve 3/801 Nos , Refrigeration Plant : Make: Bitzer, Type: 4N.2, Qty: 02, Location: Ac Room53 - Carry Out Functional Checks Of Thermostatic Expansion Valve And Liquid Solenoid Valves Of Cold Room, Cool Room, Dry Provision Store And Daily Provisional Store. Renew As Required. Make: Danfoss, Type: Tex-2, Qty:04 . Material Firm Supply , Refrigeration Plant : Make: Bitzer, Type: 4N.2, Qty: 02, Location: Ac Room54 - Clean Evaporator Coil Of Cold/ Cool Rooms, Provision Store And Dry Provisional Store And Pressure Test. Test Pressure-04 Bar Materials Firm Supply And Spares - Cg Supply , Refrigeration Plant : Make: Bitzer, Type: 4N.2, Qty: 02, Location: Ac Room55 - Recover Gas From System. Carry Out Pressure And Vacuum Test Of Entire Gas System On Completion Of Repairs On Plant. System To Be Charged With Fresh Gas. Prove The Plant For Satisfactory Performance. Type Of Gas: Freon 22, Qty: 61 Kg. Freon And Nitrogen / Co2 For Pressure Testing Firm Supply. Materials Firm Supply And Spares - Cg Supply , Refrigeration Plant : Make: Bitzer, Type: 4N.2, Qty: 02, Location: Ac Room56 - Ref Plant Sea Water System Pipe Lines To Be Removed Chemically Cleaned And Pressure Tested And Fitted Back. Mat-Cuni, 30 Nb, Length-20 Mtr. Test Pressure-06 Bar. Material Firm Supply , A/C Plant& Fcu (Make- M/S Henin & Hopman, Kolkata)57 - Overhaul 02 In No Motors 415 V, 3 Phase, 50 Hz, 97 Kw, (Make- Bharat Bijilee Ltd, Model- Ma 31S413). Overhauling Includes Record Of Insulation Prior Dismantling Ofmotor And Withdraw Rotor, Renewal Of De/Nde Ball Bearing (Skf- 6319/C3 & Nu319ecj/C3), Painting Ofheat Resistive Paint On External/Internal Of Yoke, Applyof Varnish And Baking Up, Renewal Of All Consumable, Recording Of Insulation And Proving Of Motor For Satisfactory Operation On Completion Of Overhauling.(Maintenance Schedule No. Lp-15) Materials Firm Supply And Spares - Cg Supply , A/C Plant& Fcu (Make- M/S Henin & Hopman, Kolkata)58 - 01 In No Volt Meter (0 - 500 V) & 01 In No Ammeter (0 – 1200 A) To Be Calibrated. Renew Instruments Not Within Limit. Calibration Certificate To Be Handed Over To Ship. Materials Firm Supply And Spares - Cg Supply Firm To Provide Calibration Certificate. , A/C Plant& Fcu (Make- M/S Henin & Hopman, Kolkata)59 - Overhaul 02 In No. Star Delta Starter Control Panel For Both A/C Motor (Consist Of 03 Sections). Servicing Of Following Main And Aux. Contractor, Calibrate Overload Relay, Cut Out And Renew Defective Components Not Within Limits. Starter To Be Proved For Satisfactoryoperationoncompletionwithmotor.Recordstartingandrunning Current. Calibration Certificate With Limits To Be Handed Over To Ship Staff. (Maintenance Schedule No. Lp-15) Materials Firm Supply And Spares - Cg Supply Firm To Provide Calibration Certificate.Magnetic Contactor 115Alc 1-D115 6M5 04Nosmagnetic Contactor65a Lc 1-D 65 02 Nosoverload Relaylr 9F 5369 02 Nostime Delay Relay La Dt2 02 Noscontrol Transformer415/230 V, 500 Va01 Nosea Water Cut Outwfs 1001 H01 Nooil Pressure Cut Out Danfoss Mp 5502 Noslp Cut Out Danfoss Kp 102 Noshp Cut Outdanfoss Kp 502 Nosthermostat Cut Out Danfoss Kp 6902 Nosanti Freezer Cut Outdanfoss Kp 6102 Nos , A/C Plant& Fcu (Make- M/S Henin & Hopman, Kolkata)60 - Overhaul 07 No. Motor Mentioned Under. Overhauling Includes Overhauling Includes Record Of Insulation Prior Dismantling Of Motor And Withdrawal Of Rotor, Renewal Of De/Nde Ball Bearing (As Mentioned Against Each), Painting Ofheat Resistive Paint On External/Internal Of Yoke, Apply Of Varnish And Baking Up, Renewal Of All Consumable, Recording Of Insulation And Proving Of All Motor For Satisfactory Operation On Completion Of Overhauling. (Maintenance Schedule No. Lp-15).(A)Atu(Ahu) -1 & 2 Motor, M/S Zeco Aircorn 6208-Zz(415 V, 50Hz, 3Phase, 11 Kw) Industries Model- Zds-80 & Zds- 70 Sl- Fmu- 6-7/372 & Fmu-6-7/370 - 2 Nos (B) Atu(Ahu) -3 Motor ,M/S Zeco Aircorn6208-Zz (415 V, 50 Hz,Industries Model- Zds 3Phase, 5.5 Kw) -01No (C) Chilled Water Pump , M/S Brook Crompton 6308-Zzmotor (415 V, 50 Hz,Iec-34-1 3Phase, 9 Kw) - 02Nos(D)Sw Cooling Pump, 6308-Zzmotor (415 V, 50 Hz,3Phase, 9 Kw) - 02Nos Materials Firm Supply And Spares - Cg Supply Firm , A/C Plant& Fcu (Make- M/S Henin & Hopman, Kolkata)61 - Overhaul Starter Control Panel For Both A/C Motor (Consist Of 03 Sections). Servicing Of Following Main And Aux. Contractor, Calibrate Overload Relay, Cut Out And Renew Defective Components Not Within Limits. Starter To Be Proved For Satisfactory Operation On Completion With Motor. Record Starting And Running Current. Calibration Certificate With Limits To Be Handed Over To Ship Staff.(A)Atu(Ahu) Control Panel - 03Nos, Starter Consist Of Operating Coil 220240Vac Withaux Contact (1No+1Nc), Qty-03 Nos,230 Vac Relay (Rsb2a080p7s)2 C/O With Led & Base Along With Clamp, Qty-09 Nos, Timer ( Lad T2, 0.1 – 30 S), Qty –03 Nos,Control Transformer (415/230/24 V, 75 V), Qty-03Nos(B) Chilled Water Pump Motor(9Kw) 02Nos,Starter Consist Ofcontactor(Lc1-D25m7,Rated25a) With Operating Coil 220- 240Vac(1No+1Nc), Qty-02 Nos,230 V Ac Relay(Rsb2a080p7s), 2 C/Owith Led & Base Along With Clamp Qty-06 Nos,Olr ( 16-24 A),Qty-02 No, Transformer 1 Ph Double Wound 415/230 V, 50 Va- Qty- 02 Nosmaterials Firm Supply And Spares - Cg Supply Firm To Provide Calibration Certificate. , Ref Plant (M/S Henin & Hopman, Kolkata) Qty -02 Nos62 - Overhaul 02 In No Motors 415 V, 3 Phase, 50Hz, 11Kw, (Make- Bharat Bijilee Ltd, Model- Ma 31S413). Overhauling Includes Record Of Insulation Prior Dismantling Of Motor And Withdraw Rotor, Renewal Of De/Nde Ball Bearing (Skf- 6319/C3 & Nu319ecj/C3), Painting Ofheat Resistive Paint On External/Internal Of Yoke, Apply Of Varnish And Baking Up, Renewal Of All Consumable, Recording Of Insulation And Proving Of Motor For Satisfactory Operation On Completion Of Overhauling. (Maintenance Schedule No. Lp-16) Materials Firm Supply And Spares - Cg Supply Firm , Ref Plant (M/S Henin & Hopman, Kolkata) Qty -02 Nos63 - Overhaul 02 In No. Star Delta Starter Control Panel For Both Ref Plant Motor (Consist Of 02 Sections). Servicing Of Following Main And Aux. Contractor, Calibrate Overload Relay, Cut Out And Renew Defective Components Not Within Limits. Starter To Be Proved For Satisfactory Operation On Completion With Motor. Record Starting And Running Current. Calibration Certificate With Limits To Be Handed Over To Ship.(A) Magnetic Contactor Lc 1K0901m7 11 Nos(B) Overload Relay Lr 2K032102 Nos(C) Overload Relaylr 2K030702 Nos(D) Overload Relaylr 2K0306 01 No(E) Overload Relay Lr 2K0305 01 No(F)Time Delay Relay La 2Kt2u02 Nos(G)Control Transformer 415 V/230 V, 300 Va 01 No(H)Sea Water Cut Outwfs 1001 H 01 No(I) Oil Pressure Cut Out Danfoss Mp 55 02 Nos(J) Lp Cut Outdanfoss Kp 1 02 Nos(K)Hp Cut Outdanfoss Kp 502 Nos(L) Thermostat Cut Outdanfoss Kp 5 06 Nosmaterials Firm Supply And Spares - Cg Supply Firm , Ref Plant (M/S Henin & Hopman, Kolkata) Qty -02 Nos64 - Overhaul 02 In No Sw Cooling Pump Motors 415V, 3Phase, 50Hz, 0.75Kw, (Make- Garbarino, Italy Model- Bnm25-125). Overhauling Includes Record Of Insulation Prior Dismantling Of Motor And Withdraw Rotor, Renewal Of De/Nde Ball Bearing (Skf-6204-Zz), Painting Ofheat Resistive Paint On External/Internal Of Yoke, Apply Of Varnishandbakingup, Renewalofallconsumable,Recording Of Insulationand Provingofmotorforsatisfactoryoperationoncompletionofoverhauling. Materials Firm Supply And Spares - Cg Supply , Ref Plant (M/S Henin & Hopman, Kolkata) Qty -02 Nos65 - 04Innoblowerunit(09Innofans230v,1Phase50hz,225W)Tobe Overhaul/Serviced. {Cold Room 03 Nos Fan, Cool Room 02 Nos Fan, Provision Store 03 Nos Fan And Daily Provision Room 01 In No Fan} Materials Firm Supply And Spares - Cg Supply , Ro Plant:Make: Rochem, Type: Ro1530 Dto4-20S, Qty: 03, Location: Gear Room66 - All Three Ro Plant Sea Water System Pipe Lines To Be Removed, Chemically Cleaned And Pressure Tested And Fitted Back. Mat-Cuni, Test Pressure-08 Bar. Material Firm Supply50 Nb-15 Mtr 25 Nb- 20 Mtrs. , Ro Plant:Make: Rochem, Type: Ro1530 Dto4-20S, Qty: 03, Location: Gear Room67 - Air Valve And Reducer For Air Back Washing For Ro Plant 1,2 And 3 Not Holding. To Be Overhauled And Proved In The System.Strainer– Firm Supply. Material Firm Supply , Ro Plant:Make: Rochem, Type: Ro1530 Dto4-20S, Qty: 03, Location: Gear Room68 - Ro Plant Pk-20 Pump Sea Chest Strainer Eroded And Deteriorated. To Be Renewed As Per Sample. Qty-03 No, Mat-Brass, Size- Ø100mmx150mm. Strainer– Firm Supply. , Ro Plant:Make: Rochem, Type: Ro1530 Dto4-20S, Qty: 03, Location: Gear Room69 - Ro Plant Pk-20 Pump Suction Valve And Discharge Valves Not Holding.Tobe Renewed. Type-Ball Valve-06 Nos. Size-25 Mm. Materials Firm Supply And Spares And Valve – Cg Supply , Fixed Local Water Mist System: Make-Tyco, Type-913 System (Asp) Pac Firm:M/S Tyco Fire And Security Indiapvt Ltd, Thane.70 - Chemically Clean And Pressure Test Of System Pipe Lines Including Galvanizing. Pipe Length:08 Mtrs, Pipe Dia- 30Mm. Mat-Ms. Material Firm Supply , Fixed Local Water Mist System: Make-Tyco, Type-913 System (Asp) Pac Firm:M/S Tyco Fire And Security Indiapvt Ltd, Thane.71 - Following Automatic And Manual Valves Are To Be Overhauled, Functionally Tested And Proved. Material Firm Supply30 Mm Sdsl-03 Nos 30 Mm Nr Valve- 02 No.30 Mm Ball Valve- 02 No. , Water Mist Pump: Make: Grundfos, Type: Crs – 22A-Fgj-A-E-Hqqe, Capacity: 6.9 M3/H At 25 Bar, Qty: 01, Location: Asp72 - Overhaul The Pump. Change Mechanical Seal And Other Worn Out Parts. On Completion, Pump Is To Be Tested For Proper Flows And Pressure. Materials And Sparesexcept Impeller And Shaft Firm Supply. . Firm To Undertake Through Pac , S/W Cooling Pump (Aux) : Make: Pompe Garbarnio, Model: Mu125/250Me, Capacity: 148M3/H At 1450 Rpm 19 Kw, Qty: 02, Location: Dgr73 - Overhaul Pump, Check Alignment Of Pump With Motor And Replace Necessary Spares. Renew Bearing, Wear Rings, Mechanical Seal And Foundation Bolts. Paint Pump Casing Internally And Externally. Performance Of Pump To Be Proved Post Overhauling. Material Andspares Except Shaft & Impeller Firm Supply. , S/W Cooling Pump (Aux) : Make: Pompe Garbarnio, Model: Mu125/250Me, Capacity: 148M3/H At 1450 Rpm 19 Kw, Qty: 02, Location: Dgr74 - Overhaul Air Ejector System Inclusive Of Solenoid Valve & Pressure Feedback. Materials Andspares Firm Supply , S/W Cooling Pump (Aux) : Make: Pompe Garbarnio, Model: Mu125/250Me, Capacity: 148M3/H At 1450 Rpm 19 Kw, Qty: 02, Location: Dgr75 - Pump Suction And Discharge Pressure Gauges Showing Erratic Reading. Gauges To Be Renewed (Range: -1 To 3 Bar. Qty-02 Nos, 0-10 Bar, Qty-02 Nos). Job Includes As Renewal Of Pressure Gauge Line And Isolating Cocks. Gauge Line Length-04 Mtr,Dia-08 Mm ,Nos Of Cocks-04 Nos.Gauges – Cg Supply. Material Firm Supply , S/W Cooling Pump(Main) :Make: Pompe Garbarnio, Type: Mu125/250Me, Capacity: 159 M3/H At 1450 Rpm, Qty: 02, Location: Mer76 - Overhaul Pump, Check Alignment Of Pump With Motor And Replace Necessary Spares. Renew Bearing, Wear Rings, Mechanical Seal And Foundation Bolts. Paint Pump Casing Internally And Externally. Performance Of Pump To Be Proved Post Overhauling. Materials Andspares Except Shaft &Impeller Firm Supply. , S/W Cooling Pump(Main) :Make: Pompe Garbarnio, Type: Mu125/250Me, Capacity: 159 M3/H At 1450 Rpm, Qty: 02, Location: Mer77 - Overhaul Air Ejector System Inclusive Of Solenoid Valve & Pressure Feedback. Materials And Spares Firm Supply. , S/W Cooling Pump(Main) :Make: Pompe Garbarnio, Type: Mu125/250Me, Capacity: 159 M3/H At 1450 Rpm, Qty: 02, Location: Mer78 - Pump Suction And Discharge Pressure Gauges Showing Erratic Reading. Gauges To Be Renewed (Range: -1 To 3 Bar, Qty-02 Nos, 0-10 Bar, Qty-02 Nos). Job Includes As Renewal Of Pressure Gauge Line And Isolating Cocks. Gauge Line Length-04 Mtr,Dia-08 Mm ,Nos Of Cocks-04 Nos. Gauges – Cg Supply. Material Firm Supply , Lt F/W Circulating Pump:Make: Pompe Garbarnio, Type: Mu65/160M, Capacity: 65M3/H At 3.5 Bar,2930 Rpm, Qty: 04, Location: 02 Each In Mer And Dgr79 - Overhaul Pump.Check Alignment Of Pump With Motor And Replace Necessary Spares. Renew Bearing, Wear Rings, Mechanical Seal And Foundation Bolts. Paint Pump Casing Internally And Externally. Performance Of Pump To Be Proved Post Overhauling. Materials And Spares Except Shaft &Impeller Firm Supply. , Lt F/W Circulating Pump:Make: Pompe Garbarnio, Type: Mu65/160M, Capacity: 65M3/H At 3.5 Bar,2930 Rpm, Qty: 04, Location: 02 Each In Mer And Dgr80 - Pump Suction And Discharge Pressure Gauges Showing Erratic Reading. Gauges To Be Renewed (Range: -1 To 3 Bar. Qty-04 Nos, 0-10 Bar, Qty-04 Nos). Job Includes As Renewal Of Pressure Gauge Line And Isolating Cocks. Gauge Line Length-08 Mtr,Dia-08 Mm ,Nos Of Cocks-08 Nos. Gauges – Cg Supply. Material Firm Supply , Lt F/W Back Up Circulating Pump:Make: Pompe Garbarnio, Type: Nism-65-160 Ø 164, Type: 95M3/H At 2900 Rpm, Qty: 01, Location: Mer81 - Overhaul Pump, Check Alignment Of Pump With Motor And Replace Necessary Spares. Renew Bearing, Wear Rings, Mechanical Seal And Foundation Bolts. Paint Pump Casing Internally And Externally. Performance Of Pump To Be Proved Post Overhauling. Materials And Spares Except Shaft &Impeller Firm Supply. , Lt F/W Back Up Circulating Pump:Make: Pompe Garbarnio, Type: Nism-65-160 Ø 164, Type: 95M3/H At 2900 Rpm, Qty: 01, Location: Mer82 - Pump Suction And Discharge Pressure Gauges Showing Erratic Reading. Gauges To Be Renewed (Range: -1 To 3 Bar. Qty-01 No, 0-10 Bar, Qty-01 No). Job Includes As Renewal Of Pressure Gauge Line And Isolating Cocks. Gauge Line Length-02 Mtr,Dia-08 Mm ,Nos Of Cocks-02 Nos. Gauges – Cg Supply. Material Firm Supply , Fire And Gs Pump: Make – Pompe Garbarnio, Type – Mu 65-250 M, Capacity – 100M3/H,Quantity-02,Location: Mer & Dgr83 - Overhaul Pumps, Check Alignment Of Pump With Motor And Replace Necessary Spares. Renew Bearing, Wear Rings, Mechanical Seal And Foundation Bolts. Paint Pump Casing Internally And Externally. Performance Of Pump To Be Proved Post Overhauling. Materials And Spares Except Shaft & Impeller Firm Supply. , Fire And Gs Pump: Make – Pompe Garbarnio, Type – Mu 65-250 M, Capacity – 100M3/H,Quantity-02,Location: Mer & Dgr84 - Overhaul Air Ejector System Inclusive Of Solenoid Valve & Pressure Feedback. Materials And Spares Firm Supply. , Fire And Gs Pump: Make – Pompe Garbarnio, Type – Mu 65-250 M, Capacity – 100M3/H,Quantity-02,Location: Mer & Dgr85 - Fire And Gs Pump In Dgr And Mer Discharge Diffuser Pipe Eroded And Thinned. Pipe To Be Fabricated As Per Sample. Pipe Dia 65/100Mm, Length- 3 Feet, Mat – Seamless Steel, Astm A53/ A106 Gr B.Qty-02 Nos. Spares – Firm Supply Material-Firm Supply. , Chilled Water Pump: Make: Pompe Garbarnio, Type: Mu50/160M, Capacity: 60M3/H At 9 Kw, 3 Bar, Qty: 02, Location: A/C Compt.86 - Overhaul Pump, Check Alignment Of Pump With Motor And Replace Necessary Spares. Renew Bearing, Wear Rings, Mechanical Seal And Foundation Bolts. Paint Pump Casing Internally And Externally. Performance Of Pump To Be Proved Post Overhauling. Materials Andspares Except Shaft &Impeller Firm Supply. , Chilled Water Pump: Make: Pompe Garbarnio, Type: Mu50/160M, Capacity: 60M3/H At 9 Kw, 3 Bar, Qty: 02, Location: A/C Compt.87 - Overhaul Air Ejector System Inclusive Of Solenoid Valve & Pressure Feedback. Materials And Spares Firm Supply. , Bilge And Fire Pump: Make: Pompe Garbarnio, Type: Mu65/200Me, Capacity: 55M3/H At 2900 Rpm, 22 Kw, Qty: 01,Location : Dgr88 - Overhaul Pump, Check Alignment Of Pump With Motor And Replace Necessary Spares. Renew Bearing, Wear Rings, Mechanical Seal And Foundation Bolts. Paint Pump Casing Internally And Externally. Performance Of Pump To Be Proved Post Overhauling. Materials Andspares Except Shaft &Impeller Firm Supply. , Bilge And Fire Pump: Make: Pompe Garbarnio, Type: Mu65/200Me, Capacity: 55M3/H At 2900 Rpm, 22 Kw, Qty: 01,Location : Dgr89 - Overhaul Air Ejector System Inclusive Of Solenoid Valve & Pressure Feedback. Materials Firm Supply And Spares Cg Supply. , A/C Condenser Pump: Make: Pompe Garbarnio, Type: Mu65/250M, Capacity: 80M3/H At 1450 Rpm, 09 Kw, Qty: 02 , Location:Dg Room90 - Overhaul Pump, Check Alignment Of Pump With Motor And Replace Necessary Spares. Renew Bearing, Wear Rings, Mechanical Seal And Foundation Bolts. Paint Pump Casing Internally And Externally. Performance Of Pump To Be Proved Post Overhauling. Materials And Spares Except Shaft & Impeller Firm Supply. , A/C Condenser Pump: Make: Pompe Garbarnio, Type: Mu65/250M, Capacity: 80M3/H At 1450 Rpm, 09 Kw, Qty: 02 , Location:Dg Room91 - Overhaul Air Ejector System Inclusive Of Solenoid Valve & Pressure Feedback. Materials Firm Supply And Spares Cg Supply. , A/C Condenser Pump: Make: Pompe Garbarnio, Type: Mu65/250M, Capacity: 80M3/H At 1450 Rpm, 09 Kw, Qty: 02 , Location:Dg Room92 - Ac Condenser Pump Discharge Diffuser Pipe Eroded And Thinned. Pipe To Be Fabricated As Per Sample. Pipe Dia 65/100Mm, Length- 3 Feet, Mat – Seamless Steel, Astm A53/ A106 Gr B.Qty-02 Nos. Material And Pipe– Firm Supply. , Ref Condenserpump:Make: Pompe Garbarnio, Type: Bnm 25/125 Be-V, Capacity: 3M3/H, 50 L/M At 2900 Rpm, Qty: 02, Location: Dgr93 - Overhaul Pump, Check Alignment Of Pump With Motor And Replace Necessary Spares. Renew Bearing, Wear Rings, Mechanical Seal And Foundation Bolts. Paint Pump Casing Internally And Externally. Performance Of Pump To Be Proved Post Overhauling. Materials Andspares Except Shaft &Impeller Firm Supply. , Hydrophore Pump, Make: Pompe Garbarnio, Type: Bt403v, Capacity: 10M3/H At 5.5Kw, Qty: 02, Loc Ation:Gear Room94 - Overhaul Pump, Check Alignment Of Pump With Motor And Replace Necessary Spares. Renew Bearing, Wear Rings, Mechanical Seal And Foundation Bolts. Paint Pump Casing Internally And Externally. Performance Of Pump To Be Proved Post Overhauling. Materials Andspares Except Shaft &Impeller Firm Supply. , Domestic Hot Water Circulating Pump: Make: Pompe Garbarnio, Type: Nm 1 /Ae, Capacity: 02 M3/H,0.37 Kw, Qty: 01, Location: A/C Compt.95 - Overhaul Pump, Check Alignment Of Pump With Motor And Replace Necessary Spares. Renew Bearing, Wear Rings, Mechanical Seal And Foundation Bolts. Paint Pump Casing Internally And Externally. Performance Of Pump To Be Proved Post Overhauling. Materials Andspares Except Shaft &Impeller Firm Supply. , Jet Water Circulating Pump: Make: Pompe Garbarnio, Type: Nm3/Ae, Capacity: 05 M3/H ,2.2Kw, Qty: 01, Location: Gear Room96 - Overhaul Pump, Check Alignment Of Pump With Motor And Replace Necessary Spares. Renew Bearing, Wear Rings, Mechanical Seal And Foundation Bolts. Paint Pump Casing Internally And Externally. Performance Of Pump To Be Proved Post Overhauling. Materials And Spares Except Shaft & Impeller Firm Supply. , Fuel Oil Transfer Pump: Make: M/S Allweiler, Type: Trilub210r-46 Vw115 Ice 132, Qty: 02, Location : Gear Room97 - Overhaul Both Fuel Transfer Pumps. Check Alignment Of Pump With Motor And Replace Necessary Spares. Renew Bearing, Couplings Mechanical Seal And Foundation Bolts. Functional Check Of Pressure Relief Valves To Be Carried Out. Performance Of Pump To Be Proved Post Overhauling. Materials Andspares Except Main Screw Firm Supply. , Lub Oil Transfer Pump: Make: Allweiler, Type:Trilub-080R 36- U-18Usvw115ie, Qty: 03, Location : Gear Room,Dg Room & Mer98 - Overhaul All Lub Oil Transfer Pumps. Check Alignment Of Pump With Motor And Replace Necessary Spares. Renew Bearing, Coupling, Mechanical Seal And Foundation Bolts. Functional Check Of Pressure Relief Valves To Be Carried Out. Performance Of Pump To Be Proved Post Overhauling. Materials Andspares Except Main Screw Firm Supply. , Bilge Pump :Make: Allweiler Ag, Type: Aebil2701zf 100-C 106 M4,Capacity: 12.7 Kw 73M3/Hr, Qty: 01, Location: Mer99 - Overhaul Bilge Pump, Check Alignment Of Pump With Motor And Replace Necessary Spares. Renew Bearing, Coupling, Mechanical Seal And Foundation Bolts. Functional Check Of Pressure Relief Valves To Be Carried Out. Performance Of Pump To Be Proven Post Overhauling. Materials Andspares Except Main Screw Firm Supply. , Sludge Pump, Make: Allweiler Ag, Type: Techflow -101/11Pk 4Yp, Capacity: 5M3/H, Qty: 01, Location: Mer100 - Overhaul Sludge Pump, Check Alignment Of Pump With Motor And Replace Necessary Spares. Renew Bearing, Coupling, Mechanical Seal And Foundation Bolts. Functional Check Of Pressure Relief Valves To Be Carried Out. Performance Of Pump To Be Proved Post Overhauling. Materials Andspares Except Main Screw Firm Supply. , Emergency Fire Pump: Make – Allweiler Ag, Type –Nb 040-200/205-U3 1D-W3—Iec 160, Capacity –34 M3 At 6 Bar, Quantity- 01, Location: Below Fwd Storage Hold Stbd Side101 - Overhaul Pump. Check Alignment Of Pump With Motor And Replace Necessary Spares. Renew Bearing, Coupling, Mechanical Seal, And Foundation Bolts. Paint Pump Casing Internally And Externally. Functional Check Of Pressure Relief Valves To Be Carried Out. Performance Of Pump To Be Proven Post Overhauling. Materials Andspares Except Main Screw Firm Supply. , Steering Gear : Make:Tenfjord, Type: 2 X Sr662-Fcp280, Qty: 02, No Of Pump: 04, Location:Asp102 - Clean And Repaint Storage Tank (Capacity- 500 Ltrs) And Power Pack Header Tanks (Capacity- 08 Ltrs,02Nos). Paint – Firm Supply. , Steering Gear : Make:Tenfjord, Type: 2 X Sr662-Fcp280, Qty: 02, No Of Pump: 04, Location:Asp103 - Clean And Pressure Test Hydraulic System Pipelines Of Steering Gear System. Job Includes As Renewal Of Fasteners, End Connectors And Ferrules.(A) Length-25 Mtr,Dia-32Mm (B) Length-10 Mtr Dia-20Mm.Material Firm Supply , Helideck Foam System:Make: Tyco, Type : Tyco – Hed – 04, Capacity : 300 Ltrs For 10 Min, 2000 Ltrs/ Min104 - (I) Chemical Cleaning & Pressure Testing Of System Pipe Lines. Dia: 80 Mm, Length: 20 M, Mat: Ms. Test Pressure-10 Bar. In-Way Job Includes As Renewal Of Fasteners And Joints.Material Firm Supply(Ii) Overhauland Pressure Test Of System Valves; Size: 80Mm, Type: Butterfly, Qty: 04 Nos. In-Way Job Includes As Renewal Of Fasteners And Joints.Material Firm Supply , Whr Plant: Make: Techno Process, Type: 10 Tpd, Qty: 02, Location: Dgr & Gear Room105 - Overhaul And Pressure Test All Sw System Valves (Type: Butter Fly Valve, Qty:02, 80Mm) And Shell Drain Valve. (25 Mm Ball Valve, Qty-02 Nos).Material Firm Supply , Whr Plant: Make: Techno Process, Type: 10 Tpd, Qty: 02, Location: Dgr & Gear Room106 - Chemically Clean And Pressure Test Sea Water System Pipe Line Of Both Whr Plant. Length-20 Mtr, Dia 80Mm, Mat-Cuni.Test Pressure-7 Bar. In-Way Job Includes As Renewal Of Fasteners And Joints. Material Firm Supply , Whr Plant: Make: Techno Process, Type: 10 Tpd, Qty: 02, Location: Dgr & Gear Room107 - Chemically Clean And Pressure Test Fresh Water System Pipe Line Of Both Whr Plant. Length-20 Mtr, Dia 50Mm.Test Pressure-7 Bar. In-Way Job Includes As Renewal Of Fasteners And Joints. Material Firm Supply , Whr Plant: Make: Techno Process, Type: 10 Tpd, Qty: 02, Location: Dgr & Gear Room108 - Overhaul And Pressure Testf/W System Valves (Type: Butter Fly Valve, Qty:04, Size-50Mm).Test Pressure-7 Bar. Material Firm Supply , Whr Plant: Make: Techno Process, Type: 10 Tpd, Qty: 02, Location: Dgr & Gear Room109 - Chemically Clean And Pressure Distillate Water System Pipe Line Of Both Whr Plant. Length-15 Mtr, Dia 20Mm.Test Pressure-7 Bar. In-Way Job Includes As Renewal Of Fasteners And Joints. Material Firm Supply , Avcat Service & Transfer Pump : Make: Allweiler Pumps, Type: Trilub 140R 46 V W115 Iec 090 & Trilub 140R 46 W115, Qty: 01 Each, Location : Avcat Storage / Service Tank Compartment110 - Overhaul Both Service And Transfer Pump. Check Alignment Of Pump With Motor. Renew Bearing, Mechanical Seal And Foundation Bolts. Functional Check Of Pressure Relief Valves To Be Carried Out. Performance Of Pump To Be Proved Post Overhauling. Materials And Spares Except Main Screw Firm Supply. , Avcat Service & Transfer Pump : Make: Allweiler Pumps, Type: Trilub 140R 46 V W115 Iec 090 & Trilub 140R 46 W115, Qty: 01 Each, Location : Avcat Storage / Service Tank Compartment111 - Renew Avcat System Water Separators Filters And Fine Filter Cartridges. Qty-03 Nos Each .(In This Regard Cgrhq(W) Policy Letter At/330/Gse Dated 07 Mar 18 Is Relevant).In-Way Job Includes As Renewal Of End Cover Joint And Fasteners. Filter And Water Separator Inner Body Areato Be Cleaned. Spares And Filters – Cg Supply ,Materials Firm Supply And Spares Cg Supply. , Avcat Service & Transfer Pump : Make: Allweiler Pumps, Type: Trilub 140R 46 V W115 Iec 090 & Trilub 140R 46 W115, Qty: 01 Each, Location : Avcat Storage / Service Tank Compartment112 - Avcat Hose To Be Pressure Test And Test Certificate To Be Provided. Length-25 Mtr,Dia-50 Mm. Test Pressure -07 Bar. Material Firm Supply , Avcat Service & Transfer Pump : Make: Allweiler Pumps, Type: Trilub 140R 46 V W115 Iec 090 & Trilub 140R 46 W115, Qty: 01 Each, Location : Avcat Storage / Service Tank Compartment113 - Carry Out System Pipe Line Cleaning Including Renewal Of Gasket Pressure Test And Painted. Test Pressure-07 Bar. Gasket Material-Teflon,Thickness-3Mm.(I) Dia- 80 Mm, Length- 07 Mtrs. (Ii)Dia- 65 Mm, Length- 60 Mtrs.(Iii) Dia- 50 Mm, Length- 50 Mtrs.Material Firm Supply , Avcat Service & Transfer Pump : Make: Allweiler Pumps, Type: Trilub 140R 46 V W115 Iec 090 & Trilub 140R 46 W115, Qty: 01 Each, Location : Avcat Storage / Service Tank Compartment114 - Carry Out Calibration Of Avcat Flow Meter. Calibration To Be Carried Out And Certificate To Be Provided. Material Firm Supply And Spares – Cg Supply Firm To Provide Calibration Certificate. , Avcat Service & Transfer Pump : Make: Allweiler Pumps, Type: Trilub 140R 46 V W115 Iec 090 & Trilub 140R 46 W115, Qty: 01 Each, Location : Avcat Storage / Service Tank Compartment115 - Overhaul Both Hand Pump And Performance To Be Proved Post Overhaul. Materials And Spares Firm Supply. , Avcat Service & Transfer Pump : Make: Allweiler Pumps, Type: Trilub 140R 46 V W115 Iec 090 & Trilub 140R 46 W115, Qty: 01 Each, Location : Avcat Storage / Service Tank Compartment116 - Avcat Supply Nozzle Observed Leaked During Operation. To Be Overhauled And Proved For Operation. (All Spares Firm Supply) (In This Regard Cgrhq(W) Policy Letter At/330/Gse Dated 07 Mar 18 Is Relevant). In-Way Job Includes As Renewal Of End Cap And Earthing Clip.Material Firm Supply And Spares & Nozzle – Cg Supply. , Avcat Service & Transfer Pump : Make: Allweiler Pumps, Type: Trilub 140R 46 V W115 Iec 090 & Trilub 140R 46 W115, Qty: 01 Each, Location : Avcat Storage / Service Tank Compartment117 - Eductor In Avcat Fueling System Defective. To Be Overhauled And Performance To Be Proved. Material Firm Supply , Avcat Service & Transfer Pump : Make: Allweiler Pumps, Type: Trilub 140R 46 V W115 Iec 090 & Trilub 140R 46 W115, Qty: 01 Each, Location : Avcat Storage / Service Tank Compartment118 - Remove, Overhaul, Pressure Test And Refit Of Avcat System Valves. In-Way Job Includes As Renewal Of Fasteners And Gasket (Mat-Teflon, Thickness-3Mm).(I)Dn80 Quick Shut Off Valve – 01 Nos(Ii) Dn50 Quick Shut Off Valve – 01 Nos(Iii)Dn25 Quick Shut Off Valve – 01 Nos(Iv) Dn 50Swing Check Valve – 01 Nos(V)Dn50 Sdnr Valve – 04 Nos(Vi) Dn65 Gate Valve – 08 Nos(Vii)Dn50 Gate Valve – 08 Nos(Viii) Dn50ball Valve –02 Nos(Ix)Dn40ball Valve– 02 Nos(X) Dn15drain Cock – 08 Nos(Xi)Dn503-Way Valve– 02 Nosmaterial Firm Supply , Ship Siren: Make: M/S Zollner Germany, Type: Makrofon M 75 F/260 Hz, Qty: 01, Location : Bridge Top119 - Servicing Of Air Siren To Be Carried Out. In-Way Job Includes As Replacement Of Material/Spares By Firm , Ship Siren: Make: M/S Zollner Germany, Type: Makrofon M 75 F/260 Hz, Qty: 01, Location : Bridge Top120 - Air Leakage Observed From 30/7 Bar Reducer At Bridge Top. To Be Repaired. Material Firm Supply , Intering Tankstabiliser: Make:Rolls Royce, Type: Intering Tank, Qty: 01, Location: Gear Room & Stabiliser Compartments121 - Clean Pressure Test And Painting Of Stabilizer System Air System Buffering Tank To Be Carried. Qty-02 Nos. Paint– Firm Supply.Working Pressure-10 Bar , Intering Tankstabiliser: Make:Rolls Royce, Type: Intering Tank, Qty: 01, Location: Gear Room & Stabiliser Compartments122 - Clean And Blow Through The Air System Pipeline Of Stabilizer System. In-Way Job Includes As Repair Of Defective Line/Adapters And Ferrules. . Mat-Gi.(I) Line Dia-10Mm, Length-50 Mtr. Mat-Ss.(Ii) Line Dia-25Mm, Length-10 Mtrmaterial Firm Supply , Systems – Fire Main System123 - Remove, Overhaul, Pressure Test And Refit Of Fire Main System Valves As Indicated Below. Overhauling Includes Replacement Of Valve Seat, Rubber Seat, Stem Seal/Packing, Stem Bushing/Bearings, Gasket And O-Ring. Material Firm Supply Butterfly Valvedn65 1 Nosbutterfly Valve Dn1254 Nosbutterfly Valve Dn1002 Nos Butterfly Valve Dn50 1 Nosbutterfly Valve Dn802 Nosnr Flapdn651 Nosnr Flap Dn1252 Nos Nr Flap Dn50 1 Nosball Valvedn251 Nosball Valve Dn651 Nosball Valvedn50 4 Nos Stop Valve Dn50 1 Nos , Systems – Fire Main System124 - Remove, Overhaul, Pressure Test And Refit All Fire Hydrant Valves. Overhauling Includes Replacement Of Valve Seat, Stem Seal/Packing, Stem Gasket And Hydrant Plastic Cap With Locking To Sustain For One Operational Cycle. Qty: 23 Nos, Size: 50 Mm. Material Firm Supply , Systems – Fire Main System125 - Chemically Clean, Pressure Test, Paint And Refit Following Fire Main System Pipe Lines. Material-Seamless Pipe Sch 80.Pipe To Be Refitted With New Fasteners And Gaskets.Material Of Pipe- Seamless Steel Astm A 53/A 106Gr.B,Sch-80Material – Firm Supply Sllength (Mtrs) Dia(Mm)(A) 50 150 (B) 20 125 (C)40100(D) 60 50 , Systems – Fire Main System126 - Remove And Check Condition Of Orifice Plates In The System. Renew Defective Plates.Qty-10 Nos. Material Firm Supply , Systems – Fire Main System127 - Spray Pattern From Sprinklers In Magazine, Crn 91 And Paint Store Observed Sub-Optimal/ Erratic. Adjoining Pipelines To Be Chemically Cleaned And Pressure Tested. Renew Defective Sprinklers. (Crn-06 Sprinklers-Dia 40 Mm, Magazine-12Nos , Dia-30 Mm Quartzoid Bulb Type, Paint Store – 06 Nos, Dia 40- Mm) Approx. Length Of Pipe 30 Mtrs. Sprinklers – Cg Supply, Material Firm Supply , Fi-Fi System And Deluge System128 - Overhaul Electrically Operated Gate Valves And Carry Out Pressure Testing. Overhauling Includes Replacement Of Valve Seat, Rubber Seat, Stem Seal/Packing, Stem Bushing/Bearings, Gasket And O-Ring To Sustain For One Operational Cycle. Material Firm Supplyremote Operated Valve Nd300 Pn25 2 Nosbutter Fly Valve Nd502 Nos Butter Fly Valve Nd65 4 Nosbutter Fly Valve Nd1002 Nos , Fi-Fi System And Deluge System129 - Remove Clean, Overhaul, Pressure Test And Refit Fi-Fi Pump Systemand Deluge System Valves. Overhauling Includes Replacement Of Valve Seat, Rubber Seat, Stem Seal/Packing, Stem Bushing/Bearings, Gasket And O-Ring To Sustain For One Operational Cycle. Material Firm Supplybutterfly Valve300 Mm2 Nos Butterfly Valve100 Mm8 Nos , Fi-Fi System And Deluge System130 - Remove, Chemically Clean, Pressure Test, Galvanize, Paint And Refit All Deluge System Pipe Lines. Firm To Cater Renewal All Fasteners And Joints. Renewal Of Pipeline To Be Undertaken Against Awrf. Test Pressure 1.5 Times Of Working Pressure. Material Of Pipe- Seamless Steel Astm A53/A106 Gr.B Sch-80Material – Firm Supply Dia - 100 Mm 175 Mtsdia - 300 Mm.25 Mts , Fi-Fi System And Deluge System131 - Chemically Clean, Pressure Test, Paint And Refit Following Fi-Fi System Pipe Lines. Material- Seamless Pipe Sch 80.Firm To Cater Renewal All Fasteners And Joints. Test Pressure 1.5 Timesof Working Pressure. Material Of Pipe- Seamless Steel Astm A53/A106 Gr.B Sch-80Material – Firm Supply Dia-400 5 Mtsdia-350 30 Mtsdia- 5010 Mts , Fi-Fi System And Deluge System132 - Blow Through Nozzle Of Deluge System. Nozzles To Be Cleaned. Renew Defective Nozzles. Open Upright/ Horizontal Nozzle-115 Nos And Open Side Wise/ Horizontal Nozzle- 20 Nos.). Blow Through Pipe Lines After Nozzles Removal. A) Firm To Cater For Renewal Of 25 Nos Nozzle Nozzle – Firm Supply. Spares – Cg Supplyall In Way Jobs Included. Nozzle – Firm Supply. Spares – Cg Supplyfirm To Cater For Renewal Of 25 Nos Nozzlefire Monitor To Beproved For Satisfactory Performance. , Fi-Fi System And Deluge System133 - Overhaul The Fire Monitor And Check Performance.Materials And Spares Firm Supply.Nozzle – Firm Supply. Spares – Cg Supplyfirm To Cater For Renewal Of 25 Nos Nozzlefire Monitor To Beproved For Satisfactory Performance. , Fi-Fi System And Deluge System134 - Check Hydraulic Power Pack Of Fire Monitor For Functioning And Leakage Of Oil And Overhaul. Materials And Spares Firm Supply.Only Renewal Of Hoseshoses – Cg Supply.Nozzle – Firm Supply. Spares – Cg Supplyfirm To Cater For Renewal Of 25 Nos Nozzlefire Monitor To Beproved For Satisfactory Performance. , Fi-Fi System And Deluge System135 - Carry Out Functional Check Of Motor For Operation Of Fire Monitors. Renew 10 % Of System Pipe Lines.Only Renewal Of Hoseshoses – Cg Supply. Material Firm Supply , S/Wsystem For M/E, Dg (Main & Harbour), A/C & Ref, Ro Plant & Whr)136 - Following Sea Water Valves To Be Overhauled, Pressure Tested And Refitted. Overhauling Includes Replacement Of Valve Seat, Rubber Seat, Stem Seal/Packing, Stem Bushing/Bearings, Gasket And O-Ring. Test Pressure-07 Bar. Material Firm Supply125 Nbbutterfly Valves3 150 Nbbutterfly Valve 5 50 Nb Butterfly Valve1 65 Nb Butterfly Valve3 32 Nb Ball Valve2 25 Nb Ball Valve5 25 Nb Regulation Valve265 Nb Regulation Valve 1 125 Nbregulation Valve1150 Nbregulation Valve2150 Nbnr Flap 2125 Nbnr Flap 125 Nbnr Flap 265 Nbnr Flap 2 , S/Wsystem For M/E, Dg (Main & Harbour), A/C & Ref, Ro Plant & Whr)137 - Corrosion Pieces (Black Steel Pipe), Length 0.3 Mtr Each, Provided On Outlet To Heat Exchangers Of Various Sea Water Systems Deteriorated /Eroded. To Be Renewed As Per Sample.Material & Corrosion Pieces ( Black Steel Pipe)– Firm Supply. Corrosion Piecedia-168.3, 7.104 -1 Mtrcorrosion Piecedia-141.3, 6.601 -1 Mtrcorrosion Piecedia-42.2, 3.56 04 -1 Mtrcorrosion Piecedia-73, 5.16 03 -1 Mtr , S/Wsystem For M/E, Dg (Main & Harbour), A/C & Ref, Ro Plant & Whr)138 - Chemically Clean, Pressure Test, Paint And Refit Following Sea Water System Pipe Lines. Material- Seamless Pipe Sch80. Renew Of Defective Pipe Lines To Be Against Awrf. Test Pressure 1.5 Times Of Working Pressure. Job Includes As Renewal Of Fasteners And Joints. Material Of Pipe- Seamless Or Welded Steel Astm A106/A53 Gr.B, Cuni 90/10 Ns 2504Material – Firm Supply.Dia15040 Mtrdia12530 Mts Dia8080 Mts Dia 4040 Mts , F/W Cooling System 1, 2, 3&4 (M/E, G/Box, Sg, Plummer Block, Dg & Bow Thruster)139 - Remove, Overhaul, Pressure Test, Paint As Per Colour Code And Refit Of Fresh Water System Valves As Indicated Below. Overhauling Includes Replacement Of Valve Seat, Rubber Seat, Stem Seal/Packing, Stem Bushing/Bearings, Gasket And O-Ring. Test Pressure-07 Bar. Material Firm Supply (A)Butterfly Valve Dn50- 8 Nos(B)Butterfly Valvedn100 - 7Nos (C)Butterfly Valvedn150 - 3 Nos (D)Butterfly Valvedn65-1 Nos(E)Flow Regulation Valve Dn50- 2 Nos(F)Flow Regulation Valve Dn100 - 3 Nos (G)Flow Regulation Valve Pt28-2 Nos(H)Flow Regulation Valve Dn40 - 1 Nos(J)Ball Valve Dn10- 1 Nos(K)Ball Valve Pt28 -1 Nos(L)Ball Valvept8-2 Nos(M)Nr Flap Valve Dn100 - 4 Nos(N)Nr Flap Valvedn40 -1 Nos (P)Remote Operated Valve Dn100 – 4 Nos(Q)Remote Operated Valve 3/2 Way Dn100-3 Nos (R)Stop Valvedn100-1 Nos(S)Stop Valve Dn40 - 7 Nos(T)Stop Valvept28 - 1 Nos , F/W Cooling System 1, 2, 3&4 (M/E, G/Box, Sg, Plummer Block, Dg & Bow Thruster)140 - Chemically Clean, Pressure Test, Paint And Refit Following Fresh Water System Pipe Lines. Material- Seamless Pipe Sch 80. Test Pressure 1.5 Times Of Working Pressure. Job Includes As Renewal Of Fasteners And Joints. Material Of Pipe-Seamless Steel Astm A53/A106 Gr.B. Material Firm Supplydia150 10 Mtsdia100 15 Mtsdia 6510 Mtsdia 5010 Mtsdia4025 Mts , Hydrophore System (Hot/Cold), Hp Cleaner & Jet Water Cleaning141 - Remove, Overhaul, Pressure Test, Paint As Per Colour Code And Refit Of Hydrophore (Hot &Cold) And Jet Water System Valves As Indicated Below. Overhauling Includes Replacement Of Valve Seat, Rubber Seat, Stem Seal/Packing, Stem Bushing/Bearings, Gasket And O-Ring. Test Pressure-07 Bar. Material Firm Supply(A) 50Nbbutterfly Valve5(B) 50 Nb Pneumatic Operated Valve 2(C) 15 Nb Pneumatic Operated Valve3(D) 40 Nbstop Nr Valve 1(E) 32 Nbstop Nr Valve 1(F) 32 Nbstop Nr Valve 1(G) 30 Nbstop Nr Valve 1(H) 40 Nbstop Valve 1(J) 32 Nbstop Valve1(K)40 Nbnr Flap 1(L) 32Nb Safety Relief Valve1(M) 25 Nbsdsl Valve 1 (N) 22Nb Safety Valve 1(P) 28Nb Safety Valve1(Q) 18Nb Safety Valve1 , Hydrophore System (Hot/Cold), Hp Cleaner & Jet Water Cleaning142 - Chemically Clean, Pressure Test, Paint And Refit System Pipe Lines (Hydrophore/Jet Water). Mat-Cuni. Renewal Of Defective Pipe Lines To Be Against Awrf. Test Pressure 1.5 Times Of Working Pressure Job Includes As Renewal Of Fasteners And Joints. Material Of Pipe - Annealed Copper Tube, Seamless Steel Astm A56/106 Gr.B. Material Firm Supplydia 5018 Mtsdia 4013 Mtsdia 3213 Mtsdia 2513 Mts , Hydrophore System (Hot/Cold), Hp Cleaner & Jet Water Cleaning143 - Hydrophore Tank To Be Chemically Cleaned And Pressure Tested. Tank Capacity : 1500 Ltrs. Paint – Firm Supply. , Hydrophore System (Hot/Cold), Hp Cleaner & Jet Water Cleaning144 - Chemically Clean, Pressure Test And Refit Entire System Pipe Lines Of Hp Cleaner. Carry Out Renewal Of Ferrules On Pipe Connections Due Deterioration/ Corrosion. Job Includes As Renewal Of Fasteners And Joints.Pipe Mat: Seamless Steel, Astm A53/106 Gr B. Nos Of Ferrules: 120, Wp: 200 Bar, Tp: 300 Bar, Dia 15 Mm . Material Firm Supply , Hydrophore System (Hot/Cold), Hp Cleaner & Jet Water Cleaning145 - Uv Sterilizer Provided In The System In A/C Compartment To Be Serviced And Functioning To Be Proved In The System.Material Firm Supply , Systems-Bilge & Ballast, Ows System146 - Carry Out Chemical Cleaning And Check Performance Of 06 Nos. Bilge Eductors. Material And Spares Firm Supply. , Systems-Bilge & Ballast, Ows System147 - Remove, Overhaul, Pressure Test And Refit Bilge System Valves Including Oily Bilge Water Separator System As Indicated Below. Overhauling Includes Replacement Of Valve Seat, Rubber Seat, Stem Seal/Packing, Stem Bushing/Bearings, Gasket, Fasteners And O-Ring. Test Pressure-07 Bar.Sl. Size Type Qty(A) Dn100pneumatic Operated Valve08 Nos(B) Dn20pneumatic Operated Valves02 Nos(C) Dn50nr Globe Valve05 Nos(D) Dn40nr Globe Valve 01 No(E) Dn25ball Valve 03 Nos(F) Dn40ball Valve 01 No(G) Dn100nr Flap14 Nos(H) Dn 20 Nr Flap01 No(J) Dn125butterfly Valve 03 Nos(K) Dn100butter Fly Valve19 Nos(L) Dn50butterfly Valve 06 Nos(M) Dn50sdnr Valve31 Nos(N) Dn25 3-Way Directional Control Valve 01 No (P) Dn100safety Valve01 No(Q) Dn40safety Valve01 No(R) Dn30pneumatic Operated Valve02 Nos(S) Dn20pneumatic Operated Valve01 Nos(T) Safety Valve For Ows02 Nos(U) Dn30three Way Directional Valve02 Nosmaterial Firm Supply , Systems-Bilge & Ballast, Ows System148 - Remove, Overhaul, Pressure Test Remote Operated Valves Of Ballast System Including Its Operating Mechanism. Overhauling Includes Replacement Of Valve Seat, Rubber Seat, Stem Seal/Packing, Stem Bushing/Bearings, Gasket, Fasteners And O-Ring. Test Pressure-07 Bar.Sl.Sizetypeqty(A)Dn150 Pneumatic Operated Valves 14 Nos(B) Dn125 Pneumatic Operated Valves 03 Nos(C) Dn125 Butterfly Valve05 Nos(D) Dn125 Nr Flap Valve 03 Nos , Systems-Bilge & Ballast, Ows System149 - Chemically Clean, Pressure Test, Galvanize, Paint And Refit All System Pipe Lines. Material: Seamless Steel Astm A106 Gr B.Test Pressure 1.5 Times Of Working Pressure. Job Includes As Renewal Of Fasteners And Joints.Sl Dia(Mm) Qty(A) 150-38 Mtrs(B) 125 - 20 Mts (C) 100 - 50 Mts(D) 50 - 20 Mts(E) 40 - 13 Mts (F)20 -5 Mts , System- Fuel Oil, Lub Oil & Hydraulic Oil System150 - Following Fuel Oil Storage And Transfer System Valves To Be Removed, Overhauled, Pressure Tested And Fitted Back In To The System. Overhauling Includes Replacement Of Valve Seat, Rubber Seat, Stem Seal/Packing, Stem Bushing/Bearings, Gasket, Fasteners And O-Ring. Test Pressure-07 Bar. Material Firm Supply(A) Butterfly Valve Dn651 Nos(B)Butterfly Valve Dn50 1 Nos(C)Butterfly Valve Dn100 1 Nos(D)Butterfly Valve Dn80 3 Nos(E)Non Return Valve Dn50 1 Nos(F)Non Return Valvedn80 1 Nos(G)Quick Shut Off Valve Dn1001nos(H)Quick Shut Off Valve Dn801 Nos , System- Fuel Oil, Lub Oil & Hydraulic Oil System151 - Following Fuel Oil Storage And Transfer System Remote Operated Valves With Pneumatic Actuator To Be Removed, Overhauled, Pressure Tested And Fitted Back In To The System. Overhauling Includes Replacement Of Valve Seat, Rubber Seat, Stem Seal/Packing, Stem Bushing/Bearings, Gasket, Fasteners And O-Ring. Test Pressure-07 Bar. Material Firm Supply(A)Remote Valve (Air Operated)Dn80- 6 Nos(B)Remote Valve (Air Operated) Dn65- 1 Nos(C)Remote Valve (Air Operated)Dn100- 1 Nos , System- Fuel Oil, Lub Oil & Hydraulic Oil System152 - Remove, Overhaul, Pressure Test And Refit Remote Operated Valves In The Fuel Oil System Including Operating Mechanism. Valve Seat, Stem Seal / Packing, Stem Bushing/Bearings, Gasket And O-Ring To Be Renewed. Material Firm Supply(A)Pneumatic Operated Butter Fly Valve: 100 Mm - 2 Nos(B)Pneumatic Operated Butter Fly Valve: 80 Mm - 9 Nos , System- Fuel Oil, Lub Oil & Hydraulic Oil System153 - Following Fuel Oil Purification System Valves To Be Removed, Overhauled, Pressure Tested And Fitted Back. Material Firm Supply(A)Sdnr Valve 80Mm1 Nos(B) Quick Shut Off Valve 50Mm 2 Nos(C) Butterfly Valve 50Mm2 Nos(D) Butterfly Valve Dn40 2 Nos(E) Nr Valve Dn32 1 Nos , System- Fuel Oil, Lub Oil & Hydraulic Oil System154 - Following Fuel Oil Purification System Remote Operated Valves With Pneumatic Actuator To Be Removed, Overhauled, Pressure Tested And Fitted Back In To The System. Material Firm Supply(A) Remote Valve (Air Operated)Dn65 - 1 No(B) 4/3 Way Valve (Air Operated)Pt32- 1 No(C) 4/3 Way Valve (Air Operatedpt28- 1 No , System- Fuel Oil, Lub Oil & Hydraulic Oil System155 - Following Lub Oil System Valves To Be Removed, Overhauled, Pressure Tested And Fitted Back. Overhauling Includes Replacement Of Valve Seat, Rubber Seat, Stem Seal/Packing, Stem Bushing/Bearings, Gasket, Fasteners And O-Ring. Test Pressure-07 Bar. Material Firm Supply(A) Ball Valvedn40- 2 Nos(B) Sdnr Valve Dn32 - 2 Nos (C) Nr Valve Dn32 - 1 Nos , System- Fuel Oil, Lub Oil & Hydraulic Oil System156 - Following Hydraulic Oil System Valves To Be Removed, Overhauled, Pressure Tested And Fitted Back. Overhauling Includes Replacement Of Valve Seat, Rubber Seat, Stem Seal/Packing, Stem Bushing/Bearings, Gasket, Fasteners And O-Ring.Test Pressure-07 Bar. Material Firm Supply(A)Butterfly Valve1251 Nos(B) Butterfly Valve65 2 Nos(C) Sdnr Valve502nos(D) Ball Valve 50 2 Nos(E) Nr Valve501 Nos , System- Fuel Oil, Lub Oil & Hydraulic Oil System157 - Remove, Overhaul, Pressure Test And Refit Remote Operated Valves In The Fuel Oil System Including Operating Mechanism. Valve Seat, Stem Seal / Packing, Stem Bushing/Bearings, Gasket And O-Ring To Be Renewed. Material Of Pipe -Seamless Steel Astm A53/A106 Gr.Bmaterial Firm Supply(I)Pneumatic Operated Butter Fly Valve: 100 Mm - 1 Nos(Ii) Pneumatic Operated Butter Fly Valve: 80 Mm -5 Nos , System- Fuel Oil, Lub Oil & Hydraulic Oil System158 - Chemically Clean, Pressure Test, Paint And Refit Following Fuel System Pipe Lines. Material- Seamless Pipe Sch 80. Test Pressure 1.5 Timesof Working Pressure.Pipe To Be Refitted With New Fasteners And Gaskets. Material Of Pipe -Seamless Steel Astm A53/A106 Gr.B Material Firm Supply(A)Dia10015 Mtrs(B)Dia 8020 Mtrs(C)Dia 50 5 Mtrs(D) Dia40 13 Mtrs(E) Dia 32 10 Mtrs , System- Fuel Oil, Lub Oil & Hydraulic Oil System159 - Chemically Clean, Pressure Test, Paint And Refit Following Lub Oil System Pipe Lines. Material- Seamless Pipe Sch 80. Test Pressure 1.5 Times Of Working Pressure. Pipe To Be Refitted With New Fasteners And Gaskets. Material Of Pipe-Seamless Steel Astm A 53 Gr.Amaterial Firm Supply(A) Dia 40- 10 Mts(B) Dia 32- 10 Mts , System- Fuel Oil, Lub Oil & Hydraulic Oil System160 - Chemically Clean, Pressure Test, Paint And Refit Following Hydraulic System Pipe Lines. Material- Seamless Pipe Sch 80. Test Pressure 1.5 Timesof Working Pressure. Pipe To Be Refitted With New Fasteners And Gaskets. Material Of Pipe -Seamless Steel Astm A53/A106 Gr.A.Material Firm Supply (A)Dia125- 2 Mts(B) Dia 65- 5 Mts (C) Dia 50 - 13 Mts , System- Fuel Oil, Lub Oil & Hydraulic Oil System161 - Calibrate Flow Meters (Metering Devise For Fuel Bunkering, Main Engine, Main Dg & Harbor Dg) In The System. Make: Oval Corporation, Japan, Flow Rate: 800 Lph, Size: 20Mm, Pressue:1.18Mpa, Qty: 07 Nos, Make: Tokhemsofitamsatam, Model: Zc/80/150, Flow Rate: 150Kl/H,Max Wp: 10 Bar, Qty: 01 Nos. Firm To Provide Certificate.Material Firm Supply , System- Fuel Oil, Lub Oil & Hydraulic Oil System162 - Overhaul, Pressure Test And Refit All Qsd Valves ( Pneumatic Operated) With Mechanismin The Fuel System, (I) Size: 80 Mm-06 Nos (Ii) Size: 35Mm- Qty: 03 Nos Material Firm Supply , System- Fuel Oil, Lub Oil & Hydraulic Oil System163 - Both Fo Separator Feed Pump Suction Line 3/2 Way Pneumatic Operated Valve With Actuator And Solenoid Valve To Be Overhauled And Proved For Satisfactory Operation With Respect To Low And High Level In Ru Tank. Size: 35 Mm, Qty: 02 Nos.Material Firm Supply , Air System And Air Bottles164 - Hp Air Bottles (04 Nos, Capacity: 500 Ltrs Each, 01 No. Capacity: 1000 Ltr, 01 No. Instrument Buffer Tank: 60 Ltrs, 02 Nos, Pneumatic Control Air Reservoir Capacity: 80 Ltrs And 01No’S Starting Air Receiver For Emergency Gen Set Capacity: 125Ltrs) Are To Be Cleaned Internally, Hydraulically Tested And Painted. Inspection Door Gasket To Be Renewed.Material Firm Supply , Air System And Air Bottles165 - Overhaul & Pressure Test Following Air Valves In Starting Air System Including Isolating Valves. Overhaul Safety Valves In Air Bottles, Relief Valve And Drier/Moister Absorber In The System Overhaul & Pressure Test 50% Service Air Valves In The System, As Indicated Below. Overhauling Includes Replacement Of Valve Seat, Lid, Stem Seal/Packing, Stem Bushing/Bearings, Gasket, Fasteners And O-Ring.Material Firm Supply(A) Ball Valve 35Mm 2 Nos(B)Non Return Valve35mm6 Nos(C)Stop Valve 35Mm 4 Nos(D)Stop Valve 15Mm 6 Nos(E)Relief Valve 15Mm 2Nos (F)Stop Valve 12Mm3 Nos(G)Non Return Valve12mm4nos(H)Ball Valve 12Mm 18 Nos(J)Ball Valve 15Mm4 Nos(K)Ball Valve 28Mm8 Nos(L)Solenoid Valve (Drain) 28Mm1 Nos(M)Non Return Valve25mm 1 Nos(N)Non Return Valve22mm 1 Nos(P)Ball Valve 22Mm 2 Nos(Q)Ball Valve 12Mm 1 Nos(R)Relief Valve 15Mm1nos(S)Relief Valve --------- 2Nos(T)Ball Valve 42Mm1 Nos(U)Ball Valve 08Mm 1 Nos(V)Non Return Valve15mm 1 Nos(W)Ball Valve 10Mm1 Nos(X) Stop Valve 08Mm 2 Nos , Air System And Air Bottles166 - Overhaul Following Air Reducer With Drier In The System And Renew Defective Parts. Spare / Material Including Drier Cores Firm Supply.(A) Air Reducer (30-10 Bar)- 05 Nos(B) Air Reducer (30-7 Bar)- 06 Nos(C) Air Reducer (7-4 Bar)- 04 Nos(D) Drier- 02 Nos. , Air System And Air Bottles167 - Control And Instrumentation Air System Lines To Be Chemically Cleaned, Painted And Pressure Tested. Renewal Of Fasteners To Be Undertaken By Firm.(Dia-15Mm, Length 38Mtrs Test Pressure- 10 Bar) , Air System And Air Bottles168 - Chemically Clean, Pressure Test, Paint And Refit Following Lp And Hp Air System Pipe Lines. Material- (Mat- Seamless Precision Steel, Dn 2391). Pipe To Be Refitted With New Fasteners And Gaskets By Firm. (A) Dia 35-40 Mts(B)Dia15-40 Mts , Air System And Air Bottles169 - Sea Chest Blow Down Air System Pipe Lines Badly Corroded. To Be Chemically Cleaned And Pressure Tested And Refitted With New Fasteners And Gaskets (Mat- Seamless Precision Steel, Dn 2391).Pipe To Be Refitted With New Fasteners And Gaskets.Material Firm Supply(A) Dia 20 Mm- 20 Mts(B) Dia 15 Mm - 50 Mts , Me Control Air Reducing Station170 - Overhaul Main Engine Control Air Reducing Station And Prove In The System. Overhaul Includes Renewal Of Defective/ Worn Out Parts As Firm Supply. Material Firm Supply And Spares – Cg Supply(A) Dissemble Device And Clean All Parts. (B) Check Springs And Replace, If Found Worn Out.(C) Re-Assemble Device By Using The Indicated Lubricants.(D) Adjust Device With Inthe Control System. , System – Steam & Condensate System171 - Carry Out Following Refit Routines On Steam & Condensate System. Materials And Spares Firm Supply.(I) Remove, Overhaul, Pressure Test And Refit Valves As Indicated Below. Overhauling Includes Replacement Of Valve Seat, Lid, Gasket And Fasteners.(A)Stop Valve25 Mm 4 Nos(B)Stop Valve50 Mm1nos(C)Stop Valve20 Mm2 Nos(D)Stop Valve 40 Mm 1 Nos(E)Stop Valve 65 Mm 1 Nos(F) Stop Valve 32 Mm1 Nos(G)Stop Valve 15 Mm2 Nos(H)Nrv50 Mm 1 Nos , System – Steam & Condensate System172 - (Ii) Chemically Clean, Pressure Test, Galvanize And Refit 50% System Pipe Lines Including Steam Coils In The Oro Tanks. Renew Insulation And Ss Cladding On Completion.Pipe Dia: 30Mm. Replacement Of Fasteners To Be Undertaken By Firm. Firm To Cater For 50 Mtr Insulation Renewala) Chemically Clean, Pressure Test, Galvanize And Refit System Pipe Lines Pipe Dia 30Mm, Length 50 Mtrs.B) Firm To Cater 50 Mtrs Insulation Renewal(Iii) Overhaul Safety Valves And Relief Valves In The System And Prove Functioning. 2 Nos(Iv) Overhaul 01 No. Back Pressure Regulator. Firm To Prove The System For Satisfactory Operation. And Spares – Cg Supply. (V) Overhaul Steam Detector &Transmitter In The System.Firm To Prove The System For , System – Steam & Condensate System172 A - Satisfactory Operation. And Spares – Cg Supply. 1 No(Vi) Overhaul Steam Trap And De-Aeration Unit In The System.Firm To Prove The System For Satisfactory Operation. And Spares – Cg Supply. (Vii) Overhaul And Pressure Test Motor Controlled Regulating Valve.Firm To Prove The System For Satisfactory Operation. And Spares – Cg Supply. 1 No(Viii) Overhaul And Check Functions Of Temperature Controlled Regulating Valve In The System.Firm To Prove The System For Satisfactory Operation. And Spares – Cg Supply. 1 No(Ix) Chemically Clean And Pressure Test Hot Well / Feed Water Tank.Firm To Prove The System For Satisfactory Operation. And Spares – Cg Supply. (X) Check Functions Of Thermostat Valve In The System.Firm To Prove The System For Satisfactory Operation. And Spares – Cg Supply. , Exhaust System172 - Carry Out Following Refit Routines On Steam & Condensate System. Materials And Spares Firm Supply.(I) Remove, Overhaul, Pressure Test And Refit Valves As Indicated Below. Overhauling Includes Replacement Of Valve Seat, Lid, Gasket And Fasteners.(A)Stop Valve25 Mm 4Nos(B)Stop Valve50 Mm1nos(C)Stop Valve20 Mm2nos(D)Stop Valve 40 Mm 1 Nos(E)Stop Valve 65 Mm 1 Nos(F) Stop Valve 32 Mm1 Nos(G)Stop Valve 15 Mm2 Nos(H)Nrv 50 Mm 1 Nos(Ii) Chemically Clean, Pressure Test, Galvanize And Refit 50% System Pipe Lines Including Steam Coils In The Oro Tanks. Renew Insulation And Ss Cladding On Completion.Pipe Dia: 30Mm. Replacement Of Fasteners To Be Undertaken By Firm. Firm To Cater For 50 Mtr Insulation Renewala) Chemically Clean, Pressure Test, Galvanize And Refit System Pipe Lines Pipe Dia 30Mm, Length 50 Mtrs.B) Firm To Cater 50 Mtrs Insulation Renewal , Exhaust System172 A - (Iii) Overhaul Safety Valves And Relief Valves In The System And Prove Functioning. 2 Nos(Iv) Overhaul 01 No. Back Pressure Regulator. Firm To Prove The System For Satisfactory Operation. And Spares – Cg Supply. (V) Overhaul Steam Detector &Transmitter In The System.Firm To Prove The System For Satisfactory Operation. And Spares – Cg Supply. 1 No(Vi) Overhaul Steam Trap And De-Aeration Unit In The System.Firm To Prove The System For Satisfactory Operation. And Spares – Cg Supply. (Vii) Overhaul And Pressure Test Motor Controlled Regulating Valve.Firm To Prove The System For Satisfactory Operation. And Spares – Cg Supply. 1 No(Viii) Overhaul And Check Functions Of Temperature Controlled Regulating Valve In The System.Firm To Prove The System For Satisfactory Operation. And Spares – Cg Supply. 1 No(Ix) Chemically Clean And Pressure Test Hot Well / Feed Water Tank.Firm To Prove The System For Satisfactory Operation. And Spares – Cg Supply. (X) Check Functions Of Thermostat Valve In The System.Firm To Prove The System For Satisfactory Operation. And Spares – Cg Supply. , Exhaust System173 - Clean Silencers On Exhaust System Of Main Engine, Main Dg, Harbour Dg, Emergency Dg, Steam Generator And Incinerator. Repair Of Silencer To Be Undertaken Under Awrf. In-Way Job Includes As Covering Of Engine Significant Parts During Ongoing Job. , Fi- Fi Pump Along With Fire Monitor: Make– Eureka Pump System, Model—300V400 Ogf,Cap—2000M3/H, Total Head 145M/C, Quantity-02 (Mer)174 - Overhaul Fi-Fi Pump. Overhauling Includes Renewal Bearing, Wear Rings, Mechanical Seal And Foundation Bolts. Paint Pump Casing Internally And Externally. Performance Of Pump To Be Proved Post Overhauling. Materials Andspares Except Shaft And Impeller Firm Supply. , Fi- Fi Pump Along With Fire Monitor: Make– Eureka Pump System, Model—300V400 Ogf,Cap—2000M3/H, Total Head 145M/C, Quantity-02 (Mer)175 - Check Alignment Of Pump With Gear Box. Check Condition Of Rubber Elements Of Flexible Coupling. Firm To Cater Replacement Of Coupling.Material Firm Supply And Spares – Cg Supply. , Fi- Fi Pump Along With Fire Monitor: Make– Eureka Pump System, Model—300V400 Ogf,Cap—2000M3/H, Total Head 145M/C, Quantity-02 (Mer)176 - Check Condition Of Rubber Elements Of Vulcan Coupling. Firm To Cater Renewal Of Coupling. Material Firm Supply And Spares/Coupling - Cg Supply , Fi- Fi Pump Along With Fire Monitor: Make– Eureka Pump System, Model—300V400 Ogf,Cap—2000M3/H, Total Head 145M/C, Quantity-02 (Mer)177 - Chemically Clean And Pressure Test Gear Box Cooler. Test Pressure-8 Bar. Material Firm Supply , S/W Oily Mix Pump (Oro System) Make:Allweiler,Type:216.118/058.100.40Xy Hyd,154-160 M3/H,Qty-02(Sr No.42761,42760) Location :Pump Room No.1178 - Hydraulic Motor To Be Overhauled And Renewworn Parts. Overhauling Includes Renewal Of Bearing, Coupling, Mechanical Seal And Foundation Bolts. Functional Check Of Pressure Relief Valves To Be Carried Out. Performance Of Pump To Be Proved Post Overhauling. All Spares Except Main Screw And Shaft Firm Supply. Material Firm Supply , S/W Oily Mix Pump (Oro System) Make:Allweiler,Type:216.118/058.100.40Xy Hyd,154-160 M3/H,Qty-02(Sr No.42761,42760) Location :Pump Room No.1179 - Check The Alignment Of Couplings Halves, Preferably Immediately After The Pump Operation, While The Temperature Is Still At Operating Level.Material Firm Supply , S/W Oily Mix Pump (Oro System) Make:Allweiler,Type:216.118/058.100.40Xy Hyd,154-160 M3/H,Qty-02(Sr No.42761,42760) Location :Pump Room No.1180 - Check Capacity And Absorbed Horse Power. Capacity And Power Loss Will Indicate Wear. In Case Of Wear, Check Screw Shaft And Cylinder Must Be Checked For Damage.Material Firm Supply , S/W Oily Mix Pump (Oro System) Make:Allweiler,Type:216.118/058.100.40Xy Hyd,154-160 M3/H,Qty-02(Sr No.42761,42760) Location :Pump Room No.1181 - Check The Screw Flank Clearance, As Well As The Clearance Between Timing Gears. Material Firm Supply , Oro Pump-Hydrauliceccentericscrew,Make:Allweiler,Type:Ae 1E 2700 422 Gok,Capacity;125-75 M3h,Qty01 No.(Sr No. 8060774) Location:Pump Room No.2182 - Overhaul The Pump Including Gear Box And Hydraulic Motor. Renew Worn Out Parts. Overhauling Includes Renewal Ofbearing, Coupling, Mechanical Seal And Foundation Bolts. Functional Check Of Pressure Relief Valves To Be Carried Out. Performance Of Pump To Be Proved Post Overhauling. Materials Spares Except Screw And Shaft Firm Supply. , Oil/Water Mix Pump, Make:Allweiler,Type:231.150/102.100.50-Xy Hydr Capacity:200 M3h,Qty-01 No.Location:Pump Room183 - Overhaul The Pump Including Hydraulic Motor. Renew Worn Out Parts. Overhauling Includes Renewal Of Bearing, Coupling, Mechanical Seal And Foundation Bolts. Functional Check Of Pressure Relief Valves To Be Carried Out. Performance Of Pump To Be Proved Post Overhauling. Materials Spares Except Screw And Shaft Firm Supply. , Oil/Water Mix Pump, Make:Allweiler,Type:231.150/102.100.50-Xy Hydr Capacity:200 M3h,Qty-01 No.Location:Pump Room184 - Check The Alignment Ofcouplings Halves ,Preferably Immediately After The Pump Operation, While The Temperatureis Still At Operating Level. Material Firm Supply , Oil/Water Mix Pump, Make:Allweiler,Type:231.150/102.100.50-Xy Hydr Capacity:200 M3h,Qty-01 No.Location:Pump Room185 - Check Capacity And Absorbed Horse Power. Capacity And Power Loss Will Indicate Wear. In Case Of Wear, Check Screw Shaft And Cylinder Must Be Checkedfor Damage. Material Firm Supply , Oil/Water Mix Pump, Make:Allweiler,Type:231.150/102.100.50-Xy Hydr Capacity:200 M3h,Qty-01 No.Location:Pump Room186 - Check The Screw Flank Clearance, As Well As The Clearance Between Timing Gears. Material Firm Supply , Portable Submersiblepump: M/S Mody Industries Pvt Ltd, Cap: 40 Tph Type:M 504 N(M),Qty : 04187 - Overhaul The Pump And Motor. Check The Alignment Of Pump With Motor. Paint Pump Internally And Externally. Performance To Be Proved Post Overhaul. Overhauling Includes Renewal Of Bearing, Coupling, Mechanical Seal. Materials Andspares Except Shaft & Impeller Firm Supply. Firm To Undertake Job With Pac Firm – M/S Wipl, Thane , Portable Submersiblepump: M/S Mody Industries Pvt Ltd, Cap: 20 Tph,Qty : 03188 - Overhaul The Pump And Motor Check The Alignment Of Pump With Motor. Paint Pump Internally And Externally. Performance To Be Proved Post Overhaul. Overhauling Includes Renewal Of Bearing, Coupling, Mechanical Seal. Materials Andspares Except Shaft & Impeller Firm Supply. Firm To Undertake Job With Pac Firm – M/S Wipl, Thane , Engine Driven Diving Air Compressor, Make - Aerotecnica Coltri , Model- Mch6/Sh, Qty-01189 - Overhaul The Compressor And Engine. Consumable Spares And Material Firm Supply.Firm To Undertake Overhauling Of Diving Air Compressor And Prove For Satisfactory Operation. Spares – Cg Supply. , Diving Air Compressor( Motor Driven), Make - Aerotecnica Coltri , Model- Mch- 13 Et, Qty-01190 - Overhaul The Compressor. All Consumable Spares Firm Supply. Firm To Undertake Overhauling Of Diving Air Compressor And Prove For Satisfactory Operation. Spares – Cg Supply. , Pollution Control Boat Engine, Make: Perkin’S Sabre Marine Power, Model (Engine/Gear):M-215C/Twin Disc Mg 5050, Capacity: 202 Hp/2500 Rpm, Quantity:02 (Port/Stbd Boat Deck191 - Overhaul The Engine, Gear Box And Pump. Consumable Spares Firm Supply. Firm To Undertake The Job And Prove For Satisfactory Operation. Spares – Cg Supply. Material Firm Supply , Portable Non Submersible Pump Motor Driven, Make– Be Pumps Pvt Ltd,Type–Sh80-140Ni-3, Capacity – 35 Tph, Qty- 01 No.192 - Overhaul The Pump And Performance To Be Proved. Paint Pump Casing Internally And Externally. Materials And Spares Firm Supply. , Portable Non Submersible Pump Motor Driven, Make– Be Pumps Pvt Ltd,Type–Sh80-140Ni-3, Capacity – 35 Tph, Qty- 01 No.193 - Check The Alignment Of Pump With The Motor And Renew Coupling Element. Material Firm Supply , Remote Operated Valves :Make-Rotex Valve Automation System, Type Butterfly Valve194 - Pneumatic Actuators Of Remote Operated Butterfly Valves Of Various System To Be Serviced And Tested For Correct Operation. Valves To Be Integrated With Pneumatic Lines For Remote Operation. Material Firm Supply , Hydraulic L.O Transfer Pump, Make: Allweiler Ag Germony, Type: Tri Lub 80R 36-W115, Qty: 01, Location: Mer195 - Hydraulic L.O Transfer Pump Not Developing Adequate Pressure. Overhaul Hydraulic Lub Oil Transfer Pump, Check Alignment Of Pump. Overhauling Includes Renewal Of Bearing, Mechanical Seal And Foundation Bolts. Functional Check Of Pressure Relief Valves To Be Carried Out. Performance Of Pump To Be Proved Post Overhauling. Materials And Spares Except Main Screw And Shaft Firm Supply. , Hydraulic L.O Transfer Pump, Make: Allweiler Ag Germony, Type: Tri Lub 80R 36-W115, Qty: 01, Location: Mer196 - Hydraulic L.O Transfer Pump Suction And Discharge Pressure Gauges Showing Erratic Reading. Gauges To Be Renewed (Range: -1 To 3 Bar. Qty-01 No, 0-10 Bar, Qty-01 No). Job Includes As Renewal Of Pressure Gauge Line And Isolating Cocks. Gauge Line Length-02 Mtr,Dia-08 Mm ,Nos Of Cocks-02 Nos. Gauges – Cg Supply. Material Firm Supply , Ballast Pump:Make: Pompe Garbarino, Type: Mu65/250M, Capacity: 100M3/H At 55 Kw,2900 Rpm, Qty: 02, Location: Mer And Gear Room197 - Chemically Clean, Pressure Test, Paint And Refit Following Foam Liquid Pump System Pipe Lines. Material- (Mat- Seamless Precision Steel, Dn 2391). Pipe To Be Refitted With New Fasteners And Gaskets By Firm Sldia(Mm)(A) 80 , Dispersant Pump: Make: Vn – Pumpen, Model: Bremen/Frgsu/603N30, Capacity: 21.5 M3/H,2900 Rpm 3 Kw, Qty: 01, Location: A/C Room198 - Dispersant Pump Not Developing Adequate Pressure. Overhaul The Pump, Check Alignment Of Pump With Motor. Overhauling Includes Renewal Of Bearing, Mechanical Seal And Foundation Bolts. Paint Pump Casing Internally And Externally. Performance Of Pump To Be Proved Post Overhauling.Materials And Spares Except Main Screw And Shaft Firm Supply. , Dispersant Pump: Make: Vn – Pumpen, Model: Bremen/Frgsu/603N30, Capacity: 21.5 M3/H,2900 Rpm 3 Kw, Qty: 01, Location: A/C Room199 - Dispersant Pump Suction And Discharge Pressure Gauges Showing Erratic Reading. Gauges To Be Renewed (Range: -1 To 3 Bar. Qty-01 No, 0-10 Bar, Qty-01 No). Job Includes As Renewal Of Pressure Gauge Line And Isolating Cocks. Gauge Line Length-02 Mtr,Dia-08 Mm,Nos Of Cocks-02 Nos. Gauges – Cg Supply. Material Firm Supply , Miscellaneous200 - Both Shaft Generator Built-On Heat Exchanger To Be Chemically Cleaned And Pressure Tested. Zinc Anode To Be Renewed.Capacity: 400Mj/H - 15 M3/H Material & Zinc Anode – Firm Supply. , Miscellaneous201 - Machinery Spaces Bilge Platform Support Frames Bent / Broken At 10 Locations. To Be Repaired / Welded As Necessary. Missing Securing Screws (Mat Ss) To Be Renewed. Qty-100 Nos. Material Firm Supply , Pollution Control Equipmentpower Pack Hydraulic Pump For Oro System, Model:Danfoss Qty:04202 - Overhaul Hydraulic Pump, Check Alignment Of Pump With Motor And Replace Necessary Spares. Renew Bearing, Mechanical Seal And Foundation Bolts. Paint Pump Casing Internally And Externally. Performance Of Pump To Be Proven Post Overhauling. Materials And Spares Firm Supply. , Pollution Control Equipmentpower Pack Hydraulic Pump For Oro System, Model:Danfoss Qty:04203 - Hydraulic System Heat Exchanger To Be Cleaned And Pressure Testedqty: 02 Max.Wp-280 Barmaterial Firm Supply , Pollution Control Equipmentpower Pack Hydraulic Pump For Oro System, Model:Danfoss Qty:04204 - High Pressure Non Return Valve To Be Overhauled And Pressure Testedqty: 04Size : 42 Mmmaterial Firm Supply , Pollution Control Equipmentpower Pack Hydraulic Pump For Oro System, Model:Danfoss Qty:04205 - Main System Relief Vv. To Be Overhauled And Pressure Tested.Qty:01Size: 42 Mmmaterial Firm Supply , Pollution Control Equipmentpower Pack Hydraulic Pump For Oro System, Model:Danfoss Qty:04206 - Following Oro System Valves With Electro-Pneumatic Actuator To Be Removed, Overhauled, Pressure Tested And Refitted. If Necessary To Be Renewed Valve Seat, Stem Seal/Packing, Stem Bushing/Bearings, Gasket And O-Ring To Be Renewed. Operation Of Valve To Be Proved From Local & Ipms. Material Firm Supply(I)25 Ball Vv1 Nos(Ii) 125 Butterfly Vv 1 Nos(Iii)150Butterfly Vv8 Nos(Iv)200Butterfly Vv1 Nos(V) 250Butterfly Vv1 Nos , Power Packfor Vikoma Hi – Sprint Boom, Make : Vikoma, Model- Gp10, Type:Single Cylinder, Air Cooled, Four Stroke, Dieselengine,Qty-02 Nos207 - Power Pack For Vikoma Hi – Sprint Boom To Be Overhauled And Proved. Materialsfirm Supply And Spares Cgsupply.Scope Includes Following:- (I) Carry Out Major Overhauling Of Engine.(Ii) Check And Adjust Valve Clearances(Iii) Check And Adjust Decompression Setting(Iv) Renew Oil Filter Elements(V) Drain Sump And Refill With Oil Of The Correct Type And Specification(Vi) Clean Fuel Cap Air Vent.(Vii) Test And Clean The Fuel Injector And Fit A New Washer(Viii) Remove The Hand Start Assembly, Clean And Inspect The Oil Seals And Bearing.(Ix) Refit The Assembly And Lubricate.(X) Clean Carbon Deposit From Exhaust System(Xi)Drain Fuel Tank Completely, Flush And Clean It(Xii)Renew Flexible Fuel Hoses.(Xiii)Carry Out Load Testing Of Lifting Slings And Issue Certificate From Authorized Agency. , Equipment :Gta 140 A Pump (Centrifugal Pump Hydraulic Motor Driven) Model Gta 140 Make :Lamor, Qty:02 (Fitten In Side Sweeping Arm)208 - Centrifugal Pump To Be Overhauled And Proved For Operation. Spares- Cg Supply. Material –Firm Supply. , Equipment : Sweeping Arms System With Accessories, Model : Sc115-06/09, Make : M/S Lamor, Qty : 02209 - Check Tightness And Secureness Of The Brush Chains, Chain Master Links, Cleaner Bolts, Upper Shafts Sprocket, Lower Shaft Sprockets, Chain Tightness Adjustment Bolts, And All Other Assembly Hardware & Prove For Smooth Operation. . All Spares Including Wire Rope, Belt And Locking System – Cg Supply. Material Firm Supply , Equipment : Sweeping Arms System With Accessories, Model : Sc115-06/09, Make : M/S Lamor, Qty : 02210 - Check Alignment Of The Brush Chains(Upper And Lower Shafts And Chain Sprockets) With Respect To The Brush Conveyor Frame And Brush Cleanerall Spares Including Wire Rope, Belt And Locking System – Cg Supply. Material Firm Suply , Equipment : Sweeping Arms System With Accessories, Model : Sc115-06/09, Make : M/S Lamor, Qty : 02211 - All Tema Quick Release Connections Male And Female “O” Rings To Be Renewed.All Spares Including Wire Rope, Belt And Locking System – Cg Supply.Material Firm Suply , Equipment : Sweeping Arms System With Accessories, Model : Sc115-06/09, Make : M/S Lamor, Qty : 02212 - Check Port &Stbd Sweeping Arm Forward And Aft Winch Flexible Steel Wire Rope For Any Broken Wires, Kinking Or Flattening, Excess Wear And Surface Corrosion. Firm To Cater For Renewal Of Wire Ropes.All Spares Including Wire Rope, Belt And Locking System – Cg Supply. Material Firm Suply , Equipment : Sweeping Arms System With Accessories, Model : Sc115-06/09, Make : M/S Lamor, Qty : 02213 - 06 Nos Securing Belts With Stainless Steel Locking System For Securing Of Sweeping Arms Deteriorated. To Be Renewed As Per Sample. Size 50 Mm Belts, Length 8 Mtr Each. Swl Of Each Belt – 2500 Kg.All Spares Including Wire Rope, Belt And Locking System – Cg Supplymaterial Firm Suply , Equipment : Tc-3 Spray Arm : Make:Rototech Ltd. London, Qty – 01 No214 - Tc-3 Spray Arm System To Be Overhauled And Proved. Scope Includes Following:-(I) Removal Of Nozzles And Adopters, Cleaning And Refitting (Ii) Renewal/Replacement Of Nozzles And Adopters If Required[Note: All Spares /Material For Overhauling Is Firm Supply] , Equipment : Tc-3 Spraying Bucket, Make:Heli Task (Rototech), Type: Tc-3 Bucket,Qty – 01 No215 - Tc-3 Spraying Bucket System To Be Overhauled And Proved For Operation. Scope Includes As Follows:-(I) Remove Pump And Dismantle And Pack Internal Bearing With Grease(Ii) Remove Both Electrically Controlled Valves And Overhaul With Kits Provided(Iii) Inspect Foundation Mounting. If It Is Cracked/Damaged, Remove Mounting(Iv) Remove Air Inlet Pipe And Exhaust Pipe Clean, Make It Dry And Refit(V) Open Drain Plug Of Bucket And Drain The Water After Re-Circulation With Detergent Solution For 30 Minutes(Vi) Carry Out Load Testing Of Lifting Slings(Vii) Overhaul Complete Engine(Viii) Renew Rubber Hoses(Ix) Renew Battery, Spark Plug And Ignition Coil(X) Renew Both Solenoid Along With Nozzle Discs And Rubber(Xi) Renew Connector Pins (Male & Female) Of Remote[Note: All Spares For Overhauling Is Firm Supply] , Equipment : Power Pack For Weir Skimmer, Lpp 25/3D, Make:M/S Lamor , Qty – 02 Nos216 - Power Pack For Weir Skimmer To Be Overhauled And Proved For Optimum Rating. Materials And Spares Firm Supply. Scope Includes Following:-(I) Renew Fuel And Lub Oil Element(Ii) Drain Complete Luboil From The Sump.Flash Out The System(Iii) Remove Injector, Clean And Pressure Test Nozzle, (Iv) Change Hydraulic Oil Of The Tank(V) Dismental Inlet And Exhaust Manifold, Clean Foreign Depositeand Carbon. Refit Manifolds(Vi) Carry Out Top Over Haul Of Engine(Vii) Renew All Flexible Fuel Pipes[Note: Material Firm Supply And Spares Cg Supply , Equipment : Power Packfor Disc Skimmer, Lpp 30/D Make:M/S Lamor Qty – 02 Nos217 - Power Pack For Disc Skimmer To Be Overhauled And Proved For Optimum Rating. Materials And Spares Firm Supply. Scope Includes Following:-(I) Renew Fuel And Lub Oil Element(Ii) Drain Complete Luboil From The Sump.Flash Out The System(Iii) Remove Injector, Clean And Pressure Test Nozzle, (Iv) Change Hydraulic Oil Of The Tank(V) Dismental Inlet And Exhaust Manifold, Clean Foreign Deposit And Carbon. Refit Manifolds(Vi) Carry Out Top Over Haul Of Engine(Vii) Renew All Flexible Fuel Pipes[Note: Material Firm Supply And Spares Cg Supply , Equipment : Diesel Engine Driven Screw Air Compressor, Make : Kirloskar218 - Carry Out Major Overhauling Of Engine/ And Compressor. [Note: Material Firm Supply And Spares Cg Supply , Supplementary Defect List219 - Following Under Water Pipes Fitted On Deck Observed Deteriorated. Deck Pipes To Be Renewed. (Test Pressure 1.5 Times Of Working Pressure). Material Firm Supply. Flange Thickness-18 Mm. Services Of Class Surveyor To Be Undertaken For Inspection. Mat-Black Steel. Working Pressure-10 Bar Material And Pipes – Firm Supplyequipment/ System Descriptionlenmm) Diaqtyref. Sw Pumpsuction 400 321 Nosref. Sw Pumpoverboard 40040 1 Nosobw Separatoroverboard 400 401 Nosro Plantoverboard 400 402 Nosfi-Fi Pump Drain To Obd 400 50 1 Nosfire Pump Overboard40050 1 Nosmagazine Floodingoverboard 4002001 Nos Sea Trunk(Mer & Dgr) High Seachest Suction400350 1 Nosmain S/W Pp Suction Fromsea Trunk4002001 Nosaux S/W Ppsuction Fromsea Trunk 4002001 Noscentral Cooler Overboard4001502 Nos , Supplementary Defect List219 A - Fire & Gs Pumpsuction 400 150 1 Nosbilge & Fire Pump Suction 400 1251 Nosballast Pumpsuction400 1501 Nosballast Pumpoverboard300 125 1 Nosemergency Fire Pump Suction 4001251 Nosa/C Sw Pump Suction 400 150 1 Nosa/C Sw Pumpoverboard400 1251 Nosro Plantsea Tube Suction400501 Noshdgs/W Suction400 651 Noshdg Overboard 400651 Nosbilgesystemoverboard 400125 1 Nosorooverboard4001501 Noseductorno. 1 To 6Overboard 400 803 Noswhr Plant Sw Pump Suction &Overboard 400 80 2 Nosmagazineflooding Valve Suction400150 1 Nosair Blow Throughvalve Sea Chest400 40 4Nosvent Pipe Valve Sea Chest 400 1004 Nos , Supplementary Defect List220 - Both Pc Boat Engine Fuel Service Tank Leaking And Pin Holed At Various Places. Tanks To Be Renewed As Per Sample And Fitted In Position. Frp Coating In The Surrounding Of Filling Pipe To Be Carried Out. Frp Area-1Ftx1ft., Size Of Tank-3Ft X 3Ft X 2Ft. Material-Aluminium. Qty-02 Nos.,Thickness Of Plate-5Mm.Materials Firm Supply. Material – Firm Supply , Supplementary Defect List221 - Ahu No.1,2 And 3 Heat Exchanger Damper And Coil Bottom Tray Corroded And Deteriorated. To Be Renewed As Per Sample. Size-6 Ft X6 Ft. Material – Firm Supply , Supplementary Defect List222 - Ahu No.1,2 And 3 Eliminators Fins (Material-Gi) Corroded And Damaged. To Be Renewed And Fitted In Position As Per Sample. . Material – Firm Supplya) Ahu No. 1 Size:1210 Mm X 1100 Mm - 1 Nosb) Ahu No. 2 Size:890 Mmx 1290 Mm - 1 Nosc) Ahu No. 3 Size:890Mm X 861 Mm. - 1 Nos , Supplementary Defect List223 - Drain Pipe Of Cool Room And Cold Roomevaporator Coil Tray Deteriorated And Heating Coil Defective. Pipes And Heating Coil (Capacity - 40 W) To Be Renewed. Pipe Mat:- Cu; Length: 08 Mtr; Dia- 25 Mm. Material And Heating Coil –Firm Supply , Hull224 - Underwater Storm Valves To Be Overhauled And Pressure Tested Total Qty 08,Nos, Size - 80 Mm. Scope Includes Renewal Ofall Spares Including Spindle,Wheelandvalveseat.Testpressure- 1.5Timesworking Pressure. Pressure Test Certificate To Be Issued. Material Firm Supply. , Hull225 - Oro Tank Breather Pipe At Qtr Deck Corroded And Holed. To Be Renewed,Length- 4 M, Dia- 120 Mm, Mat- Ms With 02 Flanges And Securingbracket At Deck. Material Firm Supply , Hull226 - 04Nogatevalves(80Mm), 04Nosdnr Valves(80 Mm)And01no Educatorofsewage System Pumpingoutfacility To Be Overhauled And Pressuretested.Wpforgatevalves- 4Bar,Sdnrvalve- 8Bar, Overhauling Of Valves Include Replacement Of Spares Including Valve Seat,Spindle And Hand Wheels. Mat -Firm Supply1) 04Nogatevalves(80Mm) - 4 Nos2) 04Nosdnr Valves(80 Mm) - 4 Nos3) 01No Educator - 1 Nos , Hull227 - Tank Breathers Of Various Sizes To Be Removed From Deck, Side Covers, Ball Valve To Be Dismantled And Checked Forfoul Proofoperation. Side Coversof Allbreathers Toberenewedalongwithwire Meshand Fastenings.Total, Big Size - 13 No, Small Size - 33 No. Deck Pieces Of 10 No Tank Breathers To Be Renewed. Pipe- Dia- 65 Mm. Mat-Firm Supplymateriai Firm Supply. Mat For Side Cover And Pipe-Ms, Mat For Wiremesh - Ss. . Material – Firm Supply , Air Conditioning ( Make Heinen And Hofman, Kolkata)228 - Cleanventtrunkingofallac Systems, Blow Through By Compressed Air Fromahu To Serving Compartments. Balancing Damper/ Control Flaps To Be Moved /Lubricated For Smooth Operation. 60 Controlflaps/Balancing Damper. Mat-Firm Supply. , Air Conditioning ( Make Heinen And Hofman, Kolkata)229 - 12 No Automaticfire Dampers Of Ventilation System At Various Locations To Be Overhauledfor Smooth Operation. Location I No Fitted - Main Deck-05 Nos, 01 Deck- 02 Nos, 02 Deck- 05 Nos (Size- 300X150-02 Nos, 500X 350-02 No, 500X150- 01No, 500X300- 01No, 500X400-01No, 500X200-03 No,450X250 -02Nos) Mat- Firm Supply , Air Conditioning ( Make Heinen And Hofman, Kolkata)230 - 136Innos.Diffuserofa/Csystemtobeopenedinternally Clean,Except For Renewal Of Diffusers Overhauled And Check For The Proper Function. Firm To Cater For Renewalof Operatingmechanism Rod (50 No) And Knob (50 No). After Overhauling Of The Same To Be Fitted Back.Firm To Cater For Renewal Of 20 No. New Diffusers. Mat- Firm Supplya) 136Innos.Diffuserofa/Csystemtobeopenedinternally Cleanb) Firm To Cater For Renewal Of 20 No. New Diffusers , Air Conditioning ( Make Heinen And Hofman, Kolkata)231 - Spiral Ductofair Conditioningtocompartments Perishedand Leaking.Spiral Duct Alongwith Insulation To Be Renewed. All In-Way Jobs Included. Length- 10 Mtr, Size-80 Mm Mat-Firm Supply. Location : Aviationoffice, 02 Deck Alleyway , Officer Cabins, 01Deck Etc. , Air Conditioning ( Make Heinen And Hofman, Kolkata)232 - Deck Drain Pipes To Be Dismantled, Chemically Cleaned And Pressure Tested To 2.0 Bar. Refit The Pipe After Application Of Two Coat Of Paints. In Way Jobs Includes Removal And Re-Fitment Of Paneling. Material – Gi Pipes. Mat- Firm Supply Paint Firm Supply. Scope Includes Renewal Of Flanges (If Found Deterioted)And 200 Nos, M-16, Ss-304 Fasteners Also. Mat- Firm Supplya) Deck Pipe Size 80 Nb-40 Mtrsb) Deck Pipe Size 100 Nb-40 Mtrs , Air Conditioning ( Make Heinen And Hofman, Kolkata)233 - Helo Deck Drain Pipes To Be Dismantled Chemically Cleaned And Pressure Tested To 2.0 Bar. Refit The Pipe After Application Of Two Coats Of Paint. Size – 80 Nb – 60Mtr, And 50 Nb – 30Mtr, Material – Gi Pipes. Paint Firm Supply. Scope Includes Renewal Of Flanges (If Found Deterioted)And 200 Nos, M-16, Ss-304 Fasteners Also. Mat- Firm Supplya) Deck Pipe Size- 30 B) Deck Pipe Size – 15 Mtsmaterial – Firm Supply , Air Conditioning ( Make Heinen And Hofman, Kolkata)234 - Deck Drain Of Provision Room And Wheel House Wc And Officers Combined Bath Room Chocked And Need To Be Removed, Cleaned And Fitted Back. Job Involves Removal And Re-Fitment Of Modular Paneling Below The Deck/ Accommodation. Length- Wheel House Wc- 10 M, Officers Combined Bath- 05 Mtr, Prov Store – 06 Mtr. Material – Firm Supply , Air Conditioning ( Make Heinen And Hofman, Kolkata)235 - Grey Water Drain Pipes From Co Pantry , Officers Pantry, Officers Bath Rooms, So Pantry, Galley Deck, Scullery, Water Coolers, So Bath Rooms, P Nvks Bath Rooms And Nvk Bath Rooms To Be Chemically Cleaned And Pressure Tested. On Completion Two Coat Of Paint To Be Applied. Job Involves Removal And Refitment Of Internal Paneling At Accommodation Areas. Size- 80 Mm Dia, Length- 80 Mtr. Mat- Firm Supply Paint- Firm Supply. , Evac Vacuum Toilets, Make-Zodic (Evac System), Model Evac 90, Kandre (Toilets- 23 And Urinals- 06 No)Firm : M/S Vacman Sanitation Solution.236 - Remove And Chemically Clean All Soil Pipes. Pipes To Be Pressure Tested Up To 6.5 Bar. Gasket Of All Flanges To Be Renewed And Pipes To Be Refitted And System To Be Proved For Vacuum. (Lengt-170 Mtrs, Size – 65 Nb, No. Of Flanges – 50 Nos). Mat- Ss, Chemical Cleaning By Robotic Technology To Be Undertaken On Inaccessible Pipe Lines. Mat- Ss. Presently System Is Under Aiamc By M/S Vacman Sanitation Solutions. Material – Firm Supply , Anchor Windlass(Make – Rollsroyce ) (Hydraulic Operated ),Model (Bcm 41-10),Qty- 02 Nos237 - High Pressure Hydraulic Piping System For Windlass To Be Dismantled, Cleaned And Pressure Tested (Size – 80 Nb, Mat. Ss, Length – 50 Mtrs) Working Pressure 57 Bar, Test Pressure 85 Bar. Firm To Take Precautions- Motors / Pump, Non-Return Valve, Change Over Valve And Filters To Be By Passed During The Chemical Cleaning.Air Release Purging Cocks (04 Nos ) On Pipe Lines To Be Renewed. Firm To Cater For Renewal Of 10 Mtrs- 40 Pipe Lines And 04 No Deck Flanges. Mat- Firm Supply. Except For Renewal Of Pipe And Deck Flanges. Material - Firm Supply , Mooring Capstan Make –(Rollsroyce ) (Hydraulic Operated ),Model-Mx2208,Qty- 02 Nos.238 - High Pressure Hydraulic System Piping For Capstan To Be Dismantled Chemically Cleaned And Pressure Tested (Size – 80 Nb, Mat. Ss, Length – 42 Mtrs) Working Pressure 57 Bar, Test Pressure 87Bar. Firm To Undertake Precautions For Motors / Pump, Non-Return Valve, Change Over Valveand Filters Or By Passed During The Chemical Cleaning. Mat- Firm Supply. , Sewage Discharge Pump, Make – Garbarino, Type – Centrifugal Pump. Capacity – 20 Tph239 - System Pipe Lines Connected With Sewage Holding Tank And Overboard Discharge System To Be Removed, Chemically Cleaned. Pipes To Be Pressure Tested Up To 6.5 Bar. Neoprene Rubber Gaskets Of All Flanges To Be Renewed And Pipes To Be Refitted And System To Be Proved. Scope Includes Replacement Of Deteriorated Ss Fasteners (M-16 X 10 Nos). Ss-304 , Length-45 Mtr, Size – 65 Nb, No. Of Flanges – 24 Nos. Material – Firm Supply , Galley Grease Tank And Associated Fittings240 - 06 Nos Screw Down Valves Of Galley Grease Tank To Be Overhauled And Pressure Tested Upto 04 Bar. Overhauling Of Valves Include Renewal Of Valve Seat, And Spindle Also.Size – 65 Nb. Material – Firm Supply , Galley Grease Tank And Associated Fittings241 - System Pipe Line Connected With Galley Grease Tank And Overboard Discharges System To Be Opened, Chemically Cleaned And Pressure Tested Upto 06 Bar. Material – Gi Pipe, Size – 65 Nb. Length – 08 Mtr. Nb Of Flanges – 10. Scope Includes Renewal Of Deteriorated Fasteners (Size – M-16 X 08 Nos). Material Firm Supply And Spares – Cg Supply. , Provision Lift, Make- M/S Sivam Elevators242 - Provision Lift, Make- M/S Sivam Elevators:- Entire Provision Lifts Mechanism To Be Overhauled And Proved For Satisfactory Operations. Scope Includes Following:-(I) Overhauling Ofhydraulic Pump.(Ii) Overhauling Of Hydraulic Power-Pack And Ram.(Iii) Overhauling Of Traversing Mechanism.(Iv) Check The Structural Parts Of Provision Lift And Tightness Of All Fasteners. Undertake Repair If Necessary.(V) Remove The Wire Rope And Examine For Serviceability, Clean Corrosion Marks If Any, Greased And Fit Back. If Rope Found Frayed / Damaged, Renew The Same.(Vi) Clean The Hydraulic Oil Storage Tank With All Associated Systems And Valves And Re-Set Counter Balancing Valves Accordingly.(Vii) Overhauling Of Provision Lift Includes Supply Of All Spares.(Viii) On Completion Of Overhaulingprove The Lift For Swl -220 Kg,Static – 375 Kg, Mat/ Spares – Cg Supply. Complete Overhauling Of Provision Lifts Mechanism And Proved For Satisfactory Operation. All Inway Jobs Included. Spares - Cg Supply Material - Firm Supply , Hangar Telescopicsystem Gear Box, Make- Norcrane, Dealer – Sew-Eurodrive India Pvt Ltd, Mumbai243 - Hangar Telescopic Traverse Operating Mechanism Gear Box To Be Overhauled. Clutches To Be Dismantled And Overhauled. All Sheaves To Be Overhauled. Track Assembly To Be Overhauled And Lubricated. Minor Oil Leakage Observed From Helo Hangar Gear Box Seals And Drain Plug. To Be Repaired. All Seals And Oil To Be Changed. Spares -. Material Firm Supply And Spares – Cg Supply. , Hangar Telescopicsystem Gear Box, Make- Norcrane, Dealer – Sew-Eurodrive India Pvt Ltd, Mumbai244 - Hangar Track Rollers Constrained To Move Freely In The Recessed Track. Suspect Wheel Block Assembly Securing Loosened And Obstructs The Side Of Track. 08 No Wheel Block Assembly Arrangement To Be Removed And Overhauled And Refitted. . Material Firm Supply And Spares – Cg Supply. , Hangar Telescopicsystem Gear Box, Make- Norcrane, Dealer – Sew-Eurodrive India Pvt Ltd, Mumbai245 - Helo Hangar Shutter Operating Gear Box To Be Overhauled And Gear Box To Be Proved For Smooth Operation. Spares Cg Supply Except Shaft, Gears And Casing.. Material Firm Supply And Spares – Cg Supply. , Miscellaneous Defects246 - Magazine Flood Valve To Be Overhauled. Rod Gearing Arrangement For Operating Flood Valve From Foxleto Be Overhauled And Proved For Smooth Operation. Rod Gearing Extend From Foxle Deck To Magazine Compartment At 3Rd Deck. Material – Firm Supply , Supplementary Defect List247 - Gemini Deck Scupper Lipscorroded And Uprootedfromedges. To Be Renewed. No Of Scuppers. - 06 Nos. Size Of Scupper- 200Mmx 200Mm X40mm Mat- Ms .Material – Firm Supply , Supplementary Defect List248 - Wheelhousewindow Wiper Fresh Water Pipe Linecorroded And Deteriorated To Be Renewed Pipe Line. Material Cu-Ni, Length Of Pipe -6 Mtr, Dia - 15 Mm Material And Pipe Line- Firm Supply. Material – Firm Supply , Lub Oil Priming Pump Motor (M/S Mez Lonne)249 - Overhaul 02 In No Lo Priming Pump Motors 415V, 3Phase, 50Hz, 5.5Kw, (Make- Mez Lonne, 7Ba132s02k). Overhauling Includesrecord Of Insulation Prior Dismantling Of Motor And Withdraw Rotor, Renewal Of De/Nde Ball Bearing, Painting Ofheat Resistive Paint On External/Internal Of Yoke, Apply Of Varnish And Baking Up, Renewal Of All Consumable, Recording Of Insulation And Proving Of Motor For Satisfactory Operation On Completion Of Overhauling.(Maintenance Schedule No. Lp-45). Spares – Cg Supplymaterial – Firm Supply , Main Engine Pre Heater (M/S Grundfos)250 - Overhaul 02 In No Main Engine Preheating Feed Pump Motors 415 V, 3 Phase, 50Hz, 0.37Kw, (Make- Grundfos, Tp40-80-2Ae-E-A-Auue). Overhauling Includes Record Of Insulation Prior Dismantling Of Motor And Withdraw Rotor, Renewal Of De/Nde Ball Bearing, Painting Of Heat Resistive Paint On External/Internal Of Yoke, Apply Of Varnishandbakingup, Renewalofallconsumable,Recording Of Insulationand Proving Of Motor For Satisfactory Operation On Completion Of Overhauling. (Maintenance Schedule No. Lp-45) Spares – Cg Supply Material – Firm , Fuel Oil Booster Pump Motor For Main Engine (Stand By)(M/S Mez Lonne)251 - Overhaul 02 In No Main Engine Fuel Oil Booster Pump Motors (Standby Motor) 415V, 3Phase, 50Hz, 1.5Kw, (Make- Mez Lonne, 7Aa90s02). Overhauling Includes Record Of Insulation Prior Dismantling Of Motor And Withdraw Of Rotor, Renewal Of De/Nde Ball Bearing (6204-Zz/C3), Painting Of Heat Resistive Paint On External/Internal Of Yoke, Apply Of Varnish And Baking Up 10 Hour, Recording Of Insulation, Starting/Running Current And Proving Of Motor For Satisfactory Operation On Completion Of Overhauling. (Maintenance Schedule No. Lp-45). Spares – Cg Supplymaterial – Firm Supply , Sludge Motor (M/S Allweler)252 - Overhaul 01 In No Sludge Motor 415 V, 3 Phase, 50Hz, 2.6Kw, (Make- Allweler, 40-131/0222-S1-Ne-W5). Overhauling Includes Record Of Insulation Prior Dismantling Of Motor And Withdrawal Of Rotor, Renewal Of De/Nde Ball Bearing, Painting Of Heat Resistive Paint On External/Internal Part Of Yoke, Apply Of Varnish And Baking Up, 10 Hour, Recording Of Insulation, Starting/Running Current And Proving Of Motor For Satisfactory Operation On Completion Of Overhauling.(Maintenance Schedule No. Lp-45). Spares – Cg Supplymaterial – Firm Supply , Fire & Gs Pump (M/S Brook Crompton)253 - Overhaul 02 In No Fire/Gs Pump Motors 415 V, 3 Phase, 50Hz, 55Kw, (Make- Brook Crompton, T-Df250m2). Overhauling Includes Record Of Insulation Prior Dismantling Of Motor And Withdrawal Of Rotor, Renewal Of De/Nde Ball Bearing (6414C3), Painting Ofheat Resistive Paint On External/Internal Of Yoke, Apply Of Varnish And Bakingupupto10hours,Renewalofallconsumable,Recordingofinsulation, Starting /Running Current. Proving Of Motor For Satisfactory Operation On Completion Ofoverhauling.Allmaterials/Sparestobesuppliedunderscopeof Firm.(Maintenance Schedule No. Lp-25) Spares – Cg Supplymaterial – Firm Supply , Fire & Gs Pump (M/S Brook Crompton)254 - Overhaul 02 In No Fire/Gs Pump Motor Control Panel (M/S Marine Electrical). Servicing Includes Star Delta Starter Magnetic Contactor (Lc1-D80m7), Rated 80A With Operating Coil 220-240V Ac With 1No+1Nc - Qty 04 Nos) And Contactor (Lc1- D50am7), Rated 50A With Operating Coil 220- 240V Ac, 1No+ 1Nc Qty- 02 No, Control Transformer(415 /230V, 200Va, Qty- 02 Nos), On Delay Electronic Timer Range(110-240V Ac With 2No+2 Nc Contact, Qty-02 No, La2-Kt2u), Pneumatic On Delay Timer (Rang 0.1 To 30 Sec With 1No+1Nc, Qty- 02 No, Lad-T2), 230V Ac Relays 2 C/O With Led And Base Along With Clamp, Qty-06 Nos, Rsb2a080p7s) Calibrate Over Load Relay Range,48-65A, Lrd-3359 Qty-2 Nos), Ammeter (0-150A/900A, Ctr 150/5A,Eq72-11095Cja6, Size 72X72 Qty-02 No). Starter To Be Provedforsatisfactoryoperationoncompletionofoverhaulingwithmotor.Calibration Certificate With Limits To Be Handed Over To Ship. (Maintenance Schedule No. Lp-25) Spares – Cg Supply Material – Firm Calibration Certificate To Be Provide By Firm. , Bilge & Gs Pump (M/S Brook Crompton)255 - Overhaul 01 In No Bilge /Gs Pump Motor 415V, 3Phase, 50Hz, 22Kw, (Make- Brookcrompton, Sl-014300). Overhauling Includes Record Of Insulation Prior Dismantling Of Motor And Withdrawal Of Rotor, Renewal Of De/Nde Ball Bearing (6313C3), Painting Ofheat Resistive Paint On External/Internal Of Yoke, Apply Of Varnish And Baking Up 10 Hours, Renewal Of All Consumable, Recording Of Insulation, Starting/Running Current And Proving Of Motor For Satisfactory Operation On Completion Of Overhauling. (Maintenance Schedule No. Lp-44)Spares – Cg Supply Material – Firm Supply , Bilge & Gs Pump (M/S Brook Crompton)256 - Overhaul 01 In No Control Panel Of Bilge/Gs Pump Motor (M/S Marine Electrical). Servicing Includes Star Delta Starter, Magnetic Contactor (Lc1-D25m7, Rated 25A With Operating Coil 220-240V Ac With 1 No+1 Nc, Qty-03 Nos), Control Transformer (1 Ph Double Wound 415/230V 100Va Qty-01No), Ammeter (0-50A/300A, Qty-01),On Delay Electronic Timer (110-240V Ac Having 1... 30 Sec, Qty-01 No, La2-Kt2u), Pneumatic On Delay Timer (Rang 0.1To 30 Sec With 1No+1Nc, Qty- 01 No, Lad- T2), 230V Ac Relays 2 C/O With Led And Base Along With Clamp, Qty-03 Nos, (Rsb2a080p7s). Calibrate Bimetallic Over Load Relay (Lrd-22) Range, 16-24A,( Qty-01 No). Starter To Be Proved For Satisfactory Operation On Completion Of Overhauling Ofmotor.Calibrationcertificatewithlimitstobehandedovertoship.(Maintenance Schedule No. Lp-44) Spares – Cg Supplymaterial – Firm Supplyall In Way Jobs Included.Calibration Certificate To Be Provide By Firm. , Bilge Pump Motor (M/S Noro)257 - Overhaul 01 In No Bilge Pump Motor 415V, 3Phase, 50Hz, 12.7Kw, (Make- Noro, Sk71l/2). Overhauling Includes Record Of Insulation Prior Dismantling Of Motor And Withdrawal Of Rotor, Renewal Of De/Nde Ball Bearing (6309-Zz & 6309-Zz), Painting Of Heat Resistive Paint On External/Internal Of Yoke, Apply Of Varnish And Baking Up 10 Hours, Renewal Of All Consumable, Recording Of Insulation, Starting/ Running Currentandprovingofmotorforsatisfactoryoperationoncompletionof Overhauling. (Maintenance Schedule No. Lp-45) Spares – Cg Supply Material – Firm Supply , Bilge Pump Motor (M/S Noro)258 - Overhaul 01 In No Control Panel Of Bilge / Gs Pump Motor (M/S Marine Electrical). Servicing Includes Star Delta Starter Magnetic Contactor {( Lc1-D12m7 C)Rated 12A With Operating Coil 220-240V Ac With 1No+1Nc Qty-03 With Contact Block Side Mounted,Lad-8N11)},Controltransformer(Transformer1phdoublewound 415/230V,50Hz,100Vaqty-01),Timedelayrelay(Pneumaticondelaytimer Range 0.1....30S With 1No+1Nc Contact, Lad –T2, Qty-01 230V Ac Relays 2 C/O With Led And Base Along With Clamp, Qty-03 Nos, Rsb2a080p7s).Calibrate Direct Reading Type Ammeter Rated 0-40 A/240A Size 72X72, Eq72-11045A Qty-01,And Over Load Relay (Bimetallic Over Load Relay Range 12-18A,( Lrd-21), Qty-01. Starter To Be Proved For Satisfactory Operation On Completion Of Overhauling With Motor. Record Starting And Running Current. Calibration Certificate With Limits To Be Handed Over To Ship Staff. Spares – Cg Supplymaterial – Firm Supplyall In Way Jobs Included.Calibration Certificate To Be Provide By Firm. , Ballast Pump (M/S Brook Crompton)259 - Overhaul 02 In No Ballast Pump Motors 415 V, 3 Phase, 50Hz, 55Kw, (Make- Brook Crompton, T-Df250m2). Overhauling Includes Record Of Insulation Prior Dismantling Of Motor And Withdrawal Of Rotor, Renewal Of De/Nde Ball Bearing (6313C3), Painting Ofheat Resistive Paint On External/Internal Part Of Yoke, Apply Of Varnish Andbakingup10hours,Renewalofallconsumable,Recordingofinsulation, Starting/Runningcurrentandprovingofmotorforsatisfactoryoperationon Completion Of Overhauling. (Maintenance Schedule No. Lp-26) Spares – Cg Supplymaterial – Firm Supply , Ballast Pump (M/S Brook Crompton)260 - Overhaul 02 In No Control Panel (M/S Marine Electrical) Of Ballast Pump Motor Servicing Includes Star Delta Starter Magnetic Contactor (Lc1-D80m7), Rated 80A With Operating Coil 220-240V Ac With 1 No+1Nc- Qty -04 Nos), Contactor (Lc1- D50am7),Rated50awithoperatingcoil220-240Vac,1No+1Nc,Qty-02No, Control Transformer (415 /230V, 200Va, Qty- 02 Nos), Pneumatic On Delay Timer (Range 0.1 To 30 Sec With 1No+1Nc, Qty- 02 No, Lad-T2), 230V Ac Relays (Rsb2a080p7s) 2 C/O With Led And Base Along With Clamp, Qty-06 Nos, . Calibrate Of Over Load Relay, (Lrd-3359), 48-65A, Qty-2 Nos), Ammeter (0-150A/900A, Ctr 150/5A, Eq72-11095Cja6, Size 72X72 Qty-02 No). Starter To Be Proved For Satisfactoryoperationoncompletionofoverhaulingwithmotor.Calibration Certificate With Limits To Be Handed Over To Ship. Spares – Cg Supply Material – Firm Supply Calibration Certificate To Be Provide By Firm. , Emergency Fire Pump (M/S Mez)261 - Overhaul 01 In No Emergency Fire Pump Motor 415 V, 3Phase, 50Hz, 15Kw, (Make- Mez, Mot 7Va160m02). Overhauling Includes Record Of Insulation Prior Dismantling Ofmotorandwithdrawofrotor,Renewalofde/Ndeballbearing(6309-Zz), Painting Of Heat Resistive Paint On External/Internal Part Of Yoke, Apply Of Varnish And Baking Up 10 Hours, Renewal Of All Consumable, Recording Of Insulation, Starting/Running Current And Proving Of Motor For Satisfactory Operation On Completion Of Overhauling.(Maintenance Schedule No. Lp-44) Spares – Cg Supply Material – Firm , Emergency Fire Pump (M/S Mez)262 - Overhaul 01 In No Emergency Fire Pump Motor Control Panel (M/S Marine Electrical). Overhauling / Servicing Includes Star Delta Starter Magnetic Contactor (Lc1-D25m7), Rated 25 A With Operating Coil 220-240V Ac With 1No+1Nc - Qty 02 Nosaux.Contactor(Lc1-D12m7),Rated12awithoperatingcoil220-240Vac, 1No+1Nc, Qty- 01No, ), Control Transformer (415 /230V, 100Va, Qty- 01Nos), 230V Ac Relays(Rsb2a080p7s), 2 C/O With Led And Base Along With Clamp, Qty-03 Nos). Calibrate Over Load Relay (Lrd-22) Rated, 16-24A, Qty-01 No). Calibrate Pneumatic On Delay Timer (Lad- T2), Range 0.1 – 30 Sec With 1 No + Nc, Qty 01 No, Ammeter (0-40A / Max. 240A, Eq 72-11045A, Size 72X72, Qty-01). Starter To Be Proved For Satisfactory Operation On Completion Of Overhauling With Motor.Calibration Certificate With Limits To Be Handed Over To Ship. (Maintenance Schedule No. Lp-44). Spares – Cg Supplymaterial – Firm Supply Calibration Certificate To Be Provide By Firm. , Whr Plant (M/S Technoprocess) (Pac Firm – M/S Technoprocess)263 - Overhaul 02 In No Sw Pump Motors 415 V, 3 Phase, 50Hz, 7.5Kw, (Make- Johnson Pump). Overhauling Includes Record Of Insulation Prior Dismantling Of Motor And Withdrawal Of Rotor, Renewal Of De/Nde Ball Bearing (6308-Zz), Painting Of Heatresistive Paint On External/Internal Part Of Yoke, Apply Of Varnish And Baking Up 10 Hour. Recording Of Insulation, Starting/Running Current And Proving Of Motor For Satisfactory Operation On Completion Of Overhauling. (Maintenance Schedule No. Lp-44). Spares – Cg Supplymaterial – Firm Supply , Whr Plant (M/S Technoprocess) (Pac Firm – M/S Technoprocess)264 - Overhaul 02 In No Sw Pump Motor Control Panel Of Whr. Overhauling Includes Servicing Of Magnetic Contactor (3Tf32 00-0A, Qty – 02 Nos), Rated, 16 A, Control Transformer (415/230 V, 50 Va, Qty – 02 Nos) Calibration Of Over Load Relay(3Ua5200-2B,Qty–02Nos)Range12.5–20A.Startertobeprovedfor Satisfactoryoperationoncompletionofoverhaulingwithmotor.Calibration Certificate With Limits To Be Handed Over To Ship. Spares – Cg Supply Material – Firm Supply Calibration Certificate To Be Provide By Firm. , Fw Hydrophore (M/S Brook Crompton)265 - Overhaul 02 In No Fresh Water Hydrophore Motors 415 V, 3 Phase, 50Hz, 5.5Kw, (Make- Brook Crompton, Iec-34-1). Overhauling Includes Record Of Insulation Prior Dismantling Of Motor And Withdrawal Of Rotor, Renewal Of De/Nde Ball Bearing (6308-Zz), Painting Of Heat Resistive Paint On External/Internal Of Yoke, Apply Of Varnish And Baking Up For 10 Hour. Record Of Insulation, Starting/Running Current And Proving Of Motor For Satisfactory Operation On Completion Of Overhauling. (Maintenance Schedule No. Lp-29) Spares – Cg Supplymaterial – Firm Supply , Fw Hydrophore (M/S Brook Crompton)266 - Overhaul 02 In No Fw Hydrophore Control Panel Overhauling Includes Servicing Of Magnetic Contactor, Control Transformer (415/110V, Qty- 01 No), Auto Cut In /Cut Off Pressure Switch (250 V, 15 A, 0.5 Hp, Qty- 02 Nos), Aux.Ac Relay 110 V, 7A, Qty-09, Calibration Of Over Load Relay (D0913)Range, 09 – 14 A, Qty – 02 Nos), Starter To Be Proved For Satisfactory Operation On Completionof Overhauling With Motor.Calibrationcertificatewithlimitstobehandedovertoship. Spares – Cg Supply Material – Firm Supply Calibration Certificate To Be Provide By Firm. , Jet Water Hot Water Pump Motor (M/S Garbarino, Italy)267 - Overhaul 01 In No Motor 415 V, 3 Phase, 50Hz, 2.2Kw, (Make- Garbarino, Italy, Nm3/Ae). Overhauling Includes Record Of Insulation Prior Dismantling Of Motor And Withdrawal Of Rotor, Renewal Of De/Nde Ball Bearing (6304-Zz), Painting Of Heatresistive Paint On External/Internal Part Of Yoke, Apply Of Varnish And Baking Up For 10 Hour. Recording Of Insulation, Starting/Running Current And Proving Of Motor For Satisfactory Operation On Completion Of Overhauling. (Maintenance Schedule No. Lp-44). Spares – Cg Supply Material – Firm Supply , Cooling System Motor268 - The Under Mentioned Cooling System Motor To Be Overhauled. Overhauling Includes Record Of Insulation Prior Dismantling Of Motor And Withdrawal Of Rotor, Renewal Of De/Nde Ball Bearing As Mentioned Against Each. Painting Of Heat Resistive Paint On External/Internalpartofyoke,Applyofvarnishandbakingupfor10hour. Recordingofinsulation,Starting/Runningcurrentandprovingofmotorfor Satisfactory Operation On Completion Of Overhauling.(Maintenance Schedule No. Lp-27 & 28).Spares – Cg Supply Material – Firm Supply Description Specificationmakeqty Bearingfw Lt415v, 3Phase,M/S Brook 046309-Zzcirculating Pump 50Hz, 15 Kwcromptonmotorforda& Me ( Lt-1, 2, 3 & 4)Fwlt415v, 3 Phase, M/S Mez01---------Circulating Pump50hz, 22 Kw,Motor (Back Up)Me&Dasw415v, 3Phase,M/S Brook046309-Zzcooling Pump50hz, 15 Kw,Cromptonmotor , Cooling System Motor269 - The Under Mentioned Control Panel Of Sea Water Cooling System (M/S Marine Electrical) To Be Overhauled. Servicing Includes Main And Aux. Contractor, Calibration Of Overload Relay, Cut Out And Renewal Of Defective Components Not Within Limits. Starter To Be Proved For Satisfactory Operation On Completion Of Overhauling With Motor. Calibration Certificate With Limits To Be Handed Over To Ship.Spares – Cg Supplymaterial – Firm Supplycalibrationcertificatetobeprovide By Firm.Description Specification Qty A)Fw Lt Circulating415v, 3 Phase,01 Nopumpmotor50hz, 22 Kw(Back Up)B)Fwlt 415V, 3 Phase,04 Nocirculating Pump 50Hz, 15 Kwmotor For Da & Me (Lt-1, 2, 3 & 4)C)Me & Da Sw415v, 3 Phase, 04 Nocooling50hz, 15 Kw,Pump Motor , Fuel Oil Transfer Pump Motor (M/S Mez)270 - Overhaul 02 In No Fuel Oil Transfer Pump Motors 415 V, 3 Phase, 50Hz, 6.5Kw, (Make- Mez). Overhauling Includes Record Of Insulation Prior Dismantling Of Motor And Withdrawal Of Rotor, Renewal Of De/Nde Ball Bearing (6308C3), Painting Of Heat Resistive Paint On External/Internal Part Of Yoke, Apply Of Varnish And Baking Up For 10 Hour. Recording Of Insulation, Starting/Running Current And Proving Of Motor For Satisfactory Operation On Completion Of Overhauling. Maintenance Schedule No. Lp-45). Spares – Cg Supplymaterial – Firm Supply , Lub Oil Transfer Pump Motor (M/S Mez)271 - Overhaul 02 In No Lub Oil Transfer Pump Motors 415V, 3Phase, 50Hz, 2.2Kw, (Make- Mez). Overhauling Includes Record Of Insulation Prior Dismantling Of Motor And Al Of Rotor, Renewal Of De/Nde Ball Bearing (6308C), Painting Of Heat Resistive Paint On External/Internal Part Of Yoke, Apply Of Varnish And Baking Up For 10 Hour. Recording Of Insulation, Starting/Running Current And Proving Of Motor For Satisfactory Operation On Completion Of Overhauling.(Maintenance Schedule No. Lp-45). Spares – Cg Supplymaterial – Firm Supply , Lub Oil Transfer Pump Motor (M/S Mez)272 - Overhaul 01 In No Hydraulic Lub Oil Transfer Pump Motor 415 V, 3 Phase, 50Hz,2.2Kw, (Make- Mez). Overhauling Includes Record Of Insulation Prior Dismantling Of Motor And Withdrawal Of Rotor, Renewal Of De/Nde Ball Bearing, Painting Of Heat Resistive Paint On External/Internal Part Of Yoke, Apply Of Varnish And Baking Up For10 Hour. Recording Of Insulation, Starting/Running Current And Proving Of Motor For Satisfactory Operation On Completion Of Overhauling.Spares – Cg Supplymaterial – Firm Supply , Avcat Transferpump Motor (M/S Cemp)273 - Overhaul 01 In No Avcat Fuel Transfer Pump Motor 415 V, 3 Phase, 50Hz, 2.9Kw, (Make- Cemp). Overhauling Includes Record Of Insulation Prior Dismantling Of Motor And Withdrawal Of Rotor, Renewal Of De/Nde Ball Bearing (6205-Zz), Painting Of Heat Resistive Paint On External/Internal Part Of Yoke, Apply Of Varnish And Baking Up For 10 Hour. Recording Of Insulation, Starting/Running Current And Proving Of Motorforsatisfactoryoperationoncompletionofoverhauling.(Maintenance Schedule No. Lp-44). Spares – Cg Supply Material – Firm Supply , Avcat Transferpump Motor (M/S Cemp)274 - Overhaul 01 In No Avcat Service Transfer Pump Motor 415V, 3Phase, 50Hz, 2.2Kw, (Make- Cemp). Overhauling Includes Record Of Insulation Prior Dismantling Of Motor And Withdrawal Of Rotor, Renewal Of De/Nde Ball Bearing (6205-Zz), Painting Of Heat Resistive Paint On External/Internal Part Of Yoke, Apply Of Varnish And Baking Up For 10 Hour. Recording Of Insulation, Starting/Running Current And Proving Of Motor For Satisfactory Operation On Completion Of Overhauling. Spares – Cg Supply Material – Firm Supply , Avcat Transferpump Motor (M/S Cemp)275 - Overhaul 02 In No Transfer And Service Pump Motor Control Panel. Overhauling Includes Starter Magnetic Contactor (Lc1-K0910m7), Rated 9A With Operating Coil 230-240 V Ac With 1No,Qty -2 No, 230 V Ac Relay ( Rsb2a080p7s), 2 C/O With Led And Base Along With Clamp, Qty 06 Nos), Control Transformer (415/230 V, 50Va), Qty 02 No. Calibrate Over Load Relay (Lr2-K0314), Range 5.5 – 8A, Qty–02No. Starter To Be Proved For Satisfactory Operation On Completion Of Overhauling With Motor. Calibration Certificate With Limits To Be Handed Over To Ship. Spares – Cg Supplymaterial – Firm Supply Calibration Certificate To Be Provided By Firm. , Dispersant Transfer Pump Motor (M/S Vn-Pumpen Hqyer )276 - Overhaul 01 In No Dispersant Transfer Pump Motor 415 V, 3 Phase, 50Hz, 4Kw, (Make- Vn-Pumpen Hqyer Motors). Overhauling Includes Record Of Insulation Prior Dismantling Of Motor And Withdrawal Of Rotor, Renewal Of De/Nde Ball Bearing (6306 2Rs1/C3), Painting Of Heat Resistive Paint On External/Internal Part Of Yoke, Apply Of Varnish And Baking Up For 10 Hour. Recording Of Insulation, Starting/Running Currentandprovingofmotorforsatisfactoryoperationoncompletionof Overhauling. (Maintenance Schedule No. Lp-45) Spares – Cg Supplymaterial – Firm Supply , Cpp (M/S Rolls Royce)277 - Overhaul Following Motors Of Cpp And Gear Box Motors. Overhauling Includes Record Of Insulation Prior Dismantling Of Motor And Withdrawal Of Rotor, Renewal Of De/Nde Ball Bearing, Painting Of Heat Resistive Paint On External/Internal Part Of Yoke, Apply Of Varnish And Baking Up For 10 Hour.Recording Of Insulation, Starting /Running Current And Proving Of Motor For Satisfactory Operation On Completion Of Overhauling.(Maintenance Schedule No. Lp-45). Spares – Cg Supplymaterial – Firm Supplydescription Specification Qtystand By Lo Pump415v,3P,30Kw 02Motor For Cppstand By Servo Oil415v, 3P, 18.5Kw 02Pump Motor For Cpp , Cpp (M/S Rolls Royce)278 - Overhaul02innoluboilcpp(Standby)Pumpmotorstardeltastarter. Overhauling Includes Cleaning/Renewal Of Magnetic Contactor( Lc1 D65), Qty-02 Nos, Aux. Contactor (Ca2 Dn22), Qty – 02 Nos, Control Transformer 415/230V, 90Va, Qty – 02 Nos, Timer (Dmb 01), Range – 0.1 Sec To 10 Sec, Qty- 04 Nos, Calibration Of Over Load Relay (Lr 2D33) Range, 10 – 55 A, Qty- 02 Nos And Ammeter (0-80A), Qty- 02 Nos.Starter To Be Proved For Satisfactory Operation On Completionofoverhaulingwithmotor.Calibrationcertificatewithlimitstobe Handed Over To Ship. (Maintenance Schedule No. Lp-45). Spares – Cg Supplymaterial – Firm Supply Calibration Certificate To Be Provided By Firm. , Cpp (M/S Rolls Royce)279 - Overhaul 02 In Noservo Oil(Stand By) Pump Motor Star Delta Starter,Magnetic Contactor (Lc1 D50), Qty- 02 Nos And Aux. Contactor (Ca2 Dn22), Qty – 02 Nos), Control Transformer, 415/230V, 90 Va, Qty – 02 Nos, Timer (Dmb 01), Range – 0.1 Sec To 10 Sec, Qty- 04 Nos,Calibration Of Over Load Relay (Lr 2D33) Range,10 – 55A, Qty- 02 Nos And Ammeter (0-80A), Qty- 02 Nos.Starter To Be Proved For Satisfactoryoperationoncompletionofoverhaulingwithmotor.Calibration Certificate With Limits To Be Handed Over To Ship.(Maintenance Schedule No. Lp-45)Spares – Cg Supplymaterial – Firm Supply Calibration Certificate To Be Provided By Firm. , Water Mist System (M/S Grundfos, Hungary)280 - Overhaul 01 In No Motor 415V, 3Phase, 50Hz, 5Kw. Overhauling Includes Record Of Insulation Prior Dismantling Of Motor And Withdrawal Of Rotor, Renewal Of De/Nde Ball Bearing, Painting Of Heat Resistive Paint On External/Internal Part Of Yoke, Apply Of Varnish And Baking Up For 10 Hour.Recording Of Insulation, Starting/Running Currentandprovingofmotorforsatisfactoryoperationoncompletionof Overhauling. (Maintenance Schedule No. Lp-45). Spares – Cg Supplymaterial – Firm Supply , Foam Liquid Transfer Pump Motor (M/S Grundfoss)281 - Overhaul 02 In No Foam Liquid Transfer Pump Motors 415 V, 3 Phase, 50Hz, 7.5Kw. Overhauling Includes Record Of Insulation Prior Dismantling Of Motor And Withdrawal Of Rotor, Renewal Of De/Nde Ball Bearing (6206-Z& 2308B), Painting Of Heat Resistive Paint On External/Internal Part Of Yoke, Apply Of Varnish And Baking Up For 10 Hour. Recording Of Insulation, Starting/Running Current And Proving Of Motor For Satisfactoryoperationoncompletionofoverhauling. (Maintenance Schedule No. Lp-44) Spares – Cg Supplymaterial – Firm Supply , Foam Liquid Transfer Pump Motor (M/S Grundfoss)282 - Overhaul 02 In No.Foam Liquid Transfer Pump Motor Control Panel. Overhauling Includes Servicing /Renewal Of Magnetic Contactor (Lc1-D25 Am70) Rated 25 A With Operatingcoil220-240Vacwith1no+1Nc,Qty-02,Controltransformer 440/230Vac 50Va Qty -02, 230 V Ac Relay (Rsb2a080p7s) 2 C/O With Led And Base Along With Clamp, Qty- 06 Nos) Calibrateover Load Relay (Lrd-22) Range 16 -24 A Qty -02 Nos. Calibration Certificate To Be Handed Over To Ship.Spares – Cg Supplymaterial – Firm Supply , Hydraulic Power Pack Motor (Oro) (M/S Att Electricals)283 - Overhaul 04 In No Hydraulic Power Pack Pump Motor 415V, 3Phase, 50Hz, 90Kw, (Make- Att Electricals). Overhauling Includes Record Of Insulation Prior Dismantling Of Motor And Withdrawal Of Rotor, Renewal Of De/Nde Ball Bearing, Painting Of Heat Resistive Paint On External/Internal Of Yoke, Apply Of Varnish And Baking Up For 12 Hours. Recording Of Insulation, Starting/Running Current And Proving Of Motor For Satisfactory Operation On Completion Of Overhauling. (Maintenance Schedule No. Lp-46) Spares – Cg Supply Material – Firm Supply , Hydraulic Power Pack Motor (Oro) (M/S Att Electricals)284 - Overhaul 04 In No Auto Transformer Starter Control Panel.Overhaulingincludes Starter Auto Transformer, 94 Kw, 125 Hp, Qty – 04 Nos, Control Transformer 415/110 V, 300 Va, Qty- 04 Nos), Magnetic Contactor (Sc-N8 180), Qty – 04 Nos), Contactors (Sc-N5 93 &Scn365), Qty- 04 Noseach, Timer(H3ja) Range, 01 – 10 Sec, Qty – 04 Nos, Calibrate Over Load Relay (Tr-N 8/3),Range, 125A – 185A, Qty– 04 Nos), Ammeter Range, 0-400 A, Qty – 04 Nos, Starter To Be Proved For Satisfactory Operation On Completion Of Overhauling With Motor. Calibration Certificate With Limits To Be Handed Over To Ship. (Maintenance Schedule No. Lp-46). Spares – Cg Supplymaterial – Firm Supplycalibration Certificate To Be Provided By Firm. , Steering Gear System And Auto Pilot (Make-M/S Rolls Royce & M/S Anschutz)285 - Overhaul 04 In No Hydraulic Mono Block Pump Motor 415 V, 3 Phase, 50Hz, 9.5Kw, (Make- M/S Rolls Royce & M/S Anschutz). Overhauling Includes Record Of Insulation Prior Dismantling Of Motor And Withdrawal Of Pump And Rotor, Renewal Of De/Nde Ball Bearing, Painting Of Heat Resistive Paint On External/Internal Part Of Yoke, Apply Of Varnish And Baking Up For 10 Hour. Record Of Insulation, Starting/Running Currentand Proving Of Motor For Satisfactory Operation From 0-35 Degreeport, 35 Degree Port To 0 Degree,0 To35 Degree Stbd, 35 Degreestbd To 35 Degree Port And Vice-Versa, All Reading To Be Recordedwithtime Take For Each Operation On Completion Of Overhauling Of Motor And Starter During Sats. Record Limit And Error Of System For Optimum Performance. (Maintenance Schedule No. Lp-17)Spares – Cg Supplymaterial – Firm Supplycalibration Certificate To Be Provided By Firm. , Group Starter Panel (M/S Marine Electricals)286 - Overhaul 04 In No Group Starter Panel (Gsp). Gsp Consist Of Under Mentioned Equipment Starter Panel. Overhauling Includes Cleaning Of Mcbs, Magnetic Contractor Contact, Calibration Of Over Load Relay & Timer, Control Transformer, Renewal Of Defectiveelmax, Connectors,Allstarter To Be Proved For Satisfactory Operation On Completion Of Overhauling With Motor. Calibration Certificate With Limits To Be Handed Over To Ship. (Maintenance Schedule No. Lp-47).(Main Contactormake- Telemecanique) A)Sw Cooling Pump Ref-1 (0.75Kw)B)Sw Cooling Pump For Ac Plant- 1(9Kw)C)Me Lub Oil Priming Pump No-1 (5.5Kw)D)Lub Oil Transfer Pump Main(2.2Kw)E)Fuel Oil Transfer Pump No-1(6.5 Kw)F)St By Fo Booster Pump Me-1(1.5 Kw)G)Sludge Pump(1.5Kw)H)Sw Cooling Pump Ref-2 (0.75Kw)I)Sw Cooling Pump For Ac Plant-2(9Kw)J)Me Lub Oil Priming Pump No-2 (5.5Kw)K)Lub Oil Transfer Pump Main/Aux(2.2Kw)L)Fuel Oil Transfer Pump No-2(6.5Kw)M)St By Fo Booster Pump Me-2(1.5Kw)N)Hydraulic Oil Transfer Pump(1Kw)O)Hot Water Circulating Pump-1 (2.2Kw)P)Hot Water Circulating Pump-2 (0.37Kw)Q)Sewage Discharge Pump(9Kw)R)Transfer Pump Dispersant (4Kw)Spares – Cg Supply Material – Firm Supplycalibration Certificate To Be Provided By Firm. , Fi-Fi Control Panel (M/S Aker Kvaerner)287 - Overhaul Complete Fi-Fi Control System Panel At Mer And Bridge. Overhauling Includes Cleaning Of Magnetic Contactors (3Rt 1016), Qty- 09 Nos, 24 V Dc Relays With No/Nc Contacts, Qty- 55 Nos. Calibrate Olr (3Rv 1011-1 Da10) Range, 2.2 A To3.2A,Qty-02No,Timers(H3dem1),0-13Sec,Qty-06No,Calibration Certificate To Be Handed Over To Ship. Spares – Cg Supply.Material – Firm Supply. Calibration Certificate To Be Provided By Firm. Total Quantity : 1