|
| 1 | Earth work : |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kinds of soil |
| 3 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level: 1:4:8 ( 1 Cement: 4 fine sand : 8 graded well burntbrick aggregate 40 mm nominal size) |
| 5 | First class brick work in foundation and plinthincluding cost of all materials as required complete In cement mortar 1:4 ( 1 cement : 4 fine sand ). |
| 6 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement- -All work upto plinth level: 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) |
| 7 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement-. 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) |
| 8 | Centering shuttering including struttings, propping etc. and removal of form work for:Foundations, footings, bases for columns etc. for mass concrete with timber plank. A. Retaining Wall |
| 9 | Centering shuttering including struttings, propping etc. and removal of form work for:Foundations, footings, bases for columns etc. for mass concrete with timber plank. B. Retaining Wall |
| 10 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe - 500D or more. Quantity vide item no. 5 & 6 |
| 11 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.All kinds of soil |
| 12 | 6 mm cement plaster in single layer finished with a floating coat of neat cement, curing and a thick coat of lime wash on top when dry on wall bearings for RCC slabs and beams complete. Cement mortar 1:3 (1 cement : 3 fine sand) |
| 13 | 12 mm cement plaster of mix Cement mortar 1:4 (1 cement : 4 fine sand) Neat cement punning. |
| 14 | Providing and laying cement concrete 1:2:4 (1 cement: 2 fine sand : 4 graded well burnt brick aggregate) flooring finished with a floating coat of neat cement including cement slurry, rounding of edges and strips and cost of glass strips etc. complete.40mm thick. |
| 15 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.-All kinds of soil |
| 16 | Providing and laying dry flat brick flooring in required pattern complete |