Bids Are Invited For Service1 - Operation And Maintenance Of Electric Driven Pump Set With 01 ( One ) Semi Skilled Fgm Including Its Periodical Maintenance Such As Gland Packing, Lubricants, Cleaning Properly To Keep Dust Free All The Time With One Operator Per Shift, Each Shift Of 08 Hours For Duration Of 24 Hrs Including Sunday And Holidays For The Following Pump Sets Atbhanada Pump House Complete All As Specified And Directed And As Detailed Below:- ( A ) Centrifugal Pump Sets - 5 Nos, Each Of Capacity 60 Hp ( Pump House No 1 & 2 ) ( B ) Submersible Pump Sets - 6 Nos Each Of Cap 40 Hp ( Bore Well No 5, 6, 7, 8, 9 & 10 ) ( C ) Dg Set Of Capacity 250 Kva - 01 No ( D ) Lt Panel For Pump Set, Dg Set And Bore Wells - 09 Nos. , Service2 - Operation And Maintenance Of Ro Plant With 01 ( One ) Semi Skilled Fgmincluding Its Periodicalmaintenance Such As Gland Packing, Lubricants, Cleaning Properly To Keep Dust Free All The Timewith One Operator Per Shiftseach Shift Of 08 Hours On Two Shiftsa Day Including Sunday And Holidays ( 1St Shift 06.00 Hrs To 14.00 Hrs And 2Nd Shift 14.00 Hrs To 22.00 Hrs ) For Durationof 16 Hrs For Following Pump Anddg Sets Installed At Ro Plant In Domestic Area, Near Urccomplete All As Specified And Directed By Engineer-In-Charge And As Detailed Below :- ( A ) High Pressure Pump Sets , Cap 5 Hp- 02 Nos ( B ) Low Pressure Pump Sets , Cap 4 Hp - 2 Nos ( C ) Chloronome Plant Decrin Dozing Type - 02 Nos ( D ) Monoblock Submersible, 2 Hp Capacity-01 Nos ( Waste Water Ug Sump ) ( E ) Lt Panels Of Pump Sets-03 No ( F ) Dg Set Of Capacity 30 Kva-01 No , Service3 - Operation And Maintenance Of Ro Plant With 01 ( One ) Semi Skilled Fgmincluding Its Periodicalmaintenance Such As Gland Packing, Lubricants, Cleaning Properly To Keep Dust Free All The Timewith One Operator Per Shiftseach Shift Of 08 Hours In One Shifta Day Including Sunday And Holidays ( 08.00 Hrs To 16.00 Hrs ) For Durationof 08 Hrs For Following Pumping Set Installed At Ro Plant In Mrsam In Tech Areacomplete All As Specified And Directed By Engineer-In-Charge And As Detailed Below :- ( A ) High Pressure Pump Sets , Cap 3 Hp- 02 Nos ( B ) Low Pressure Pump Sets , Cap 2 Hp - 2 Nos ( C ) Chloronome Plant Decrin Dozing Type - 01 Nos ( D ) Monoblock Submersible, 3 Hp Capacity-04 Nos ( Adm Bldg And Chiller Plant ) ( E ) Lt Panels Of Pump Sets-03 No , Measurable Item 4 - Clear Site From All Rubbish, Cut Down Shrubs, Under Growth And Small Trees Not Exceeding 600Mm Girth, Grab Up Roots And Burn Or Remove From Site Complete All As Specified & Directed. , Measurable Item 5 - Preventivemaintenance Of Electronicliquid Chlorinedosing Plant For Water Disinfactant Of Cap Upto 6 Lph Any Makeincluding Checking Serviceability Of Injector , Valves , Discharge And Suction Tube , Knob For Speed / Strokecomplete All As Specified And Directed. , Measurable Item 6 - Testing Of Drining Water Collected From Local Source ( Bore Wells / Ug Sumps / Ro Plants In The Area Ofage E / M ( Af ) Naliya, And Submission Of Detailed Test Report To The Office Of Engineer-In-Charge. ( I ) Carrying Out Minimum Essential Testing Of Water As Per Is 10500-2012 Mandatory For Chemical Colour, Odour, Taste, Turbidity, Ph Value, Tds Total Hardness, Iron, Chloride, Fluoride And Residual Free Chlorine And Bacteriological Total Coliform Organisms Per 100 Ml ( Mpn ) And E Coli In 100 Ml ) With Specific Recommendation Regarding Suitability Of Water For Drinking Purposes. ( Ii ) Collection Of Water From Different Sources Of Water Ie. Sump, Bore Wells & Shallow Well In A Sterilized Bottle And Testing In Nabl Approved Laboratory. Note :- Rate Quoted Shall Also Deemed To Be Included For The Followings:- ( I ) Cost Of Sterilized Bottle As Required. ( Ii ) To And Fro Transportation Charges For Collection Of Samples From Source ( Sump, Bore & Shallow Wells ) Total Quantity : 1