Construction Of Solid Waste Management System At Dr Ysp University Of Horticulture And Forestry Nauni, Solan ( Sh- Providing Sanitary Napkin Incinerator ) . Construction Of Solid Waste Management System At Dr Ysp University Of Horticulture And Forestry , Nauni, Solan-Himachal Pradesh
TDR : 30316125
Tender Notice
BOQ
Expired
Nauni, Solan
Himachal Pradesh
Construction Of Solid Waste Management System At Dr Ysp University Of Horticulture And Forestry Nauni, Solan ( Sh- Providing Sanitary Napkin Incinerator ) . Construction Of Solid Waste Management System At Dr Ysp University Of Horticulture And Forestry
Name of Work: Construction of solid waste management system at Dr YSP University of Horticulture and Forestry Nauni, Solan (SH:-Providing Sanitary Napkin Incinerator ).
Sl. No.
Item Description
1
Supplying, installing, testing and commissioning of Sanitary Napkin Incinerator with the Equipment Material –mild steel powder coated, Inner Construction – Stainless steel, Burner Capacity 200 - 1000 Napkins per day, Power – 220-240 V / 7.5A , 50HZ, Combustion Chamber – Primary chamber, Burning chamber - Refectory lined, Burner Quantity – Single Igniter, Fuel – Electricity, Operating / working temperature –600 degree C, Water tank – 40 Liters. Feed mode – Manual, Panel – All controllers and indicators on separate panel, Temperatrue monitoring – Digital controlled and indicator, Thermostatis Device – Yes, Emergency stop – Yes, Movable – Yes, Auto Stop – Yes, Automatic Process Control – Yes,Ash Removal provision –Yes (Manually), Odourless, Aspirator, Smoke treated, Water treated, PH value, Comply with Pollution etc. Complete in all respect as per satisfaction of Engineer-in-Charge /Activity Incharge.Condition :-a)The machinery should be technically quality based and of latest technology.b)One year comprehensive warranty.c) No advance will be given to the firm / supplier for the material to be supplied by them.d) The incinerator supplied by the firm will be tested for trial at least 15 days and if any kind of deficiency / fault observed during trial period then the incinerator will be returned to the firm and nothing will be paid to the firm / supplier and the firm will be fully responsible to bear the expenses incurred andin addition to it firm will also provide training to University persons / employees to operate the machine.e) The entire process involves waste feeding, combustion at high temperature in refractory lined chambers and should be emission treated smoke to the atmosphere.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.